26-1722 Authorizing to Apply for a Loan to Fund the Water Treatment Plant ProjectRESOLUTION NO. 26-1722 A RESOLUTION OF CITY OF LONGWOOD, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPLY FOR A LOAN UNDER THE STATE REVOLVING FUND LOAN PROGRAM TO PARTIAL FUND THE WATER TREATMENT PLANT PROJECT AND THE COST OF DEBT ISSUANCE AND IF SUCH LOAN APPLICATION IS APPROVED, REQUIRING CITY COMMISSION APPROVAL BY ORDINANCE PRIOR TO EXECUTION AND DELIVERY OF THE LOAN AGREEMENT, NOTE AND RELATED CLOSING DOCUMENTS; SUCH LOAN WOULD PLEDGE UTILITY SYSTEM REVENUES AND SHALL NOT PLEDGE AD VALOREM TAXES OR BE A GENERAL OBLIGATION DEBT; ADOPTING A DRINKING WATER FACILITIES PLAN; PROVIDING FOR CONFLICTS, SEVERABILITY, AND AN EFFECTIVE DATE. WHEREAS, Florida Statutes provide for loans to local government agencies to finance the construction of wastewater treatment facilities; and WHEREAS, Florida Administrative Code rules require authorization to apply for loans, to establish pledged revenues, to designate an authorized representative; to provide assurances of compliance with loan program requirements; and WHEREAS; the City of Longwood, Florida, desires for its City Manager to apply and seek approval for a loan agreement from the State of Florida Department of Environmental Protection under the State Revolving Fund Program for financing design, permitting and construction of Water Treatment Plant Project (the "WTP Project"); and WHEREAS, if the loan application is approved, final approval of the loan agreement, note and relating closing documents must come back to the City Commission for final approval via ordinance approved by at least four of the five City Commissioners. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LONGWOOD, FLORIDA, AS FOLLOWS: SECTION I. Recitals. The foregoing findings are incorporated herein by reference and made a part hereof. SECTION II. Loan Application Authorization. The City Commission of City of Longwood, Florida, hereby authorizes its City Manager to apply for and seek approval from the State of Florida Department of Environmental Protection under the State Revolving Fund Program to finance the design, permitting and construction of the WTP Project and for the cost of issuance of such debt. The City Manager is hereby designated as the authorized representative for the City of Longwood to provide the assurances and commitments required by the loan application, subject to final approval of the loan by the City Commission as set forth in this Resolution. Further, the City Manager is hereby given the authority to move forward with the preparation of the preliminary planning documents and other documents needed to secure a loan under Resolution No. 26-1722 Page 1 of 3 the State Revolving Fund Program to fund the WTP Project and to cover the cost of issuance of such debt. This Resolution does not authorize the approval of any loan agreement, note or any other closing document in the event the loan application is approved. Thus, if the loan application is approved, the loan must come back to the City Commission for final approval via ordinance before a loan agreement, note and relating closing documents can be approved, executed and delivered. SECTION III. Revenues Pledged/Not General Obligation. The revenues pledged for the repayment of the intended loan under the State Revolving Fund are the City's net water and sewer system revenues after payment of debt service. The loan agreement and note shall not be a general obligation debt of the City of Longwood. The loan agreement and note, when delivered by the City of Longwood pursuant to the terms of the loan agreement and authorizing ordinance, shall not be or constitute an indebtedness of the City of Longwood within the meaning of any constitutional or statutory limitation of indebtedness, but shall be payable solely from the pledged revenues as to be provided in the loan agreement and authorizing ordinance. The loan agreement and note shall not pledge ad valorem tax revenues or permit or constitute a mortgage or lien upon any assets owned by the City of Longwood, including, but not limited to, the WTP Project and the City's water and sewer system. The noteholder shall never have the right to compel the exercise of the ad valorem taxing power of the City or the State, or taxation in any form of any property to pay the note or the interest thereon. SECTION IV. Drinking Water Facilities Plan Adoption. The City hereby adopts the DRINKING WATER FACILITIES PLAN - City of Longwood WTP Improvements dated June 2026 prepared by CPH Consulting, LLC attached hereto. SECTION V. Authority. The legal authority for the City borrowing money to construct the WTP Project is pursuant to its home rule authority under Article VII, Section 2 of the Constitution of the State of Florida and Chapter 166, Part II, Florida Statutes and Chapter 180, Florida Statutes and pursuant to the City of Longwood Charter. However, this Resolution does not authorize the borrowing of money, just authorizing the filing of an application seeking loan approval. SECTION VI. Conflicts. All resolutions or part of resolutions in conflict with any of the provisions of this Resolution are hereby repealed. SECTION VII. Severability. If any section or portion of a section of this Resolution proves to be invalid, unlawful, or unconstitutional, it shall not be held to invalidate or impair the validity, force, or effect of any other section or part of this Resolution. SECTION Vill. Effective Date. This Resolution shall become effective immediately upon its passage and adoption. Resolution No. 26-1722 Page 2 of 3 PASSED and ADOPTED this _��� Day of ;S r-C , 2026. CITY OF LONGWOOD, FLORIDA Z/' a '.w Tony Boni, Mayor OMA ) Liane Cartagena, City Clerk Approved as to form and legality for the use and reliance of the City of Longwood, Florida only. Daniel W. Langle ty idtorney Resolution No. 26-1722 Page 3 of 3 DRINKING WATER FACILITIES PLAN City of Longwood WTP Improvements June 2026 CUP No. 8274-7 DWSRF No. DWXXXXX FDEP PWS No. 3590202-1 CPH Project No. 2500699 Certificate of Author i Prepared by: Engineer -of -Record: Project Manager: Project Engineer: Engineers Planners Landscape Architects Surveyors Construction Management DesignlBuild nation No. 0 00 032 15 CPH Consulting, LLC. Roberto Gonzalez, P.E. Amr Zaky, Ph.D Aidan Karn, E.I. CPH Consulting, LLC. 1117 E. Robinson Street Orlando FL 32801 (407)425-0452 of FINAL Drinking Water Facilities Plan TABLE OF CONTENTS LISTOF FIGURES..................................................................................................................... ii LISTOF TABLES........................................................................................................................ ii 1. Executive Summary........................................................................................................ 1 1.1 Project Description..................................................................................................... 1 1.2 Planning and Service Areas........................................................................................ 2 1.3 Need for the Project.................................................................................................... 5 1.4 Existing Facilities........................................................................................................ 