CCMtg11-10-80WS'19re Sonngimd City Cwmi C 3:00 o.m. i a Nbrkstwo
Engineering e rrrs to wnd1uct s[vdy on aru~er city tJater Syst
The tollaaing firms naae presentations to the Cmmissicn wtuch were £o11w.Md ]ry
a brref guestion and answer period:
. Dale Mills and Mr. Alan Arent representing firm of Sverdrup s rel.
Representatives said ~~rk wind take approximately 6 rtonths to amplete
and xegvixe 500 m 600 nv~n hours.
Kn Shcmrk, tir Walter Hayes and Mr. Al Iana representrng firm of Russell
and Axon. Representatives said work mould Yorke 3 to 3~ mmtFVS to ¢niQlete and
ra3vire 500-600 man imurs.
1r. Jerry HazV~an an ul Chetre representing firm of Carp, D and
Mct(ee. Aepresen said work mould take 2 to 3 rtmttss to crn{~lete and
require approximately 400 rtan trours.
Holley and [Ar. Dink tYnderson representing frim of CN2M and Rill.
said wxk mould Take 2 to 3 aonths and raEUire appmxurately
150 man daysVes
. JMn CsaNdd and 57c'. Mike ~wnry representing firm of Reynolds, SrtSth and cull.
RepxesuitaTiws stated wrk wind take Cetveen B and 12 wmhs to oaolete and
xaiui.m apoxoximately 350 man hours.
Ritl< Coleman an representing firm of myle Fnginrerv~g.
I~presentatives stated that theyRwere not in a lnsition to discuss tyre wired
or ran hours inwlved until snipe of wxk had lean Mined.
2. At the m. of the presentations Mr. Charey stated that he remmmndea that
the Comnissionrdefernany se cn due to the differenrns in the vaz us proposals.
Cha2y suggested Uat the Cmmi on postEVne selection pxornss wril [.bverber
17, 1960 at which tine he mould hawsthe differences resolved.
a, srne c~ma.ssion aa~ournea at s:u p.m.
irks ~ V"~t~
city of irm9wrod, Florida
-.~`2`=~