16-1418 Establishing Revised Building Permit and Building Permit Related FeesRESOLUTION NO. 16-1418
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF LONGWOOD, FLORIDA, ESTABLISHING
REVISED BUILDING PERMIT AND BUILDING
PERMIT -RELATED FEES; AND ESTABLISHING A
METHOD FOR DETERMINING VALUATION OF
BUILDINGS; PROVIDING AN EFFECTIVE DATE.
WHEREAS, Section 553.80 Florida Statutes Enforcement authorizes the governing
body of a municipality to provide a schedule of fees for the enforcement of the provisions of
the Florida Building Code; and
WHEREAS, Article H of Chapter 18 of the Code of Ordinances, City of Longwood,
Florida provides for the establishment of building and related permit fees by resolution of the
City Commission; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF LONGWOOD, SEMINOLE COUNTY, FLORIDA:
Section I: That the following schedule of fees be established for Building Permits and
related services are hereby amended as follows underlined language are additions, and
stiket4eu words are deletions; provisions not included are not being amended):
SCHEDULE OF FEES FOR CITY OF LONGWOOD BUILLING DIVISION
Method for Determining Value of Buildings.
Construction Cost / Valuation will be calculated using the most current published edition of
the `Building Valuation Data" chart as published b• the in the most eaffent, Oe4eber- editien
of theBugAig Saf ly JeuHi^' a publieatieii of the Code Council, or the
contracted price„ .t,i,; iter
In those instances in which valuation is based on the contractor's estimate, the contractor shall
provide such verification as the Building Official may require, such as the written contract
between contractor and owner. If the contractor fails to provide such verification, the
Building Official may, in his or her sole discretion, determine the valuation based on the value
of construction of proposed work.
Fifty percent of the permit fee will be paid in advance for plan review and shall be subject
to the refund policy. net be eligible f ---•^fffia
All permits are subject to a State Certification Surcharge and a State DBPR Surcharge
which is a minimum of $4.00 per permit or 3% of the permit valuation.
Resolution No. 16-1418 — Building Fee Schedule — Page 1 of 8
Plans:
A minimum of T two sets of drawings shall be submitted with all applications.
Digital copies of all as-builts shall be submitted prior to issuance of a certificate of occupancy.
Other fees and charges:
The applicant is responsible for other related fees and charges not enumerated in this Chapter
prior to receiving building permits as required by law. These include, but are not limited to,
City utility impact fees and Seminole County impact fees.
If a permit is not renewed prior to the expiration date, the applicant will be required to resubmit
plans and specifications for the appropriate category and pay the appropriate fees. In the event
the code changes editions then the re -submission of the expired application will be based
on the most current code edition.
Penalties:
Any person commencing work without a permit shall be subject to a fee in the amount of
double the permit fee.
Refunds:
For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that have
begun construction shall not be eligible for a refund. The application fee is nonrefundable.
Group I
Residential Interior Alterations
1. Application Fee: $30 (Non-refundable)
2. Permit Fee: 1.4% 1.2% of the documented value of the
construction with a $45 minimum
3. Plan Review Fee .04% of the documented value of the construction
(with a $45 minimum)
-4. Education & Technology Fee: 0.07% of the documented value of the construction
5. State surcharge: 0.03% of the documented valuation or $4 whichever
is greater.
Additional fees: Per occurrence:
Resolution No. 16-1418 — Building Fee Schedule — Page 2 of 8
Fences, Sheds
Pools, Screen Enclosures
Additional plan review/revisions
Reinspections
Re -stamp approved set of plans
Change any or all subs
Pre power
After hour inspections
Reissue of permit to new contractor
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge/DBPR Surcharge
Master file engineering
1. Application Fee:
2. Plan Review Fee
3. Permit Fee:
$15 (plus application fee)
$25 plus application fee)
$S $5/page (with a $25 minimum)
$35 for firstl$50 see reasen for each thereafter
$25 $5.00/page (with a $25.00 minimum)
$25
$75
$50hr/$100 minimum subject to
weekday/weekend time rule)
$25
Renewal of expired permit 30% of original
fee/$75 minimum (same code cam)
$10
As dictated by state statute
$50
Group II
Commercial Interior Alterations
4. Education & Technology Fee:
5. State surcharge:
Additional fees:
Fences, Sheds
Pools, Screen Enclosures
Additional plan review/revisions
Reinspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Reissue of permit to new contractor
Renewal of expired permit
$30.00 (Non-refundable)
.03% of the documented value of the construction
(with a $90.00 minimum)
�,� 1.6% of the documented value of the
construction with a $45.00 $90.00 minimum
0.07% of the documented value of the construction
0.03% of the documented valuation or $4.00
whichever is preater.