6 1.5 Population and Water Demand Projections...............................................................10 1.6 Major Project Engineering Services...........................................................................12 1.7 Climate, Topography, and Flood Plain.......................................................................14 2. Alternatives Analysis and Evaluation.............................................................................16 2.1 Objectives and Evaluation Criteria.............................................................................16 2.1.1 Operations and Maintenance Program................................................................p17 2.1.2 Managerial and Technical Capacity.......................................................................17 2.2 Capital Cost Analysis.................................................................................................18 2.2.1 Alternative No. 1 Evaluation and Lifecycle Cost.....................................................19 2.2.2 Alternative No. 2 Evaluation and Life Cycle Cost...................................................21 2.2.3 Alternative No. 3 Evaluation and Life Cycle Cost...................................................24 3. Environmental Effects....................................................................................................26 3.1 Flora, Fauna, Threatened or Endangered Plant or Animal Species ...........................26 3.2 Surface Water Bodies or Wetlands............................................................................26 4. Public Participation........................................................................................................27 5. Financial Feasibility.......................................................................................................27 5.1 Business Plan............................................................................................................27 5.2 Water Rate and Charges...........................................................................................27 6. Project Implementation..................................................................................................28 7. Adoption Resolution......................................................................................................29 8. Updated Request For Inclusion.....................................................................................29 APPENDIX A: USDA Soils Map..............................................................................................A-1 APPENDIX B: Alternative No. 2 Conceptual Figures............................................................... B-1 APPENDIX C: Life Cycle Cost Breakdown..............................................................................C-1 APPENDIX D: Preliminary Ecological Assessment................................................................. D-1 APPENDIX E: Public Participation.......................................................................................... E-1 APPENDIX F: Adoption Resolution......................................................................................... F-1 APPENDIX G: Updated Request for Inclusion.........................................................................G-1 City of Longwood Drinking Water Facilities Plan FINAL Cph I of Longwood FINAL Drinking Water Facilities Plan AppendixH: Busniess Plan..................................................................................................... H-1 AppendixI: City Ordinance...................................................................................................... 1-1 LIST OF FIGURES FIGURE1-1: Location Map...................................................................................................... 3 FIGURE 1-2: Service Area Map............................................................................................... 4 FIGURE 1-3: FEMA Flood Zone Map......................................................................................15 LIST OF TABLES Table 1-1: Alternative No. 2 Cost Summary............................................................................... 2 Table 1-2: City of Longwood WTP Capacity Overview............................................................... 7 Table 1-3: Historic Water Use — City of Longwood....................................................................11 Table 1-4: Projected Population and Water Use(a) — City of Longwood......................................11 Table 2-1: City of Longwood DW SRF Alternatives Description................................................16 Table 2-2: City of Longwood DWSRF Lifecycle Cost Analysis..................................................18 Table 2-3: Alternative No. 1 20-Year Life Cycle Cost................................................................20 Table 2-4: Alternative No. 2 20-Year Life Cycle Cost................................................................23 Table 2-5: Alternative No. 3 20-Year Life Cycle Cost................................................................25 Table 8-1: Updated Schedule....................................................................................................29 City of Longwood Drinking Water Facilities Plan FINAL cph I I of FINAL Drinking Water Facilities Plan 1. Executive Summary 1.1 Project Description The City of Longwood (City) is located in Southwest Seminole County, South of Lake Mary, and Northwest of Casselberry. Under Potable Water System (PWS) No. 3590202-1, the City currently owns and operates two (2) Water Treatment Plants (WTPs) located at 108 Myrtle Street and 870 West Church Ave, serving the entire City of Longwood service area. The PWS is currently rated for a maximum day design capacity of 7.056 million gallons per day (MGD) and is permitted by the St. Johns River Water Management District (SJRWMD) under Consumptive Water Use Permit (CUP) No. 8274-7 at an allocation of 2.682 mgd annual average day demand (AADD). The following alternatives were evaluated as potential options to improve the PWS: 1. Decommission WTP No.1, Decommission WTP No. 2, Construct WTP No. 3 — 7.88 MGD 2. Rehabilitate WTP No. 2 — 4.6 MGD, Construct WTP No. 3 — 3.28 MGD. 3. Rehabilitate WTP No. 1 — 2.44 mgd, Rehabilitate WTP No. 2 — 4.60 MGD, Construct WTP No. 3 — 0.84 MGD Alternative No. 2 is the selected alternative and consists of two (2) projects. Project No. 1 proposes rehabilitation of WTP No. 2, and Project No. 2 proposes construction of WTP No. 3 which will be located on a new site owned by the City located at Parcel No. 33-20-30-502-3800- 0040 and Parcel No. 33-20-30-502-3800-004. The objective is to provide the City of Longwood PWS with two (2) robust WTPs equipped to deliver adequate service to the City's 20-year projected population. Additionally, the new WTP will be equipped with Advanced Water Treatment (AWT) capabilities to treat and distribute water from the Lower Floridan Aquifer (LFA) in an effort to conform to Central Florida Water Initiative (CFWI) prerogatives to reduce withdrawals from the Upper Floridan Aquifer (UFA). The total estimated construction cost of the selected Alternative No. 2 is $70,130,000 as presented in Appendix G. Table 1-1 presents the total cost for each of the two (2) proposed protects encompassed within the selected alternative. Please refer to Appendix C for a detailed breakdown of the protect costs. The City has entered into an agreement with the Florida Department of Environmental Protection (FDEP) for a State Revolving Fund (SRF) loan (DWXXXXX) for design and construction with an interest rate of 2.736%. City of Longwood Drinking Water Facilities Plan FINAL cph City of Longwood FINAL Drinking Water Facilities Plan Description Cost Project No. 1 — Rehabilitate WTP No. 2 — 4.60 MGD I $13,200,000 Project No. 2 — Construct WTP No. 3 — 3.28 MGD I $37,000,000 Total $50,200,000 SRF Contingency (10%) 1 $5,020,000 Total Construction Cost � $55,220,000 SRF Administration (2%) 1 $1,105,000 Engineering Fees (15%) 1 $8,283,000 CA and C E I Services (10%) 1 $5,522,000 1.2 Planning and Service Areas Figure 1-1 (Location Map) presents the Longwood city limits and project sites. Project No. 1 and Project No. 2 will utilize the parcels encompassing the existing WTPs which are owned by the City. Project No.3 will utilize an additional parcel for the new WTP which is also owned by the City. Additionally, the proposed improvements will not alter existing service area boundaries. Figure 1-2 (Service Area Map) presents the City's service area and city limits. City of Longwood Drinking Water Facilities Plan FINAL cph 2 Hinesvillb Fitzgerald Albany Andalusia Enrerprirz Waycross Brunswick Valdosta T:IlI:Eh-' Lynn Haven Jack so lvilIe Panama r Inset Map of City Limits 1 � c �.r �y16 R cac01% Q City of Longwood WTP No- 2 1 E EfW r lir zsm svn City of Longwood WTP No. 1 or, TaI jam ,-; Proposed ® WTP No. ! th Q vtral Pkwy En Cayyelhcl I r v1hal Pkwy Altamonte Springs cn� Dr H•.