Loading...
24-1671 Amending the Building Division Fee Schedule RESOLUTION NO. 24-1671 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF LONGWOOD, FLORIDA, ESTABLISHING REVISED BUILDING PERMIT AND BUILDING PERMIT-RELATED FEES; PROVIDING AN EFFECTIVE DATE. WHEREAS, Section 553.80 Florida Statutes Enforcement authorizes the governing body of a municipality to provide a schedule of fees for the enforcement of the provisions of the Florida Building Code; and WHEREAS, Article II of Chapter 18 of the Code of Ordinances, City of Longwood, Florida provides for the establishment of building and related permit fees by resolution of the City Commission; and WHEREAS,the City Commission previously adopted Resolution No. 21-1550 to establish a schedule of fees for building and related permit fees, and this Resolution is intended to replace said resolution. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LONGWOOD, SEMINOLE COUNTY, FLORIDA: Section I: That the following schedule of fees be established for Building Permits and related services. SCHEDULE OF FEES FOR CITY OF LONGWOOD BUILDING DIVISION Method for Determining Value of Buildings. Construction Cost/Valuation will be calculated using the most current published edition of the "Building Valuation Data" chart as published by the International Code Council, or the contracted price. In those instances, in which valuation is based on the contractor's estimate,the contractor shall provide such verification as the Building Official may require, such as the written contract between contractor and owner. If the contractor fails to provide such verification, the Building Official may, at his or her sole discretion, determine the valuation based on the value of construction of proposed work. The plans review fee and/or application fee, as applicable, must be paid at time of permit package submittal. All permits are subject to a State Certification Surcharge State Certification Surcharge of 0.01% Resolution No.24-1671—Building Fee Schedule Page 1 of 11 and a State DBPR Surcharge of 0.015%or a minimum of$4.00 per permit. Plans: A minimum of two sets of drawings shall be submitted with all applications. Digital copies of all as-builts shall be submitted prior to issuance of a certificate of occupancy for non-residential and multi-family projects. Other fees and charges: The applicant is responsible for other related fees and charges not enumerated in this Chapter prior to receiving building permits as required by law. These include, but are not limited to, City and Seminole County impact fees and any additional engineering or architectural service fees charged for additional services rendered, including those that fall under the City's cost recovery policy. If a permit is not renewed prior to the expiration date,the applicant will be required to resubmit plans and specifications for the appropriate category and pay the appropriate fees. In the event the code changes editions then the re-submission of the expired application will be based on the most current adopted code edition. Penalties: Any person commencing work without a permit shall be subject to a fee in the amount of double the permit fee. Refunds: For projects that are cancelled after fees are paid, a 75% refund shall apply. Projects that have begun construction shall not be eligible for a refund. The application fee is nonrefundable. Resolution No.24-1671—Building Fee Schedule Page 2 of 11 Group I Residential Alterations 1. Application Fee: $30.00 (Non-Refundable) 2. Plan Review: .15%of the documented valuation of construction (with a $45.00 minimum) 3. Permit Fee: .25%of the documented valuation of construction (with a $45.00 minimum) 4. Education &Technology Fee: 0.07% of the documented valuation of construction 5. State surcharge: 0.01% of the documented valuation of construction or$2.00, whichever is greater. 