Loading...
Resolution 85-534A RESOLUT [ON OF THE CITY IG) 115510N OF THE CITY OF LONGWDOD, FLORIDA, AUTHORIZING AMENDMENT TO THE EXISTING CONSTRUCTION CONTRACT BETWEEN THE CITY OF LONGW000, FLORIDA AND LEE CONSTRUCTION CO, BY INCREASING COST OF CONSTRUCTION FROM $512,100 TO 5562,500; AUTHORIZING THE BUDGETING OF 441,I00 FOR ENGINEERING DURING CONSTRUCTION AND $1 ,200 FOR MATERIAL TESTING AND PROV [DING FOR AN EFFECTIVE DATE WHEREAS, the City Coimni ssion has determined that the existing contract for the co nstrocti on of a ground water storage tank and improvements at Water Weil Number Two requires amendment to provide additional funds to pay for equipment omitted from original contract; and WHEREAS, the City C... iss ion has determined that the additional equipment and engineering fees during c nstruc ti on and naterial tests during the cgnstructi On dre necessary and required; r• NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LOMGCPO0, FLORIDA, AS FOLLOWS: 1. That the existing contract between the City of Longwood, Florida, Ad Lee Construction Co. of Sanford, Florida, is hereby amended to increase the total fees for construction to $562,500 from $512,100. 2. That a sum of $41,700 is hereby authorized far payment of engineering during construction. 3. That a sum of $1,200 is hereby authorized for payment of material testing during construction (sails testing, concrete testing, etc.). 3. That a contingency amount of $30,270 (5 percent) is hereby authorized r' if required. 4. That this Resolution shall become effective immediately upon passage and adoption. PASSED AND ADOPTED THIS I ✓ DAY OF A.D. 1g85 MRCybSr of LnPH—d, F rich ATTEST: City Cy ark �� J-