�1ri� 1 � � ti,pirri 1 H111 L Tampa rp,t rstaurg '14 '1 i.1 I P lrn Coast ytana Beach P Orange Del ton a Tint Eando s av F rt rl n- 'JJ stf��l1 earl Imrn ales Coral Spnnns N.tples Pembroke r✓T1 iartli Proposed WTP No. 3 City of Longwood WTP No. 1 City of Longwood WTP No. 2 Florida Counties Havana ® 14Iran Longwood City Limits (2025) Scale: 1 inch =41 mile N CITY OF LONGWOO❑ LOCATION MAP Date: 2/1212026 FIGURE Photo Date- NIA CITY OF LONGW00❑ � _1 Project No- 2500699 SEMINOLE COUNTY, FLORIDA GIS: LEC A, F, as mg on Ave Laity Mornit'g CI% n � GrQejr Wo D � �e �' -0 Stone Gy �A cc o Long Pond Rd 0 Sand Pond Rd E ir a'Sta t7 ak f3T �' aQ�, -?� 2 us E L ang p0 � a* `n Q Park gy 0 v 0 .{ m a <Otp a I r� Green w ay Btiv d o Refler_tnn= J _Iv V) �° Parr. o Pine Emma Oaks TO � D o 1 � x ,,gee Dr v t3g =rG General Hutchinson PF c r Pat K w Ibis Rd EE Williamson Rd S� n .,� "'a VQ, 3C Qr R6xbor, Rd u' r a`��aSr � . 11 E -4 Robson St Arden Stiz rr� � North 5t a a G E 0 e1 (n _ E N Cr1 ` ~ ID S 1 Diane m a d Alpine St n E Hilfcrest St m C] w St v E Highland St E Citrus St Q Rd _ N Secret O Orange St E Y t, L,l�- E mbal Palm Ci- J i a z 2� -1r►plet COka, _ a x Casselherry *3� � n 0 t Tnpla t Wy '' "r+plet Lake Or takes ..... = n -19 Merritt S t Q p Cranes At3an� niw Rco43 z Park Altamonte A. - an I e Dr !-: Springs 'n �arrare It n ❑ *�. .4,� v+ i ro M Sherwood�r �,k Q$�y b, u y 03* Haven Or x a 5 ® Longwood City Limits (2025) a z x Ellsworth St Pennsylvania Ave. 0 City Longwood Utilities Service Area 2024) of (S]RWMD, Scale: 1 inch = 2.500 feet N A, CITY OF LONGWOO❑ SERVICE AREA MAP FIGURE �2 - Date: 8/7/2025 Photo Date: NAProject CITY OF LONGWODa No. 2500699 SEMINOLE COUNTY. FLORIDA GIS: LEC of FINAL Drinking Water Facilities Plan 1.3 Need for the Project The City of Longwood currently operates WTP No. 1 and WTP No. 2 to support potable water demand within the City's service area. The existing WTPs possess aging infrastructure with components approaching the end of their useful life. The aging structures exhibit sustained damage, developed structural cracks, and corrosion. Therefore, several components require refurbishment and/or replacement in the near future. Additionally, the City of Longwood is within CFWI jurisdiction. The CFWI requires municipalities within their jurisdiction to work towards reducing UFA withdrawals below a maximum rate of 115 gallons per day per capita (gpdc) by 2040. Over the previous five (5) years, the City observed an average UFA water usage of 128 gpdc. In an effort to conform CFWI prerogatives, proposed improvements include construction of a new WTP (WTP No. 3) with AWT capabilities to treat and distribute water from the LFA. As a result, UFA withdrawals will be reduced and capacity of the PWS will be expanded to serve the City's twenty (20) year projected demands. Per US Census data and CFWI population projections, the City's population is projected to increase by 12.65% over the next twenty (20) years. As a result, the annual ADD is projected to increase to 2.46 MGD and the Max Day Demand (MDD) is projected to increase to 4.66 MGD by the year 2046. The projected increase in demand results in storage capacity exceeding 75% of max day design between 2030 and 2031. Therefore, the proposed improvements intend to raise the max day design capacity of the PWS from 7.056 MGD to 7.88 MGD in an effort to provide redundancy, maintain adequate capacity to serve the population, and maintain the ability to meet fire flow storage. City of Longwood Drinking Water Facilities Plan FINAL Cph 5 City of Longwood FINAL Drinking Water Facilities Plan 1.4 Existing Facilities The PWS is currently permitted to distribute a 2.682 MGD AADD throughout the City's service area, matching the total CUP allocation. The City of Longwood WTP No. 1 is comprised of the following components: • Two (2) Wells — varying flow rates, 30 HP motors. • One (1) 1,800 gpm cascading tray aerator. • One (1) Sodium Hypochlorite injection point. • One (1) Hydrofluosilicic Acid injection point (off-line). • One (1) 500,000 gallon ground storage tank. • One (1) 200,000 elevated storage tank (out of service). • Three (3) High Service Pumps (HSPs) — varying flow rates and motor sizes. • Yard Piping, Valves, and Flow Meters. • 350 kW Diesel Generator with fuel storage. • Electrical and Instrumentation System. The City of Longwood WTP No. 2 is comprised of the following components: • Three (3) Wells — varying flow rates and motor sizes. • One (1) 3200 gpm cascading tray aerator. • One (1) Sodium Hypochlorite injection point. • One (1) Hydrofluosilicic Acid injection point (off-line). • One (1) 300,000 gallon ground storage tank. • One (1) 750,000 gallon ground storage tank. • Five (5) HSPs — varying flow rates and motor sizes. Yard Piping, Valves, and Flow Meters. • 260 kW Diesel Generator with fuel storage. • Electrical and Instrumentation System. Table 1-2 presents an inventory of the capacities for the operational components at the WTP. City of Longwood Drinking Water Facilities Plan FINAL cph 0 of FINAL Drinking Water Facilities Plan PARAMETER Units SWFWMD Withdrawal Allocation (CUP No. 8274-7) CUP Limit MGD 2.682 Expires 2029 FDEP Rated Capacity (PWS No. 6530320) COMMENT WTP No. 1 Max -Day Design Capacity MGD 2.448 Per 2021 Sanitary Survey WTP No. 2 Max -Day Design Capacity MGD 1 4.608 Per 2021 Sanitary Survey WTP No. 1 Total gpm 1,700 WTP No. 2 Well 1 ........ ........ ........ ........ ........ ........ gpm ........ 1,500 60 HP ................................................................................................................................................................................. Well 2 ....................................................................................................................................................................................................................___ gpm 1,700 ........... 75 HP ................. Well 3 gpm 1,700 75 HP WTP No. 2 Total gpm 4,900 gpm 6,600 Requirement: MDD + FF PWS Total ....................... ................................................................................................................................................... MGD 9.5 ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ gpm 4,000 Requirement: MDD or ADD Firm (Largest Well Off -Line) ....._ _................................................... MGD 5.76 inq Treatment Capacity WTP No. 1 Cascading Tray Aerator gpm 1,800 WTP No. 1 Total gpm 1,800 WTP No. 2 Cascading Tray Aerator gpm 3,200 WTP No. 2 Total gpm 3,200 gpm 5,000 Requirement: MDD + FF PWS Total Aeration Capacity ........ ........ .... ....... ......... ........ ........ MGD 7.2 Disinfection Capacity — Chlorination WTP No. 1 Chlorine Injection Points EA 1 Top of GST City of Longwood Drinking Water Facilities Plan FINAL 7 of FINAL Drinking Water Facilities Plan Table Chemical Feed Capacity Chlorine Feed Rate WTP No. 2 Chlorine Injection Points .... ....................................... Chemical Feed Capacity Chlorine Feed Rate Disinfection Capacity — Fluoridation WTP No. 1 Fluoride Injection Points Quantity of Fluoride Feed Pumps Residual Range WTP No. 2 Fluoride Injection Points Quantity of Fluoride Feed Pumps Residual Range Storage Capacity ] WTP No. 1 gpd 1.5 ....... gpm ........................... 