Per occurrence:
$plus application fee)
$plus application fee)
$2-5-$5.00/page with a $50.00 minimum
$35 for first/$50 s,,,��easen each thereafter
US $5.00/page (with"a $25.00 minimum)
$25
$75
$50hr/$ 100 minimum subject to
weekday_ /weekend rule)
$25
30% of original fee/$75 minimum
Resolution No. 16-1418 — Building Fee Schedule — Page 3 of 8
Duplicate of permit (lost, stolen, etc) $10
Radon gas surcharge/DBPR Surcharge As dictated by state statute
Master file engineering $50
Group III
New Building Construction - Commercial
1. Application Fee: $30.00
2. Plan Review: 0.45% of the documented value of structural
construction
3. Permit Fee: 1.2% of the documented value of the
structural construction
Plumbing Loos. o
vahiatiene
e
l;le tr-ie 1 Leos. n 501 of the deethmented eleet ie 1 .,.,lu tie
(eaeh unit of multi family housifig is
eansider-ed a separate unit for- fee
Miens),
4 4. Education & Technology Fee: 0.07% of the documented value of the
construction
5. State surcharge: 0.03% of the documented valuation or $4.00
whichever is greater.
Additional fees:
Revisions
Resubmittals
Cursory Plan Review
Re -inspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Per occurrence:
US $35
1 50% costs of
original submittal
$100
US $35 for first/$50 each thereafter
$5/ae
$25
$100
$50 hr/ $100 minimum subject to
Resolution No. 16-1418 — Building Fee Schedule — Page 4 of 8
Reissue of permit to new contractor
Renewal of expired permit
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge/DBPR Surcharge
Temporary CO
Master file engineering
1. Application Fee:
2. Plan Review:
3. Permit Fee:
weekday/weekend rule)
$25
30% of original fee/$75 minimum
$10
As dictated by state statute
$100
$50
New Buildinz Construction - Residential
4. Education & Technology Fee:
$30.00
0.45% of the documented value of structural
construction
1.0% of the documented value of the
structural construction
0.07% of the documented value of the
construction
5. State surcharge: 0.03% of the documented valuation or $4.00
whichever is erg ater.
Digital copies of all as-builts shall be submitted prior to issuance of a certificate of
occupancy.
Additional fees:
Revisions
Resubmittals
Cursory Plan Review
Re -inspections
Re -stamp plans
Change any or all subs
Pre power
After hour inspections
Reissue of permit to new contractor
Renewal of expired permit
Duplicate of permit (lost, stolen, etc)
Radon gas surcharge/DBPR Surcharge
Temporary CO
Master file engineering
Per occurrence:
30% of original fee/$75.00 minimum
$10.00
as dictated by state statute
$100.00
$50.00
25.00
$75.00
$50 hr/ $100 minimum (subject to
weekday/weekend rule)
$25.00
30% of original fee/$75.00 minimum
$10.00
As dictated by state statute
$100.00
$50.00
Resolution No. 16-1418 — Building Fee Schedule — Page 5 of 8
Group IV
Stand -Alone Installations
1. Plumbing Permit Fees: $50.00 plus 1.6% of the documented
plumbing valuation, ($50.00 minimum)
2. Mechanical Permit Fees: $50.00 plus 1.5% of the documented
mechanical valuation, ($50.00 minimum)
3. Electrical Permit Fees: $50.00 plus 1.5% of the documented electrical
valuation, ($50.00 minimum)
4. Roof/Reroof Permit Fees: $50.00 plus 1.2$90/o of the documented
roof valuation, ($50.00 minimum)
5. Fuel Gas Permit Fee: $50.00 plus 1.5% of the documented valuation of
construction
6. State surcharge/DBPR Surcharge: .03% of the documented valuation or $4.00
whichever is greater.
Additional fees: Per occurrence:
Fire Sprinkler/Suppression Permit Fee
Application Fee:
Plumbing Permit Fee:
Education & Technology Fee:
Additional Fees:
State Surcharge/DBPR Surcharge:
Fire Alarm Fee:
Application Fee:
Group V
Fire Fees
$30.00 (non- refundable)
$50.00 plus 1.6% of the documented valuation
(with a $50.00 minimum).
0.07% of the documented valuation of construction.
.03% of the documented valuation or $4.00
whichever is greater.
$30.00 (non-refundable)
Resolution No. 16-1418 — Building Fee Schedule — Page 6 of 8
Electrical Permit Fee:
Education & Technology Fee:
Additional Fees:
State surcharge/DBPR Surcharge:
$50.00 plus 1.5% of the documented valuation
(with a $50.00 minimum).
0.07% of documented valuation of construction.
.03% of the documented valuation or $4.00
whichever is greater.
Section U. Conflicts/Supersede. This Resolution shall supersede any previous rules, policies,
procedures, or resolutions to the extent of any conflict with this Resolution.
Section III. Severability. If any portion of this Resolution is finally determined by a court of
competent jurisdiction to be invalid, unconstitutional, unenforceable, or void, the balance of the
Resolution shall continue in full force and effect.
Section IV: This resolution shall become effective January 16, 2016. However, the
City Manager may delay the implementation of the fee changes set forth in this
Resolution until the City's new permitting software becomes active.
PASSED BY THE CITY COMNiS51ON OF LONGWOOD, FLORIDA, IN
REGULAR SESSION THIS DAY OF 4�--ce�6er2016.
ATTEST:
, i lerk
GWOOD, FLORIDA
Mayor
Resolution No. 16-1418 — Building Fee Schedule — Page 7 of 8
Approved as to form and legality for the use and reliance of the City of Longwood,
Florida only.
Daniel Langley, A ney
Resolution No. 16-1418 — Building Fee Schedule — Page 8 of 8