Resolution 09-1238RESOLUTION NO. 09-1238
A RESOLUTION OF THE CITY COMMISSION OF
THE CITY OF LONGWOOD, SEMINOLE COUNTY,
FLORIDA ESTABLISHING REVISED BUILDING
PERMIT AND BUILDING, PERMIT RELATED
FEES; AND ESTABLISHING METHOD FOR
DETERMINING VALUATION OF BUILDINGS;
PROVIDING AN EFFECTIVE DATE.
WHEREAS, Section 553.80 Florida Statutes Enforcement authorizes the
governing body of a municipality to provide a .schedule of fees for the enforcement of the
provisions of the Florida Building Code; and
WHEREAS, Article I of Chapter 18 of the Code of Ordinances, City of
Longwood, Florida provides for the establishment of building and related permit fees by
resolution of the City Commission; and
NOW, THEREFORE, BE IT RESOLVE, :D BY THE CITY COMMISSION OF THE
CITY OF LONGWOOD, SEMINOLE COUNTY, FLORIDA:
Section 1: That the following schedule of fees be established for Building Permits and
related services.
SCHEDULE OF FEES FOR CITY OF LONGWOOD BUIDLING DEPARTMENT
Method for Determining Value of Buildings.
Construction Cost / Valuation will be calculated using the "Building Valuation Data"
chart as published in the most current, October edition of the Building Safely Jourracal, a
publication of the International Code Council, or the contracted price, whichever is
greater.
In those instances in which valuation is based on the contractor's estimate, the contractor
shall provide such verification as the Building Official may require, such as the written
contract between contractor and owner. If the contractor fails to provide such
verification, the Building Official may, in his or her sole discretion, determine the
valuation based on the value of construction of proposed work.
Filty percent of the permit fee will be paid in advance for plan review and shall not be
eligible for refund.
Group I: Sinjzle Family detached residential and two family attached residential:
new construction
Square feet
Fees
Up to 2,500
$2,000.00
2,501 to 3,250
$2,500.00
3,251 to 4000
$3,000.00
4001 to 5,000
$3,750.00
5001 to 6,000
$4,500.00
6,001 and larger
$6,000.00
Square footage includes main structure, garage, porch, and lanai. Fee includes up
to two plan reviews, routine inspections, and all subcontractor permit fees.
Additional fees:
Additional plan review/revisions
Reinspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Reissue of permit to new contractor
Renewal of expired permit
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge
Master file engineering
Penalties:
Per occurrence:
$25
$35/$50 same reason
$25
$25
$75
$50hr/$100 minimum
$25
30% of original fee/$75 minimum
$10
As dictated by state statute
$50
Any person commencing work without a permit shall be subject to a fee double the
permit fee. ;
Refunds:
For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that
have begun construction shall not be eligible for a refund..
Plans:
Two sets• of -drawings shall be submitted with -all applications. Additional sets may be
submitted at the time of application to be stamped at no additional charge.
Other fees and charges:
M
The applicant is responsible for other related. fees and charges not enumerated in this
Chapter prior to receiving building pert -nits as required bylaw. These include, but are not
in
limited to, City utility impact fees and Serninole County impact fees.
If a permit is not renewed prior to the expirai'ion date, the applicant will be required to
resubmit plans and specifications for the appropriate category and pay the appropriate
fees.
Group 11: Addition and sh-uctural alteratiion to single family detached residential
and two family attached residential, detached structures, and swimming pools.
Valuation
Up to $2,500.00
$2,500.01 to $10.000.00
$10,000.01 to $50.000.00
$50,000.01 to $100,000.00
100,000.01 and up
Additional fees:
Additional plan review/revisions
Reinspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Reissue of permit to new contractor
Renewal of expired permit
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge
Master file engineering
Penalties:
1F1_es
$`i0.00
$100.00
$:300.00
$500.00
$'750.00
Per occurrence:
$25
$:35/$50 same Reason
$25
$25
$'75
$50hr/$100 nlinimuni
$:? 5
0% of original fee/$75 minimum
$10
As dictated by state statute
$50
Contractors commencing work without a pern-:.it shall be subject to double the permit fee.
Refunds:
For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that
have begun construction shall not be eligible for a refund.
Plans:
Two sets of drawings shall be submitted with all applications. Additional sets may be
submitted at the time of application to be stamped at no additional charge.
Other fees and charges:
The applicant is responsible for other related fees and charges not enumerated in this
Chapter prior to receiving building permits as required by law. These include, but are not
limited to, City utility impact fees and Seminole County impact fees.
If a permit is not renewed prior to the expiration date, the applicant will be required to
resubmit plans and specifications for the appropriate category and pay the appropriate
fees.