1.6 70 EA 1 ............................................................................... gpd 1.5 gpm 1.9 EA EA ppm EA EA ppm G1 I MG E2 MG WTP No. 1 Total MG WTP No. 2 G3 MG G4 MG WTP No. 2 Total MG PWS Total Storage Capacity MG High Service Pumping Capacity' WTP No. 1 1 2 0.6 — 0.8 1 2 0.6 — 0.8 0.5 0.2 0.7 0.3 0.75 1.05 1.75 Chlorine is generated on -site At 1.0% Solution Top of GST No. 4 Chlorine is generated on -site At 0.8% Solution Top of GST Bison Pump Flomaton System Hydrofluosilicic Acid at 23% Strength Top of GST No. 4 Bison Pump Flomaton System Hydrofluosilicic Acid at 23% Strength Concrete GST .................................................................................................................... Elevated Storage Tank Requirement: 25% MDD Concrete GST Concrete GST Requirement: 25% MDD HSP 1 gpm 800 60 HP, Installed 1998 .......................................... ................... ..................... HSP 2 gpm 800 60 HP, Installed 1997 HSP 3 gpm 1,450 100 HP, Installed 1998 City of Longwood Drinking Water Facilities Plan FINAL cph 0 of Longwood FINAL Drinking Water Facilities Plan Table 1-2: City of Longwood WTP Capacity Overview Total gpm 3,050 Requirement PHD MGD 4.32 Firm (Largest HSP Off -Line) gpm 1,600 Requirement M_DD _+ _F_F......... MGD 2.3 WTP No. 2 HSP 1 gpm 850 40 HP, Unknown Installation Date HSP 2 gpm 1,500 40 HP, Unknown Installation Date HSP 3 gpm 1,500 40 HP, Unknown Installation Date HSP 4 gpm 2,250 40 HP, Unknown Installation Date HSP 5 gpm 2,250 40 HP, Unknown Installation Date gpm 8,350 Requirement: PHD Total MGD 12.024 Firm (Largest HSP Off -Line) gpm 6,100 Requirement: MDD + FF MGD 8.78 PWS Total HSP Capacity gpm 11,400 Requirement: PHD MGD 16.41 PWS Firm HSP Capacity gpm 7,700 Requirement: _MDD.._+....F.F............................................... MGD 10.65 Auxiliary Power WTP No. 1 Diesel Generator kW 350 Operated under load 1 hr per week WTP No. 2 Diesel Generator kW 260 Operated under load 1 hr per week City of Longwood Drinking Water Facilities Plan FINAL cph 9 City of Longwood FINAL Drinking Water Facilities Plan 1.5 Population and Water Demand Projections Under SJRWMD permit No. 8274-7 the City of Longwood is permitted to withdraw an AADD of 2.682 MGD. Historically, the City's two (2) operating WTPs have remained within the limits of the permit allocations. Per 2025 CFWI Population Projections, the City of Longwood is projected to increase population by 12.6% over the next 20 years. Table 1-3 presents the City of Longwood historical population and water use data. Table 1-4 presents the population and water use projections in increments of five (5) years from 2026 to 2046. Over the next twenty (20) years, the AADD is projected to increase to 2.46 MGD and the MDD is projected to increase to 4.66 MGD by the year of 2046. Existing storage components are projected to exceed 75% design capacity in 2030. Therefore, the proposed improvements intend to increase the MDD capacity from 7.056 to 7.88 MGD between 2030 and 2031 in an effort to provide redundancy, maintain the ability to meet fire flow storage, and 20-year projected MDD 25% storage requirement. City of Longwood Drinking Water Facilities Plan FINAL Cph 10 of FINAL Drinking Water Facilities Plan row Table 1-3: CUP • •2.682 Historic Water Use — City of Longwood J MG Year Population EN-50 Well Withdrawal Average Daily Demand MOR Average Daily Demand MOR Max Day Demand Percent CUP Allocation People MGD MGD MGD % 2020 14,019 1.690 1.804 3.232 63.0% 2021 15,222 1.709 2.104 3.475 63.7% 2022 15,612 1.726 1.887 3.330 64.4% 2023 15,952 1.916 2.103 4.711 71.4% 2024 16,641 1.902 2.045 4.179 70.9% 2025 16,974 2.108 2.150 3.184 80.1 % LTable 1-4: Projected Population and Water Use(a) — City of Longwood ELMM CUP Alloca7tion. hMMM Year Projected Population Projected ADD Projected MDD Max Day Design Capacity of the PWS Percent CUP Allocation People MGD MGD MGD % 2026 17,313 2.22 4.22 7.056 82.7% 2031 18,559 2.38 4.53 7.056 88.7% 2036 19,121 2.46 4.66 7.88 91.7% 2041 19,121 2.46 4.66 7.88 91.7% 2046 19,121 2.46 4.66 7.88 91.7% City of Longwood Drinking Water Facilities Plan FINAL cph 11 City of Longwood FINAL Drinking Water Facilities Plan 1.6 Major Project Engineering Services Based on selected Alternative No. 2, the following engineering services are proposed for the City of Longwood PWS improvements to improve reliability, replace aging facilities, and increase capacity: 1. Rehabilitation of WTP No. 2 — 4.60 MGD Capacity i. Demolition • Demolish Fluoride Building. • Demolish HSP Building. • Demolish Electrical Building and Electrical Systems. • Demolish Disinfection Building and on -site Disinfection System. • Demolish Well Pump Buildings. • Demolish Existing Ground Storage Tank G3. • Salvage Existing Generator and Demolish Generator Pad. ii. Site Work • Furnish and Install Temporary Disinfection Facilities. • Furnish and Install New Disinfection Building. • Furnish and Install New High Service Pump Building • Furnish and Install New Electrical and Controls Building. iii. Production Well Rehabilitation • Furnish and Install New Well Head Piping and Pump Assemblies iv. Construction of New Disinfection System • Furnish and Install new Disinfection Feed Pumps, Chemical Piping, and Injection Assemblies. • Furnish and Install new Disinfection Storage. V. Construction of New High Service Pumping System • Furnish and Install New High Service Pumping System. vi. Construction of New Electrical and Controls System • Furnish and Install new Electrical and Controls System. • Furnish and Install new Diesel Generator and Generator Pad. 2. Construction of New WTP — 3.28 MGD i. Site Work • Site Grading, Grassing, and Fencing. • Furnish and Install Concrete Driveway and Parking Area. • Furnish and Install Yard Piping and Point of Connection to Distribution System. ii. Construct, Test, Equip, and Connect LFA Wells • Permit, Install, Equip, and Connect new LFA Production Wells. City of Longwood Drinking Water Facilities Plan FINAL cph 12 City of Longwood FINAL Drinking Water Facilities Plan iii. Construction of Ground Storage Tanks • Furnish and Install two (2) 0.75 MG GSTs. iv. Construction of Advanced Treatment System • Furnish and Install Ozonation System. • Furnish and Install Granular Activated Carbon System. V. Construction of Disinfection System • Furnish and Install Sodium Hypochlorite Storage. • Furnish and Install Chemical Feed Pumps, Piping, and Injection Assemblies. • Furnish and Install Disinfection Building. vi. Construction of High Service Pumping System • Furnish and Install High Service Pumps and Aboveground Piping. • Furnish and Install HSP and Electrical/Controls Building. vii. Construction of Electrical and Controls System • Furnish and Install Electrical and Controls System. • Furnish and Install Diesel Generator and Generator Pad. City of Longwood Drinking Water Facilities Plan FINAL cph 13 City of Longwood FINAL Drinking Water Facilities Plan 1.7 Climate, Topography, and Flood Plain Due to the City's location in Central Florida, the area is humid and warm with highs typically in the low 90's IF in the summer months and low 70's OF in the winter months. The area does not experience frequent freezing temperatures with low's typically in the high 40's OF to low 50's OF in the winter. According to the USDA Soil Map (Appendix A), the planning area is comprised of a mixture of urban land, tavares-miIIhopper fine sands, and Adamsville-Sparr fine sands. Urban land is covered by concrete, asphalt, or other impervious surfaces. Tavares-MiIIhopper Fine Sands are a moderately draining soil while Adamsville-Sparr Fine Sands are a poorly drained soil. The proposed improvements are located outside of the 100-yr and the 500-yr flood plains. Therefore, no impact to the flood plain (100-yr and/or 500-y) is anticipated. The 100-yr and the 500-yr flood hazard contours are incorporated in the FEMA Flood Zone Map shown in Figure 1- 3. City of Longwood Drinking Water Facilities Plan FINAL cph 14 City of Longwood FINAL Drinking Water Facilities Plan 2. Alternatives Analysis and Evaluation 2.1 Objectives and Evaluation Criteria The objective of the alternative analysis is to determine the optimal strategy to upgrade the PWS capacity to meet projected demands, optimize PWS reliability, supplement UFA withdrawal, provide balanced life cycle costs, and O&M requirements. Criteria for the alternative evaluation includes the following: • Engineering services required for each alternative. • Land use and footprint. • Capital cost. 20-year projected annual O&M cost. • 20-year life cycle cost. Three (3) alternatives were developed to evaluate the most feasible option. Alternatives evaluated in the Facilities Plan consist of three (3) projects each and are described in Table 2-1: Table 2-1: City of Longwood DW SRF Alternatives Description Alternative No. 1 Alternative No. 2 Alternative No. 3 Project No.1 Decommission WTP Rehabilitate WTP No. 2 Rehabilitate WTP No. 1 No. 1 4.60 MGD 2.44 MGD Project No. 2 Decommission WTP Construct WTP No. 3 Rehabilitate WTP No. 2 No. 2 3.28 MGD 4.60 MGD Project No. 3 Construct WTP No. 3 NSA Construct WTP No. 3 7.88 MGD 0.84 MGD Capital costs were assumed to be financed completely through the FDEP SRF program. The 2026 DWSRF program interest rate is 2.736% with a Thirty (30) million dollar per year maximum allocation. City of Longwood Drinking Water Facilities Plan FINAL cph 16 of