22-1608 Establishing Fee Schedule for Community Development Department RESOLUTION NO. 22-1608
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
LONGWOOD, FLORIDA, ESTABLISHING A FEE SCHEDULE FOR THE
COMMUNITY DEVELOPMENT DEPARTMENT, RIGHT-OF-WAY
UTILIZATION,AND POLITICAL SIGN FEES;REPEALING RESOLUTION
20-1544; PROVIDING FOR CONFLICTS AND AN EFFECTIVE DATE.
WHEREAS, the City Commission of the City of Longwood has determined that
amendments to the City Fee Schedule are desirable;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF
LONGWOOD, FLORIDA,AS FOLLOWS:
Section 1. That the following schedule of fees be established for Community
Development and Right-of-way Utilization.
The fees to be charged for applications shall be as follows:
(1) Right-of-way utilization: All right-of-way utilization work requiring a city permit shall be
paid to the Public Works Department in accordance with the schedule stated below:
a. Inspection of utilization of right-of-way:
1. Longitudinal installations:
Basic fee 90.00 plus
- Cut less than 1 foot wide (per 100 feet *) 1.75
- Cut 1 foot to 3 feet wide (per 100 feet *) 4.25
- Cut greater than 3 feet wide (per 100 feet *) 8.00
Directional bore (per 100 feet*) 1.75
*or fraction thereof
2. Transverse installation
Basic fee 90.00 plus
Open cut—paved areas (each cut):
- Cut greater than 15 square feet 270.00
- Cut 15 square feet or less 50.00
b. Open cut unpaved areas(each cut) 108.00
c. Bore and jack(each operation) 100.00
Resolution No.22-1608 Fee Schedule
Page 1 of 5
d. Directional bore (each operation) 100.00
e. New overhead utilities, for nonfranchised companies:
f. Basic fee for installation of poles (other than repair or maintenance) 75.00 plus
- Poles up to 50 feet in height, per pole 1.50
- Poles over 50 feet in height, per pole 2.00
(for Telecommunication towers see that listing)
g. Upgrade work on previously permitted overhead utilities,for nonfranchised
companies:
h. Basic fee for work on previously permitted overhead utility poles (including the
addition of intermediate poles in an existing overhead line) 28.00 plus
i. Charge per existing additional pole (per pole) 1.00
j. Miscellaneous related charges:
1. Reinspection 41.00
2. Direct service Drop No charge
k. Maintenance on Existing Utilities No permit required
I. Right-of-Way Cut 20.00
m. Residential Driveway Construction 25.00
n. Commercial Driveway Construction 300.00
o. Other Commercial Construction 200.00
p. Maintenance of Traffic (MOT) Permit 200.00
q. Irrigation permit 10.00*
*per inch of pipe diameter or fraction thereof
(2) The fee for Development applications, to be paid to the Community Development Services
Department shall be as follows:
• Annexation
o Single Family 200.00
o All others 350.00
• Administrative Decision Appeal 400.00
• Conditional Use Permit
o Major Conditional Use 2000.00
o Minor Conditional Use 1500.00
• Comprehensive Plan
o Small Scale Comprehensive Plan Amendment 1000.00
o Large Scale Comprehensive Plan Amendment 1750.00
Resolution No.22-1608 Fee Schedule
Page 2 of 5
o Comprehensive Plan Text Amendment 800.00
o Comprehensive Plan Determination Letter 25.00
o Comprehensive Plan Paper Copy 35.00
• Development Agreement (In addition to site plan fees) 500.00
• Historic District (HD) in addition to other fees:
o Demolition Permit (in addition to building permit fees) 250.00
• Longwood Development Code
o Zoning Map Amendment 1200.00
o Longwood Development Code Copies:
Paper copy 50.00
• Information Requests
o Development Analysis letter per site (without Pre-App) 50.00
o Map/plan reproduction:
• Color map Actual cost plus 10%
• Blueline/blackline prints 10.00
o Research Fee actual cost
o Written Request for Information 25.00
o Zoning/Future Land Use letter 25.00
• Liquor License (Application and Inspection) 35.00
• Massage Therapy Application 35.00
• Outdoor Seating Application 50.00
• Paint Color Application and Inspection (when not part of site plan) 25.00
• Planned Development Approval 3000.00
o Amendment to Planned Development 1200.00
• Pre-Application Meeting 150.00
(Fee credited against Site plan application fee)
• Resurfacing/Restriping Parking Lot Permit 35.00
Resolution No.22-1608 Fee Schedule
Page 3 of 5
• Special exceptions, administrative waivers, and variances:
o Variance 200.00 Residential
500.00 Nonresidential
o Administrative waiver/modification 100.00
o Administrative waiver/modification_appeal 200.00
o Special exception (single-family residential) 125.00
o Special exception (multi-family residential and non-residential) 500.00
o Special exception package (multiple non-residential exceptions) 1200.00
• Site Plan Review
o Site plan review (major) 2500.00
plus$20 per
du and $20
per 1000SF
o Site plan review(minor) 1000.00
plus $20 per
du and $50
per 1000SF
o Site plan revision (after approval) %the Review
Fee
• Subdivision review:
o Lot Split 100.00
o Preliminary plat 750.00
o Final plat 1000.00
o Recording Actual
• Temporary Sign Permit 50.00
o Waiver Request To City Commission 50.00
• Temporary use permits(TUPs):
o 30-day temporary use permit 200.00
o 24-hour Temporary Use Permit 50.00
o Nonprofit(religious, charitable,youth, civic) 20.00
o Temporary Use Permit Waiver Application 50.00
o Monthly/recurring TUP or renewal 300.00
• Tree Removal Permits
o Fee in lieu of Replacement 115.00 per inch DBH
Resolution No.22-1608 Fee Schedule
Page 4 of 5
• Vacation/abandonment 250.00
Section 2. Recitals. The above recitals are true and correct and are incorporated herein
by this reference.
Section 3. Repeal. Resolution 20-1544 shall be repealed.
Section 4. Effective Date. This Resolution shall take effect immediately upon adoption.
PASSED and ADOPTED this 15th day of August 2022.
CITY OF LONGWOOD, FLORIDA
Matt organ, Mayor
ATTEST:
//,/„.7
Mic le ongo, C, FCRM, City Clerk
APPR TO FORM AND LEGAL SUFFICIENCY:
a—
Daniel W. La , Ci tt ey
Resolution No.22-1608 Fee Schedule
Page 5 of 5