Group III• Commercial, Industrial, Multifamily: new construction and additions or
structural alterations
Valuation
Up to $2,500.00
$2,500.01 to $10.000.00
$10,000.01 to $50.000.00
$50,000.01 to $100,000.00
$100,000.01 to $250,000.00
$250,000.01 to $500,000.00
$500,000.01 to $1,000,000.00
over $1 million to $5 million
over $5 million to $12.million
over $12 million to $25 million
over $25 million and larger
Fees
$100.00
$300.00
$500.00
$1000.00
$2,000.00
$4,000.00
$7,000.00
$7,000.00 for the first 1 million
valuation plus $.008 times the remaining
valuation.
$38,000.00 for the first 5 million
valuation plus $.007 times the remaining
valuation.
$80,000.00 for the first 12 million
valuation plus $.006 times the remaining
valuation.
$145,000.00 for the first 25 million
valuation plus $.005 times the remaining
valuation.
Digital copies of all as-builts shall be submitted prior to issuance of a certificate of
occupancy.
Additional fees:
Additional plan review/revisions
Reinspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Per occurrence:
$25
$25/$50 same reason
$25
$25
$100
$50 hr/ $100 minimum
�i
Reissue of permit to new contractor
Renewal of expired permit
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge
Temporary CO
Master file engineering
Penalties•
$25
30% of original fee/$75 minimum
$1 0
As dictated by state statute
$100
$50
Contractors commencing work without a permit shall be subject to double the permit fee.
Refunds:
For projects that are cancelled after fees are paid, a 75% refimd shall apply. Projects that
have begun construction shall not be eligible for a refund.
Plans•
Two sets of drawings shall be submitted with all applications. Additional sets may be
submitted at the time of application to be stamped at no additional charge.
Other fees and charges:
The applicant is responsible for other related fees and charges not enumerated in this
Chapter prior to receiving building permits as required by law. These include, but are not
limited to, City utility impact fees and Seminole County impact fees.
If a permit is not renewed prior to the expiration date, the applicant will be required to
resubmit plans and specifications for the appropriate category and pay the appropriate
fees.
Group IV: Single family and two fauiiily residential miscellaneous
Any one or two family residential work that does not meet the criteria of Group I or
Group II shall be charged a fee of $50.
Additional fees:
Additional plan review/revisions
Reinspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Reissue of permit to new contractor
Renewal of expired permit
Pin- occurrence:
$25
$35/$50 same reason
$25
$25
$75
$:50hr/$100 minimum
$25
Duplicate of permit (lost, stolen, etc) $10
Radon gas surcharge As dictated by state statute
Master file engineering $50
Penalties:
Contractors cominencing work without a permit shall be subject to double the pen -nit fee.
Refunds:
For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that
have begun construction shall not be eligible for a refund.
Plans:
Two sets of drawings shall be submitted with all applications. Additional sets may be
submitted at the time of application to be stamped at no additional charge.
Other fees and charlzes:
If a pernut is not renewed prior to the expiration date, the applicant will be required to
resubmit plans and specifications for the appropriate category and pay the appropriate
fees.
Group V: Commercial, Industrial and Multifamily Miscellaneous
Any commercial, industrial, or multifamily work that does not meet the criteria of Group
III shall be charged a'fee as follows:
Up to $2,500.00
$100.00
$2,500.01 to $10.000.00
$250.00
$10,000.01 to $50.000.00
$500.00
$50,000.01 to $100,000.00
$750.00
$100,000.01 to $250,000.00
$1500.00
$250,000.01 and up
$3500.00
Digital copies of all as-bui'lts shall be submitted prior to issuance of a certificate of
occupancy.
Additional fees:
Additional plan review/revisions
Reinspections
Re -stamp plans
Change any or all subs
Pre power
Fee per occurrence:
$25
$35/$50 same reason
$25
$25
$100
After hour inspections
Reissue of permit to new contractor
Renewal of expired permit
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge
Temporary CO
Master file engineering
Penalties
$_;0hr/$100 miriimuuii
$2 5 '
30% of original-fee/$75 iriinimum':
$10
As dictated by -state statute w
$100 -_
Contractors commencing work without a permit shall be subject to double the permit fee.
Refunds:
For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that
have begun construction shall not be eligible for a refund.
Plans:
Two sets of drawings shall be submitted with all applications. Additional sets may be
submitted at the time of application to be stamped at no additional charge.
Other fees and chart4es:
The applicant is responsible for other related. fees and charges not enumerated in this
Chapter prior to receiving building permits as required by law. These include, but are not
limited to, City utility impact fees and Seminole County impact fees.
If a permit is not renewed prior to the: expiration date, the applicant will be required to
resubmit plans and specifications for the appropriate category and pay the appropriate
fees.
Section II: Conflicts. Any resolutions or policies in conflict herewith are hereby
repealed.
Section III: This resolution shall become effective immediately upon adoption.
PASSEL) BY THE CITE' CO.IVVLVIIS,S.ION OF LONGWOOD, FLORIDA, IN
'" �nnn
REGULAR SESSION THIS • - IJA T CT7T! TA,rnr ,7
ATTEST:
Sarah M. Mirus, MMC, MBA, City Clerk
Approved as to form and legality for the use and reliance of the City of Longwood,
Florida only.
Teresa S. Roper, ity Attorney
�i