Longwood FINAL Drinking Water Facilities Plan 2.1.1 Operations and Maintenance Program The improvements presented in the Drinking Water Facilities Plan intend to increase PWS capacity by 12% from 7.056 MGD to 7.88 MGD to meet projected demands. Additionally, the improvements intend to supplement UFA withdrawal with a new WTP (WTP No.3) that utilizes LFA production wells and is equipped with advanced treatment capabilities. The proposed method of advanced treatment at WTP No. 3 is Ozonation followed by Granular Activated Carbon (GAC) filtration. Therefore, the O&M procedures practiced by the City will be expanded to include additional electrical power, labor, filtration media replacement, wastewater control from backwashing GAC Vessels, treatment process component maintenance, additional disinfection requirements (Sodium Hypochlorite), and advanced oxidation treatment requirements (Liquid Oxygen for Ozonation). A breakdown of the O&M cost associated with the proposed improvements is presented in Appendix C. Currently the City utilizes two (2) operators, each working 8 hour shifts. The O&M cost estimate assumed the City would continue this practice at WTP No. 1 and WTP No. 2. The labor requirements associated with WTP No. 3 were estimated utilizing Fla. Administrative Code 62-699.310 - Classification and Staffing of Domestic Wastewater or Water Treatment Plants and Water Distribution Systems. Due to the advanced treatment components associated with WTP No. 3, the facility was assumed to be classified as a Water Treatment Plant Category I I I and requires a Class C or higher operator. Chemical costs for disinfection were based on billing data from 2022 and 2023 and were adjusted to current 2026 dollars. 2.1.2 Managerial and Technical Capacity The proposed improvements aim to expand the capacity of the PWS to 7.88 MGD and introduce advanced treatment capabilities at the proposed WTP No. 3 facility. As a result, the City intends to expand the operator team to include a third full-time positioned as Chief/Lead Operator — Class C or Higher. The estimated cost with an additional operator is included in the O&M cost estimate as shown in Appendix C. City of Longwood Drinking Water Facilities Plan FINAL cph 17 City of Longwood FINAL Drinking Water Facilities Plan 2.2 Capital Cost Analysis Table 2-2 presents the life cycle cost of the three (3) evaluated alternatives. A detailed cost breakdown is provided in Appendix C. The estimated total capital cost includes construction, equipment, material, demolition, SRF contingency, SRF administration, engineering design services, and post design technical services (Construction Administration (CA) and Construction Engineering Inspection (CEI)). Alternative No. 1 exhibited the highest Capital and O&M costs yielding and a twenty (20) year Lifecycle Cost of $154,862,074. Alternative No. 3 resulted in the lowest O&M cost, however, the increased Capital Cost associated with Alternative No. 3 yields the second largest Lifecycle cost out of the three (3) alternatives with an estimated $128,771,326 Lifecycle cost. As a result, Alternative No. 2 possesses the lowest life cycle cost of $126,488,288. Table 2-2: City of Longwood DWSRF Lifecycle Cost Analysis mO Alternative Alternative Alternative No. 1 No. 2 No. 3 Total Capital Cost ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... $86,085,000 $70,130,000 $78,512,000 Interest Rate 2.736% 2.736% 2.736% ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Loan Period (yrs) 20 20 20 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Estimated Interest Owed $32,480,096 $26,460,233 $31,543,005 Total Cost From Loan $118,565,096 $96,590,233 $108,134,784 ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Annualized Capital Cost $5,645,957 $4,599,535 5,149,275 20-Year O&M Cost $48,421,000 $37,286,000 $31,694,000 Annualized O&M Cost $2,305,761 $1,775,506 $1,509,214 20-Year Total Lifecycle Cost $166,986,096 $133,876,233 $139,828,784 �.� -. . • • . 1 • . . City of Longwood Drinking Water Facilities Plan FINAL Cph 18 City of Longwood FINAL Drinking Water Facilities Plan 2.2.1 Alternative No. 1 Evaluation and Lifecycle Cost Description Alternative No. 1 consists of the following three (3) projects: 1. Decommission WTP No. 1 2. Decommission WTP No. 2 3. Construct WTP No. 3 on a New Site — 7.88 MGD Capacity Discussion Alternative No. 1 investigated the alternative of providing the City of Longwood PWS through one (1) 7.88 MGD WTP equipped with Redundant LFA Production Wells, Advanced Treatment Capabilities, and Storage. However, due to the constraints of the existing sites for WTP No. 1 and WTP No. 2, the expansion of existing facilities is not feasible due to the small footprint at both existing WTPs. Alternative No. 1 would be achieved by maintaining operation of WTP No. 1 and WTP No. 2 while constructing WTP No. 3 on a new site owned by the City. Following the construction and implementation of WTP No. 3, WTP No. 1 and WTP No. 2 would be decommissioned and abandoned. Life Cycle Upon completion of Alternative No. 1, the City of Longwood would no longer require UFA withdrawal to serve the population's potable water demand, thus enabling the City to conform to CFWI prerogatives. The upgraded facility would allow the City to focus their O&M program to one (1) facility rather than requiring oversight and operation of multiple sites and facilities. However, due to the requirements of Advanced Treatment, Alternative No. 1 yields the highest O&M cost and will require a more complex O&M program to maintain the upgraded system. Moreover, Alternative No. 1 yields the highest Capital Cost and O&M cost of the three (3) alternatives identified, resulting in the highest Lifecycle Cost. Table 2-3 exhibits the Lifecycle Cost from 2026 to 2046 associated with Alternative No.1. A detailed breakdown of the estimated Life Cycle Cost associated with Alternative No. 1 is provided in Appendix C. Conclusion Due to the extensive Capital Cost, O&M Requirements, and site restraints, Alternative No. 1 was n f%f �- o i o..+o.l City of Longwood Drinking Water Facilities Plan FINAL Cph 19 of Longwood FINAL Drinking Water Facilities Plan TableNo. 1 20-Year• Project No. 1 — Decommission WTP No. 1 $1,440,000 ............................................................................................. Project No. 2 -Decommission WTP No. 2 $2,180,000 ............................................................................................. ......... ......... ......... ......... ......... Project No. 3 — Construct WTP No. 3 — 7.88 MGD $58,000,000 Subtotal $61,620,000 ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... SRF Contingency (10%) $6,162,000 Total Construction Cost $67,782,000 .................................................................................................................................................................................................................................... SRF Admin (2%) ................................................................................................................................. $1,356,000 ...................................................... ......... ......... ......... ......... ...... Design/Permitting and Bidding Services (15%) ....................................................................................................................... $10,168,000 Post Design Technical Services (CA/CEI) (10%) $6,779,000 Estimated Capital Cost $86,085,000 ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Assumed Interest Rate 2.736% Total Cost Accrued From Loan $118,565,096 ........ ......... ......... ......... ......... 20-Year Annualized Capital Cost ........ ........ ........ ........ ......... $5,645,957/yr Estimated 20-Year O&M Cost $48,421,000 Estimated 20-Year Annualized O&M Cost $2,305,761/yr Total 20-Year Life Cycle Cost $166,986,096 ff . -. f -. City of Longwood Drinking Water Facilities Plan FINAL Cph 20 City of Longwood FINAL Drinking Water Facilities Plan 2.2.2 Alternative No. 2 Evaluation and Life Cycle Cost Description Alternative No. 2 consists of the following two (2) projects: 1. Rehabilitate WTP No. 2 — 4.60 MGD Capacity 2. Construct WTP No. 3 on a New Site — 3.28 MGD Capacity Discussion Alternative No. 2 evaluated the option of operating the City's PWS utilizing two (2) WTPs in an effort to provide the PWS with increased redundancy and reduce the Lifecycle Cost exhibited in Alternative No. 1. Due to site constraints at WTP No. 1 and WTP No. 2, LFA production well and advanced treatment system installation is not feasible at the existing sites. Therefore, a new site owned by the City will be utilized to construct WTP No.3 with a capacity of 3.28 MGD. The construction of WTP No.3 allows the City to decommission one of the existing WTPs. Currently, the PWS may generally be supported by WTP No. 2, however, WTP No. 1 does not have the capacity to sustain the City's observed demand for an extended time period. Therefore, WTP No. 2 shall be rehabilitated and WTP No. 1 shall be decommissioned to maximize reliability of the PWS. Alternative No. 2 does not propose an increase in capacity for WTP No. 2. Additionally, WTP No. 1 will remain online throughout the duration of the projects listed under Alternative No. 2 to supply the PWS with a reliable water source during the construction of WTP No. 3 and rehabilitation of WTP No. 2. Decommissioning of WTP No. 1 will take place after the completion of Alternative No. 2 and will be under a separate funding source. Therefore, the capital cost to decommission WTP No. 1 was not considered with Alternative No. 2. City of Longwood Drinking Water Facilities Plan FINAL Cph 21 of FINAL Drinking Water Facilities Plan Life Cycle Appendix B presents an overview of the improvements included in Alternative No. 2. Completion of Alternative No. 2 will exhibit an upgraded and robust PWS with the capacity to meet projected MDD and Fire Flow requirements. Additionally, construction of WTP No. 3 will adequately supplement the UFA withdrawals to be in conformance with CFWI prerogatives. Moreover, operation of two (2) WTPs provides capability of the PWS to maintain service during future maintenance operations or upgrades to the WTPs. Decreasing capacity of WTP No. 3 to 3.28 MGD compared to 7.88 MGD as exhibited in Alternative No. 1 will significantly decrease Capital and O&M cost of the project since advanced treatment components/maintenance will not be necessary at rehabilitated WTP No. 2. Alternative No. 2 possesses the lowest Capital Cost, second lowest O&M cost, and lowest Life Cycle Cost out of the Three (3) alternatives discussed in this section. Table 2-4 exhibits the Life Cycle Cost from 2026 to 2046 Associated with Alternative No.2. A detailed breakdown of the estimated Life Cycle Cost associated with Alternative No. 2 is provided in Appendix C. Conclusion Alternative No. 2 contains the lowest capital cost and lowest life cycle cost in addition to meeting the objectives of the proposed improvements to the PWS, therefore, Alternative No. 2 is the selected alternative. City of Longwood Drinking Water Facilities Plan FINAL cph 22 City of Longwood FINAL Drinking Water Facilities Plan • • 2 20-Year Project No. 1 - Rehabilitate WTP No. 2 — 4.60 MGD1 $13,200,000 ............................. Project No. 2 — Construct WTP No. 3 — 3.28 MGD2 ......... ......... ......... ......... ......... $37,000,000 Subtotal $51,640,000 SRF Contingency (101/() $5,164,000 Total Construction Cost $56,804,000 .................................................................................................................................................................................................................................................................. SRF Admin (2%) ..................................................................................................................................... $1,137,000 .............................................................................................................................................................................................................................. Design/Permitting and Bidding Services (15%) ........ ........ ........ ........ ......... $8,521,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Post Design Technical Services (CA/CEI) (10%) $5,681,000 Estimated Capital Cost $70,130,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Assumed Interest Rate 2.736% Total Cost Accrued From Loan $96,590,233 Estimated 20-Year Annualized Capital Cost $4,599,535/yr Estimated 20-Year O&M Cost $37,286,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Estimated 20-Year Annualized O&M Cost $1,775,506/yr Total 20-Year Life Cycle Cost $133,876,233 Estimated 20-Year Annualized Life Cycle Cost $6,375,059/yr Design and Construction of LFA Wells for WTP No. 3 (Project No. 2) will be completed during the Design/Construction Phase of Project No. 1. Capital Cost for LFA Wells is included in the Capital Cost associated with the Construction of WTP No. 3 2Design for Project No. 2 is planned to begin after construction for Project No. 1 begins and water quality is known for WTP No. 3 LFA Production Wells. City of Longwood Drinking Water Facilities Plan FINAL Cph 23 City of Longwood FINAL Drinking Water Facilities Plan 2.2.3 Alternative No. 3 Evaluation and Life Cycle Cost Description Alternative No. 3 Consists of the following projects: 1. Rehabilitate WTP No. 1 — 2.44 MGD Capacity 2. Rehabilitate WTP No. 2 — 4.60 MGD Capacity 3. Construct WTP No. 3 on a New Site — 0.84 MGD Capacity Discussion Alternative No. 3 explores the option of rehabilitating WTP No. 1 and WTP No. 2. Alternative No. 3 does not propose a change in capacity for WTP No. 1 nor WTP No. 2. In order to meet the projected max day design capacity and supplement UFA withdrawals in conformance with CFWI. Alternative No. 3 also consists of constructing WTP No. 3 on a new site utilizing LFA production wells with advanced treatment capabilities and a max day design capacity of 0.84 MGD which will increase the Max Day Design Capacity of the PWS to 7.88 MGD. Life Cycle Alternative No. 3 attempts to minimize Capital and O&M costs by utilizing existing sites and minimizing advanced treatment included in the improvements. Although advanced treatment is minimal compared to Alternative No. 1 and Alternative No. 2, Alternative No. 3 requires a third WTP to operate and maintain which will require additional staffing, maintenance conditions, and capital costs to upkeep all three (3) facilities. Moreover, due to the limited capacity of WTP No. 3, the City's withdrawal from the UFA may not be sufficiently supplemented to reduce UFA withdrawals within CFWI prerogatives without placing stress on WTP No. 3. Table 2-5 exhibits the Life Cycle Cost from 2026 to 2046 associated with Alternative No.3. A detailed breakdown of the estimated Life Cycle Cost associated with Alternative No. 3 is provided in Appendix C. Conclusion Alternative No. 3 was not selected due to the capital cost and the future implications of maintaining and upgrading three (3) facilities. Additionally, the limited capacity of WTP No.3 posed challenges to conform to CFWI Prerogatives. City of Longwood Drinking Water Facilities Plan FINAL Cph 24 of Longwood FINAL Drinking Water Facilities Plan TableNo. 3 20-Year• Project No. 1 — Rehabilitate WTP No. 1 — 2.4 MGD $13,000,000 ........................................................................................................................................................ Project No. 2 — Rehabilitate WTP No. 2 — 4.60 MGD $13,200,000 ............................................................................................................................................................................. Project No. 3 — Construct WTP No. 3 — 3.28 MGD $37,000,000 Subtotal $56,200,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... SRF Contingency (10%) $5,620,000 Total Construction Cost $61,820,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... SRF Admin (2%) $1,237,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Design/Permitting and Bidding Services (15%) $9,273,000 Post Design Technical Services (CA/CEI) (10%) $6,182,000 Estimated Capital Cost $78,512,000 .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Assumed Interest Rate 2.736% Total Cost Accrued From Loan $108,134,784 ........ ......... ......... ......... ....... Estimated 20-Year Annualized Capital Cost ......... ......... ......... .................. 