6. DBPR surcharge: 0.015%of the documented valuation of construction or$2.00, (whichever is greater) Additional fees: Fences, Sheds $15.00 (plus application fee) Screen Enclosures $25.00 (plus application fee) Additional plan review/revisions $5.00/page (with a $25.00 minimum) Re-inspections $50.00 for first/$75.00 for the second, $100 for each thereafter Re-stamp plans $5.00/page (with a $25.00 minimum) Change any or all subs $25.00 Reissue of permit to new contractor $25.00 Renewal of expired permit 30%of original fee/$75.00 minimum (same code cycle) Duplicate of permit (lost, stolen, etc.) $10.00 Resolution No.24-1671—Building Fee Schedule Page 3 of 11 Group II Commercial Alterations 1. Application Fee: $30.00(Non-Refundable) 2. Plan Review: .03%of the documented valuation of the construction (with a $30.00 minimum) 3. Permit Fee: 1.0%of the documented valuation of construction with a $30.00 minimum 4. Education &Technology Fee: 0.07%of the documented valuation of construction 5. State surcharge: 0.01%of the documented valuation of construction or$2.00, whichever is greater. 6. DBPR surcharge: 0.015%of the documented valuation of construction or$2.00(whichever is greater) Additional fees: Additional plan review/revisions $5.00/page with a $50.00 minimum Re-inspections $50.00 for first/$75.00 for the second, $100 for each thereafter Re-stamp plans $5.00/page (with a $25.00 minimum) Change any or all subs $25.00 Reissue of permit to new contractor $25.00 Renewal of expired permit 30%of original fee/$75.00 minimum Duplicate of permit(lost, stolen, etc.) $10.00 Resolution No.24-1671—Building Fee Schedule Page 4 of 11 Group III New Building Construction -Commercial 1. Application Fee: $30.00(Non-Refundable) 2. Plan Review: 0.45%of the documented valuation of construction 3. Permit Fee: 1.0%of the documented valuation of construction 4. Education &Technology Fee: 0.07%of the documented valuation of construction 5. State surcharge: 0.01%of the documented valuation of construction or$2.00 (whichever is greater) 6. DBPR surcharge: 0.015%of the documented valuation of construction or$2.00 (whichever is greater) Additional fees: Revisions $35.00 Resubmittals 50%costs of original submittal Cursory Plan Review $7.00 per$1,000.00 of Declared Construction Value Re-inspections $50.00 for first, $75.00 for the second, $100 for each thereafter Re-stamp plans $5.00/page (with a $25.00 minimum) Change any or all subs $25.00 Reissue of permit to new contractor $25.00 Renewal of expired permit 30%of original fee/$75.00 minimum Duplicate of permit (lost, stolen, etc.) $10.00 Resolution No.24-1671—Building Fee Schedule Page 5 of 11 Group III New Building Construction-Residential 1. Application Fee: $30.00 (Non-Refundable) 2. Plan Review: 0.30% of the documented valuation of construction 3. Permit Fee: 0.50%of the documented valuation of construction 4. Education &Technology Fee: 0.07%of the documented valuation of construction 5. State surcharge: 0.01%of the documented valuation of construction or$2.00 (whichever is greater) 6. DBPR surcharge: 0.015%of the documented valuation of construction or$2.00 (whichever is greater) Additional fees: Revisions $35.00 Resubmittals $10.00 Re-inspections $50.00 for first, $75.00 for the second, $100 for each thereafter Re-stamp plans $50.00 Change any or all subs $25.00 Reissue of permit to new contractor $25.00 Renewal of expired permit 30%of original fee/$75.00 minimum Duplicate of permit (lost, stolen, etc.) $10.00 Master File Engineering $100.00 Resolution No.24-1671—Building Fee Schedule Page 6 of 11 Group IV Stand-Alone Installations 1. Plumbing Permit Fees: $50.00 plus 1.0%of the documented plumbing valuation, ($50.00 minimum) 2. Mechanical Permit Fees: $50.00 plus 1.0% of the documented mechanical valuation, ($50.00 minimum) 3. Electrical Permit Fees: $50.00 plus 1.0%of the documented electrical valuation, ($50.00 minimum) 4. Roof/Reroof Permit Fees: $50.00 plus 0.80% of the documented roof valuation, ($50.00 minimum) 5. Fuel Gas Permit Fee: $50.00 plus 1.0%of the documented valuation of construction 6. Pool Permit: $50.00 plus .80%of the documented valuation of construction 7. State surcharge: 0.01% of the documented valuation or$2.00 (whichever is greater) 8. DBPR Surcharge: 0.015% of the documented valuation of construction or$2.00 (whichever is greater) Resolution No.24-1671—Building Fee Schedule Page 7 of 11 Group V Fire Fees Fire Sprinkler/Suppression Permit Fee Application Fee: $30.00 (non- refundable) Plumbing Permit Fee: $50.00 plus 1.6%of the documented valuation (with a $50.00 minimum). Education &Technology Fee: 0.07%of the documented valuation of construction. Additional Fees: State Surcharge: 0.01%of the documented valuation or $2.00 whichever is greater. DBPR Surcharge: 0.015%of the documented valuation of construction or$2.00 (whichever is greater) Fire Alarm Fee: Application Fee: $30.00 (non-refundable) Electrical Permit Fee: $50.00 plus 1.5%of the documented valuation (with a $50.00 minimum) Education &Technology Fee: 0.07%of documented valuation of construction Additional Fees: State surcharge: 0.01% of the documented valuation or $2.00 whichever is greater. DBPR Surcharge 0.015%of the documented valuation of construction or$2.00 (whichever is greater) Resolution No.24-1671—Building Fee Schedule Page 8 of 11 Additional Fees Fireworks Show Permit $100 plus $30 non-refundable application fee Grading Permit $500 plus$30 non-refundable application fee Milestone Inspection Report (Phase 1) $250 Milestone Inspection Report (Phase 2) $250 Stop Work Order For work commencing prior to the issuance of an Double the applicable permit fee approved permit(Longwood City Code Sec. 18-154) Stop Work Order For permitted work that violates Section 115.1 of the $100 Florida Building Code,Administrative Section Streamlined Low-Voltage Permit (F.S. 553.793) $40 per label Temporary Certificates of Occupancy Temporary Certificates of Occupancy (TCO) are authorized at the sole discretion of the Building Official. Where TCOs are issued for commercial properties,the following fee schedule applies: 15t TCO: Time Frame: Up to 45 Days Fee:$500.00 2nd TCO/Last: Time Frame: Up to 45 Days Fee:$1,500.00 After Hours Inspections After Hours Inspection are authorized at the sole discretion of the Building Official. Any request must be submitted in writing 96 hours prior to date of request. After Hours Inspections will limited to true emergencies and electrical service shutdowns associated with commercial facilities.The fee must be paid prior to final scheduling of the After Hours Inspection. After Hours Inspection Fee:$100 an hour Weekdays: Minimum charge of 2 hours Weekends: Minimum charge of 4 hours Change of Use/Occupancy/Annual Inspections Fees: Each Change of Use/Occupancy must be inspected, and authorized by the Building Official, pursuant to section 1001 of the Florida Existing Building Code, and section 18-8,of the Longwood City Code, prior to approval of Business Tax Receipt, and release of Certificate of Occupancy. A single inspection fee of $100.00 will be charged. Fee must be paid at time of application submittal. Each new business tax receipt application is required to have a fire marshal inspection pursuant to section 42-63 of Longwood City Code and to receive a passing result prior to release and approval of the applicable business tax receipt. There is no charge for the initial fire marshal inspection, but if after a Resolution No.24-1671—Building Fee Schedule Page 9 of 11 second re-inspection, items previously called out are not corrected or compliant, a$35.00 re-inspection fee will be due prior to any further fire marshal inspections. Each existing commercial business is required to be inspected annually, bi-annually or tri-annually pursuant to the Florida Fire Prevention Code, and section 42-63 of the Longwood City Code.There is no charge for the initial, required fire marshal inspection, but if after a second re-inspection, items previously called out are not corrected or compliant, a$35.00 re-inspection fee will be assessed and due immediately. Resolution No.24-1671—Building Fee Schedule Page 10 of 11 Section II: Conflicts. Any resolutions or policies in conflict herewith are hereby repealed. Section III: This resolution shall become effective October 8, 2024. PASSED AND ADOPTED THIS 7th DAY OF OCTOBER 2024. CITY COMMISSION CITY OF LONGWOOD, F RIDA itldk (IX MATTHEW MCMILLAN, MAYOR ATTEST: / ICHELLE L , C, FCRM, CITY CLERK Approved as to form and legality for the use and reliance of the City of Longwood, Florida, only. e------7::..2 -' DANIEL W. L1 TY TTORNEY Resolution No.24-1671—Building Fee Schedule Page 11 of 11