CCMtg03-06-89WSMinOD6, F1909DA
PaesEM r. ray
D¢puty tM
Bullington
in9
Engineering
Jeff x Engineering
Administrator
Ge ra l2ambrierDeputy tC iytyCClerk
Rrc ha rd 5. y r, Jr., C y ttor y
1. y xaray called the work session to order at 6~I0 P.M.
2. DISCUSSION OF MASTER WASTEWATER COLLECTSON PLAN.
cry i roauced M and M Jeff H e from Cochrane
Engineerin gna nry¢t explain the loan p ocess to fund
iefed t Plan
prepared ybyr ochrane¢Eng in Bering font si ty of s Dogwood and
xplainea t the plane [he C Dula have t
system oinf plat e. xpla inea yt
tell of¢>3 omajor projec t.s. ted et ity c implement
of the plan G all ofe the plan M1e ted t e firs[
ana i~a~s erial a
andsa e¢Cac 42]/EN-434r r ith the final ephase
ing r snide o
ted to only a 20% o nby
bneatt iL n these
erbuiltWeT sx(pre sriaentia lt) uldeb faDOUt $40ep
. doing SOw projeci:s, r Dula be w53], v doing all 23
projects, the r ou la be approximately 538.00 spec m nth.
endat ion would be to build all 23 projects
over a twe lvenyear pe rGa.
explained t Florida Department of E
Negulation has loan prog ams n ailable, 1008 t and c
sign a ontra<C dam finis tration tfor
pro3ects ds
a S8.u teae their ¢il ial r endationlw ulawb
su bm i[ E undingsf r projects 2, I antl 9 itD
projects 5 0 23 0 Delano ingep n for inclusion for future
wlt alreaav ~aaer Bois
proje ng don ord in
tea they w ookiny Eor aireciiontf
hey a d for n
e years Pr tediT rage 5860 .OOy p
r EOr 12 yea
mae~er >~ whrcn ene prolecta are nemD¢r¢a rs imporza~c re¢¢aes¢ each
M r moo= d