5,149,275/yr Estimated 20-Year O&M Cost $31,694,000 Estimated 20-Year Annualized O&M Cost ................................ ........................................ $1,509,214/yr Total 20-Year Life Cycle Cost $139,828,784 Fqfi-ff.?tPV i .. City of Longwood Drinking Water Facilities Plan FINAL Cph 25 City of Longwood FINAL Drinking Water Facilities Plan 3. Environmental Effects On June 25, 2025, CPH Consulting, LLC Environmental Services conducted a field study to determine environmental effects of the proposed project. The findings from the field study established that the project would not cause significant adverse effects upon human health and/or the environment based on conditions observed. The detailed Preliminary Ecological Assessment Report is provided in Appendix D. A copy of Preliminary Ecological Assessment Report is to be submitted to the Florida State Clearinghouse as required by the DWSRF program. 3.1 Flora, Fauna, Threatened or Endangered Plant or Animal Species General reconnaissance of the site was conducted to investigate the occurrence of federal or state -listed flora and fauna. No species (or their signs) protected under the Endangered Species Act (ESA) nor State -listed protected species were observed on the subject properties at the time of the field investigation. Also, the Florida Department of Agriculture and Consumer Services (DACS) protected plants were not observed on the investigated field. Per the Preliminary Ecological Assessment, the proposed construction activities are not anticipated to directly kill or harm birds, their nests or eggs. Development of the subject project area has a low probability of Violating the Migratory Bird Treaty Act (MBTA). No Eagle activity was observed within, or adjacent to, the subject project areas during the field investigation. Wood stork foraging and nesting habitat was not observed within the study areas. Gopher tortoises and their signs (scat and burrows) were not observed at the time of the field investigation. Scrub Jay territory was not observed within or near the study areas. The lack of bare open continuous sand patches provides suboptimal habitat for skinks. Therefore, there is a low probability that the sand skink and blue -tailed mole skink would be adversely affected by the proposed project. Based upon field observations, snail kite habitat was not observed on the subject property. Therefore, proposed improvements would not adversely affect this species. Based on current regulatory guidance, further action to address the snail kite is not a consideration of this property. 3.2 Surface Water Bodies or Wetlands Habitats meeting the definition of jurisdictional wetlands and surface waters were not observed within the subject project property boundary during the field investigation. City of Longwood Drinking Water Facilities Plan FINAL Cph 26 City of Longwood FINAL Drinking Water Facilities Plan 4. Public Participation A public meeting was conducted on May 28,2026, to explain the proposed project and financial impacts to the residents. The public participation meeting was publicly advertised fourteen (14) days prior to the meeting to allow for public review of Facilities Plan alternatives. The copy of advertisement, affidavit of publication, CPH Consulting presentation, and public meeting minutes are to be included in Appendix E. 5. Financial Feasibility 5.1 Business Plan Appendix H presents the financial information (Business Plan) that demonstrates the City's financial ability to repay the SRF loan. 5.2 Water Rate and Charges The current water rates and charges have been reviewed for adjustment. Future rate increases have been planned and implemented via City Ordinance. Appendix I presents City Ordinance passed to implement future rate structure increases. Future rate increases have been projected and incorporated into the business plan. Additionally, the City of Longwood charges a capital recovery impact fee for new connections. City of Longwood Drinking Water Facilities Plan FINAL cph 27 City of Longwood FINAL Drinking Water Facilities Plan 6. Project Implementation The proposed improvements consist of three (3) projects that will be implemented in a phased approach. The proposed phased approach aims to address concerns regarding the ability of the PWS to maintain service to customers within the service area while rehabilitating WTP No. 2. The recommended strategy is to implement temporary measures so that WTP No. 2 is able to maintain service while the improvements are underway. Additionally, to maintain the reliability of the system, decommissioning of WTP No. 1 is to begin after WTP No. 3 has been permitted, constructed, and placed into service. The intent of WTP No. 3 is to replace WTP No. 1. The following FDEP permits will be required to complete the improvements: • NPDES Stormwater Construction Generic Permit • Specific Permit to Construct PWS Components • Environmental Resource Permit • Wastewater permit for connection to sanitary sewer City of Longwood Drinking Water Facilities Plan FINAL cph M. City of Longwood FINAL Drinking Water Facilities Plan 7. Adoption Resolution The City of Longwood adopted the Facilities Plan resolution during the Commission Meeting held on June 15, 2026. A copy of Resolution No. 26 is included in Appendix F. 8. Updated Request For Inclusion The Request for Inclusion is located in Appendix G. An Intent schedule has been provided in Table 8-1. 1 Dates are tentative and subject to changes to assure compliance with DWSRF funding process, the City of Longwood administrative process, and CPH Consulting resources. 2Planning documents for Project No. 2 will be submitted with the planning documents for Project No. 1, however, design for Project No. 2 is scheduled to begin after Project No. 1 moves into Construction Phase. City of Longwood Drinking Water Facilities Plan FINAL Cph 29 City of Longwood FINAL Drinking Water Facilities Plan APPENDIX A: USDA Soils Map City of Longwood Drinking Water Facilities Plan FINAL cph A-1 10 Study Area #1 20 Soil No. Description Approx. Acreage _ 31 Tavares-Millhopper fine sands, 0 to 5 percent slopes 0.92 r i `ti p-, Study Area #2 Soil No. Description Approx. Acreage 34 Urban land, 0 to 2 percent slopes 0.60 Study Area #3 Soil No. Description Approx. Acreage '•�' La, 2 Adam sviIle-Spa rr fine sands 0.001 99 , 31 Tavares -Mill hopper fine sands, 0 to 5 percent slopes 1.799 34 Urban land, 0 to 2 percent slopes 0.920 USDA Natural Resource Conservation Service 31 -2o �. t- s ry ` 31 .�.... , 99 99 Approx. Project ` • 9g�} Boundary 1 ;M ly ,�0 s' ••' Study Area #2 R ' Approx. Project fr Boundary 1Study Area # Brox.Po ect �U4oundary Y tMYw R n.., 1•.P f - -. Study Area #3 .ra IMMIX a103 - 2 1 31 •o.e I m 10 1& l� '""' I � � ia�ii • T I J `t r N a> �� MIMI . i !. t. :� 20 Via. 0"o YlYsfi1' l 4. wV 31 r 1.rf ► tiwF 14 1.4� 1� _•ter i r�2 'O , • ~u 99 �_ ► .�% 1 20 31 spa `2'� �a . Scale: 1 inch = 1,600 feet N SOILS MAP Date: 7/2/2025 FIGURE C it Photo Date 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN 2 Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR A SEMINOLE COUNTY, FLORIDA City of Longwood FINAL Drinking Water Facilities Plan APPENDIX B: Alternative No. 2 Conceptual Figures City of Longwood Drinking Water Facilities Plan FINAL cph _ 1 a a 4 Approximate WTP No. 2 �� ■� j� Boundary - • 1 Y VIM w � � 1 � � , • fir► + � ' f 1) rj^ > � N 4 ❑ G - ,�•' _ F5 Cn cc -' X X X - 1� X X X X T XX;kXX S / X X f ®1 - Demolish Existing Fluoride Building and Construct New MCC and Electrical Building 2 - Demolish Generator Pad and Salvage Existing Generator, Construct New Generator Pad and Generator ® 3 - Demolish and Reconstruct HSP Room and Operations Space ® 4 - Demolish and Reconstruct Disinfection System ®5 - Remove Well Pump Building and Reassemble Well Pump and - Yard Piping ® 6 - Demolish Well Pump Building ® 7 - Demolish Existing GST Scale: 1 inch = 30 feet N CITY OF LONGWOOD WTP NO. Z RESILIENCY IMPROVEMENTS Date: S/14/2026 FIGURE Photo Date: 2024 CITY OF LONGWOOD Project No. 2500699 SEMINOLE COUNTY, FLORIDA x GIS: LEC 4� Approximate Proposed WTP No. 3 Boundary -- i • ® I - Construct and Equip New Well ti ►6I/ 1 EM2 - Construct and Equip New Well ! 