Loading...
14-1356 Establishing Fee Schedule for the Community Development Services DeptRESOLUTION 14-1366 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF LONGWOOD, FLORIDA, REGARDING AND ESTABLISHING A FEE SCHEDULE FOR THE COMMUNITY DEVELOPMENT SERVICES DEPARTMENT, RIGHT-OF-WAY UTILIZATION, AND POLITICAL SIGNS; REPEALING RESOLUTION 12-1323; PROVIDING FOR RETROACTIVITY AS TO FEES FOR POLITICAL SIGNS AND AUTHORIZING REFUNDS RELATING THERETO; PROVIDING FOR CONFLICTS, SEVERABILITY, AND AN EFFECTIVE DATE. WHEREAS, the City Commission of the City of Longwood (the "City") has determined that amendments to the City Fee Schedule are desirable as to fees relating to the Community Development Services Department, right-of-way utilization, and political signs, and WHEREAS, the City intends that certain political sign fees be made retroactive to May 1, 2014, and the City authorizes the disbursement of refunds for political signage fees paid on or after May 1, 2014, in accordance herewith, NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Longwood, Florida, as follows SECTION I: SCHEDULE OF FEES The following schedule of fees shall be established for Community Development Services, right-of-way utilization, and political sign fees (1) Right-of-way utilization All right-of-way utilization work requiring a city permit shall be paid to the Public Works Department in accordance with the schedule stated below - a Inspection of utilization of right-of-way- 1 Longitudinal installations. Basic fee - Cut less than 1 foot wide (per 100 feet *) - Cut 1 foot to 3 feet wide (per 100 feet *) Cut greater than 3 feet wide (per 100 feet *) Directional bore (per 100 feet*) *or fraction thereof 2 Transverse installation Basic fee Open cut — paved areas (each cut) - Cut greater than 15 square feet 90 00 plus 1 75 425 800 175 90 00 plus 27000 - Cut 15 square feet or less 5000 b Open cut unpaved areas (each cut) 10800 c. Bore and jack (each operation) 10000 d Directional bore (each operation) 10000 e New overhead utilities, for nonfranchised companies f Basic fee for installation of poles (other than repair or maintenance) 75 00 plus - Poles up to 50 feet in height, per pole 1 50 - Poles over 50 feet in height, per pole 200 (for Telecommunication towers see that listing) g Upgrade work on previously permitted overhead utilities, for nonfranchised companies h Basic fee for work on previously permitted overhead utility poles (including the addition of intermediate poles in an existing overhead line) 28 00 plus i Charge per existing additional pole (per pole) 1 00 j Miscellaneous related charges 1 Reinspection 4100 2 Direct service drop No charge k. Maintenance on existing utilities No permit required I Right-of-way cut 2000 m Driveway construction 2500 n Irrigation permit 10 00* *per inch of pipe diameter or fraction thereof (2) The fee for Development applications, to be paid to the Community Development Services Department shall be as follows • Annexation o Single Family 20000 o All others 35000 • Administrative decision appeal 40000 • Conditional use permit o Major Conditional Use 150000 o Minor Conditional Use 120000 • Comprehensive plan o Small scale comp plan amendment 80000 o Large scale comp plan amendment 150000 o Comp Plan text amendment 80000 o Comp Plan determination letter 2500 o Comp Plan paper copy 3500 r7 o On compact disc • Development agreement (in addition to site plan fees) • Historic district (HD) in addition to other fees. o Application — HD project approval o Demolition permit • Longwood Development Code o Longwood development code text amendment o Map Amendment (Rezoning) o Amendment to Planned Development o Longwood development code copies Compact disc Paper copy • Information Requests o Development Analysis letter per site (without Pre-App) o Map/plan reproduction ■ Color map ■ Blueline/blackline prints o Research Fee o Written Request for Information o Zoning/Future Land Use letter Liquor License (Application and Inspection) • Outdoor Seating Application 1000 50000 2000 5000 50000 80000 120000 1000 5000 5000 Actual cost plus 10% 1000 actual cost 2500 2500 3500 • Paint Color Application and Inspection (when not part of site plan) 2500 • Planned Development Approval • Pre -Application Meeting (Fee credited against Site plan application fee) • Resurfacing/Restriping Parking Lot Permit 200000 15000 3500 • Special exceptions, administrative waivers, -and variances. o Variance 200 00 Residential 500 00 Nonresidential o Administrative waiver/modification 10000 o Administrative waiver/modification-appeal o Special exception (single-family residential) 3 20000 12500 o Special exception (multi -family residential and non-residential) 50000 o Special exception package (multiple non-residential exceptions) 120000 • Site Plan Review o Site plan review (major) 100000 plus $10 per du and $20 per 1000SF o Site plan review (minor) 25000 o Site plan revision (after approval) % the Review Fee • Subdivision review: o Lot Split 10000 o Conceptual plan 20000 o Preliminary plat 50000 o Final plat 75000 o Recording Actual • Temporary Sign Permit Waiver Application 5000 • Temoorary use permits (TUPs). 0 30-day temporary use permit 20000 0 24-hour Temporary Use Permit 5000 o Nonprofit (religious, charitable, youth, civic) 2000 o Temporary Use Permit Waiver Application 5000 o Monthly/recurring TUP or renewal 30000 • Tree Removal Permits o Nonresidential 3-inch to less than 8-inch DBH 50 00 per inch DBH 8-inch to less than 15-inch DBH 75 00 per inch DBH 15-inch to less than 24-inch DBH 100 00 per inch DBH 25-inch and greater DBH 115 00 per inch DBH o Residential (not owner occupied per LDC 3 5 5) $20 00 o Subdivision (per lot) $20 00 Permit fee is waived for the removal of a dead tree as verified to City's satisfaction • Vacation/abandonment 0 10000 (3) The fees for political signs shall be paid to the City Clerk asJollows Political Sign Fees Signs 6 square feet and under (covers all signs): 2500 Signs over 6 square feet (covers all signs) 1D0 00 If political signs are not removed within 7 days of the election; a $100 fine will be assessed to the candidate SECTION If: RETROACTIVITY OF FEES FOR POLITICAL SIGNS: REFUND AUTHORIZATION. The rates set forth in this Resolution for political signs shall be retroactive to May 1, 2014 The City is hereby authorized to issue refunds for political signage fees in excess of the rates charged above that were paid on or after May 1, 2014 All other fees set forth herein shall be prospective SECTION III: CODIFICATION In accordance with the respective City of Longwood Code of Ordinances and/or City of Longwood Development Code provisions that authorize the fees set forth in Section I of this Resolution, Section I of this Resolution shall be included in the relevant Appendices of the City of Longwood Code of Ordinances and/or the City of Longwood Development Code SECTION IV: REPEAL. Resolution No 12-1323, amending the schedule of fees for development review as it relates to Community Development Services, is hereby repealed and replaced by this Resolution SECTION V: SUPERSEDE This Resolution shall supersede any previous rules, policies, procedures, or resolutions to the extent of any conflict with this Resolution SECTION VI: SEVERABILITY If any portion of this Resolution is finally determined by a court of competent jurisdiction to be invalid, unconstitutional, unenforceable, or void, the balance of the Resolution shall continue in full force and effect. SECTION VII: EFFECTIVE DATE. This Resolution shall take effect immediately upon adoption PASSED AND RESOLVED this 4/0\ day of -� , 2014, by the City Commission of the City of Longwood, Florida. APPROVED: Robert Cortes, Mayor 4 ATTEST: Michelle Lon i rk Approved as to form and legality for the use and reliance of the City of Longwood, Florida only- W. ;., Fl -. 9