Resolution 85-534A RESOLUT [ON OF THE CITY IG) 115510N OF THE CITY
OF LONGWDOD, FLORIDA, AUTHORIZING AMENDMENT TO
THE EXISTING CONSTRUCTION CONTRACT BETWEEN THE
CITY OF LONGW000, FLORIDA AND LEE CONSTRUCTION CO,
BY INCREASING COST OF CONSTRUCTION FROM $512,100 TO
5562,500; AUTHORIZING THE BUDGETING OF 441,I00 FOR
ENGINEERING DURING CONSTRUCTION AND $1 ,200 FOR MATERIAL
TESTING AND PROV [DING FOR AN EFFECTIVE DATE
WHEREAS, the City Coimni ssion has determined that the existing
contract for the co nstrocti on of a ground water storage tank and improvements
at Water Weil Number Two requires amendment to provide additional funds to pay
for equipment omitted from original contract; and
WHEREAS, the City C... iss ion has determined that the additional
equipment and engineering fees during c nstruc ti on and naterial tests during
the cgnstructi On dre necessary and required;
r•
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY
OF LOMGCPO0, FLORIDA, AS FOLLOWS:
1. That the existing contract between the City of Longwood, Florida,
Ad Lee Construction Co. of Sanford, Florida, is hereby amended to increase the
total fees for construction to $562,500 from $512,100.
2. That a sum of $41,700 is hereby authorized far payment of engineering
during construction.
3. That a sum of $1,200 is hereby authorized for payment of material testing
during construction (sails testing, concrete testing, etc.).
3. That a contingency amount of $30,270 (5 percent) is hereby authorized
r' if required.
4. That this Resolution shall become effective immediately upon passage
and adoption.
PASSED AND ADOPTED THIS I ✓ DAY OF A.D. 1g85