3 - Construct New Generator and Generator Pad 4 - Construct HSP Room, MCC, and Operations SpaceF m 5 - construct Liquid NaOCI Disinfection System 1 A ®6 - Construct Ground Storage Tank`—' ®7 - Construct Advanced Treament System State Hwy 434 E State Rd 434 _ .. ® 8 - Construct Concrete Driveway Scale: I inch = 60 feet N CITY OF LONGWOOD PROPOSED WTP NO. 3 Date: 5/ 14/ 2026 FIGURE Photo Date; 2024 CITY OF LONGWOOD project No. 2500699 SEMINOLE COUNTY, FLORIDA x GIS: LEC City of Longwood FINAL Drinking Water Facilities Plan APPENDIX C: Life Cycle Cost Breakdown City of Longwood Drinking Water Facilities Plan FINAL cph C-1 Printed On: 5/4/2026 City of Longwood DWSRF Facilities Plan - Life Cycle Cost CPH Project No. 2500699 A B C D E F G H I J K L M N O P Q R S T U V W X 1 Twenty -Year Annualized Capital Cost 2 3 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 Total Alterntative No. 1 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $5,645,957 $1 1 8,565,096 4 Alternative No. 2 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $4,599,535 $96,590,233 5 6 Alternative No. 3 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $5,149,275 $108,134,784 Twenty -Year O&M Cost V� III 7 9 Alterntative No. 1 $1,747,000 $1,788,928 $1,831,862 $1,875,827 $1,990,116 $2,037,879 $2,086,788 $2,136,871 $2,188,156 $2,240,671 $2,294,448 $2,349,514 $2,405,903 $2,463,644 $2,522,772 $2,583,318 $2,645,318 $2,708,806 $2,773,817 $2,840,389 $2,908,558 $48,421,000 10 Alternative No. 2 $1,333,000 $1,364,992 $1,397,752 $1,431,298 $1,534,918 $1,571,756 $1,609,478 $1,648,106 $1,687,660 $1,728,164 $1,769,640 $1,812,112 $1,855,602 $1,900,137 $1,945,740 $1,992,438 $2,040,256 $2,089,222 $2,139,364 $2,190,709 $2,243,286 $37,286,000 11 Alternative No. 3 $1,142,000 $1,169,408 $1,197,474 $1,226,213 $1,302,921 $1,334,191 $1,366,212 $1,399,001 $1,432,577 $1,466,959 $1,502,166 $1,538,218 $1,575,135 $1,612,938 $1,651,649 $1,691,289 $1,731,879 $1,773,445 $1,816,007 $1,859,591 $1,904,222 $31,694,000 M1 M Mill, AL Twenty -Year Total Life Cycle Cost 12 in 13 Alterntative No. 1 $7,392,957 $7,434,885 $7,477,819 $7,521,784 $7,636,073 $7,683,836 $7,732,745 $7,782,828 $7,834,113 $7,886,628 $7,940,405 $7,995,471 $8,051,860 $8,109,601 $8,168,729 $8,229,275 $8,291,275 $8,354,763 $8,419,774 $8,486,346 $8,554,515 $1 66,986,000 14 Alternative No. 2 $5,932,535 $5,964,527 $5,997,287 $6,030,833 $6,134,453 $6,171,291 $6,209,013 $6,247,641 $6,287,195 $6,327,699 $6,369,175 $6,411,647 $6,455,137 $6,499,672 $6,545,275 $6,591,973 $6,639,791 $6,688,757 $6,738,899 $6,790,243 $6,842,820 $1 33,876,000 15 Alternative No. 3 $6,291,275 $6,318,683 $6,346,749 $6,375,489 $6,452,197 $6,483,467 $6,515,487 $6,548,276 $6,581,853 $6,616,234 $6,651,441 $6,687,493 $6,724,411 $6,762,214 $6,800,924 $6,840,564 $6,881,155 $6,922,720 $6,965,283 $7,008,867 $7,053,497 $1 39,829,000 16 17 18 Alternative No. 1 Alternative No. 2 Alternative 19 Capital Cost $86,085,000 $70,130,000 $78,512,000 20 Interest Rate 2.74 % 2.74 % 2.74 21 Loan Period(yrs) 20 20 20 22 Estimated Interest Owed $32,480,096 $26,460,233 $29,622,784 23 Total Cost From Loan $118,565,096 $96,590,233 $108,134,784 24 Annualized Capital Cost $5,645,957 $4,599,535 $5,149,275 25 Annualized O&M Cost $2,305,742 $1,775,506 $1,509,214 26 20 Year O&M Cost $48,421,000 $37,286,000 $31,694,000 27 1 20-Year Lifecycle Cost $166,986,096 $133,876,233 $139,828,784 28 J:\2500699\Civil\Modeling-Calcs-Estimates\Capital & O&M Cost\Draft to City For Review\City of Longwood DWSRF Facilities Plan - O&M Cost Analysis DRAFT Page 1 of 1 Printed On: 5/1/2026 City of Longwood DWSRF Facilities Plan - O&M Cost Analysis DRAFT - O&M Summary CPH Job No. 2500699 A B C I D Alternative (1) 2 3 Year 2026 4 Plant No. WTP1 WTP2 WTP3 5 MDD (MGD) JE16"= 0 0 7.04 6 Annual Avg. Chemical Usage Cost ($)-Current Treatment 1 $0 $0 $528,000 7 Annual Avg. Chemical Usage Cost ($)-GAC Media Replacement Cost $0 $0 $659,000 8 Annual Avg. Operational Cost ($)-Ozonation $0 $0 $90,000 9 Total Annual Avg. Chemical Usage Cost ($)/Plant $0 $1,277,000 10 Total Annual Avg. Labor Cost ($) $470,000 11 Total Annual Avg. O&M Cost ($) $1,747,000 12 Alternative (2) 13 Year 2026 14 Plant No. WTP1 WTP2 WTP3 15 MDD (MGM0 4.6 2.44 16 Annual Avg. Chemical Usage Cost ($)-Current Treatment $0 $345,000 $183,000 17 Annual Avg. Chemical Usage Cost ($)-GAC Media Replacement Cost $0 1 $0 1 $275,000 18 Annual Avg. Operational Cost ($)-Ozonation $0 $0 $60,000 19 Total Annual Avg. Chemical Usage Cost ($)/Plant $0 $345,000 $518,000 20 Total Annual Avg. Labor Cost ($) $470,000 21 Total Annual Avg. O&M Cost ($) $1,333,000 22 Alternative (3) 23 Year 2026 24 Plant No. WTP1 WTP2 WTP3 25 MDD (MGD) 2.44 4.6 0.84 26 Annual Avg. Chemical Usage Cost ($)-Current Treatment $183,000 $345,000 $63,000 27 Annual Avg. Chemical Usage Cost ($)-GAC Media Replacement Cost $0 1 $0 $60,000 28 Annual Avg. Operational Cost ($)-Ozonation $0 $0 $21,000 29 Total Annual Avg. Chemical Usage Cost ($)/Plant $183,000 $345,000 $144,000 30 Total Annual Avg. Labor Cost ($) $470,000 31 Total Annual Avg. O&M Cost ($) $1,142,000 Pagel of 1 Printed On: 5/1/2026 City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT- May 2026 - Alternatives Summary CPH Job No. 2500699 A B C I D I E F I G H I 1 2 ISM • • • • • • Total Engineering SRF Contingency SRF Admin CA CEI Total Project 4 Total Cost Construction Services Cost 10% Cost 2% 15% 5% 5% 5 Alternative No. 1 $61,620,000 $6,162,000 $67,782,000 $1,356,000 $10,168,000 $3,389,500 $3,389,500 $86,085,000 6 Alternative No. 2* $50,200,000 $5,020,000 $55,220,000 $1,105,000 $8,283,000 $2,761,000 $2,761,000 $70,130,000 7 Alternative No. 3 $56,200,000 $5,620,000 $61,820,000 $1,237,000 $9,273,000 $3,091,000 $3,091,000 $78,512,000 s 9 *Alternative No. 2 is the selected Alternative 10 11 12 13 14 Alternative No. 1 Alternative No. 2 Alternative No. 3 1s Project No.1 Decommission WTP No. 1 Rehabilitate WTP No. 2 - 4.60 MGD Rehabilitate WTP No. 1 - 2.44 MG 16 Project No. 2 Decommission WTP No. 2 Construct WTP No. 3 - 3.28 MGD Rehabilitate WTP No. 2 - 4.60 MG 17 Construct WTP No. 3 - 7.28 MGD [Construct WTP No. 3 - 0.84 MGD Project No. 3 N/A 1s Total Cost $86,085,000 $70,130,000 $78,512,000 19 J:\2500699\Civil\Modeling-Calcs-Estimates\Capital & O&M Cost\Draft to City For Review\City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT - May 2026 Page 1 of 11 Printed On: 5/1/2026 City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT - May 2026 - Alternative No. 1 Breakdown CPH Job No. 2500699 A B C D E F G 2 3 Project No. 1 - Decommission WTP No. 1 4 Item Description Unit Quantity Unit Cost Total Cost Comments 5 General Conditions 6 1 21 Mobilization Bonds, Insurance Demobilization and Project Closeout LS 5% $64,000 $64,000 7 LS 1 $26,000 $26,000 8 Demolition and Site Work =IF, 9 3 Erosion and Sedimentation Control LS 1 $100,000 $100,000 10 4 Removal of On -Site Buildings LS 1 $400,000 $400,000 11 5 Salvage of Generator and Demolition of Generator Pad LS 1 $50,000 $50,000 12 6 Abandonment of Wells EA 2 $75,000 $150,000 131 7 Abandonment of Yard Piping LS 1 $150,000 $150,000 141 81 Demolition of Ground Storage Tank EA 1 $500,000 $500,000 MLA&oject No.. • 1 1 1 1 Project No. 2 -Decommission WTP No. 2 16 17 General Conditions 18 1 21 Mobilization Bonds, Insurance Demobilization and Project Closeout LS 5% $110,000 $110,000 19 LS 1 $41,000.00 $41,000.00 20 Demolition and Site Work 21 3 Erosion and Sedimentation Control LS 1 $100,000 $100,000 22 4 Removal of On -Site Buildings LS 1 $500,000 $500,000 23 5 Salvage of Generator and Demolition of Generator Pad LS 1 $50,000 $50,000 24 6 Abandonment of Wells EA 3 $75,000 $225,000 25 7 Abandonment of Yard Piping LS 1 $150,000 $150,000 26 81 Demolition of Ground Storage Tank EA 2 $500,000 $1,000,000 27 • • • : 1 111 28 Project No. 3 - Construction of WTP No.3 - 7.88 MGD 29 General Conditions 5% 30 1 2 Mobilization/Demobilization, Bonds, Insurance Record Drawings and Project Closeout LS LS 5% $2,379,000 $2,379,000 31 1 $714,000 $714,000 32 33 Site Work 3 Erosion and Sedimentation Control LS 1 0 6% $250,000 $250,000 34 4 Grading, Grassing, and Fencing LS 1 $2,000,000 $2,000,000 35 5 Furnish and Install Concrete Driveway and Parking Area LS 1 $75,000 $75,000 36 6 Furnish and Install Yard Piping LS 1 $1,200,000 $1,200,000 37 Equip and Connect LFA Wells 17% 38 7 Install and Equip LFA Well EA 3 1 $3,250,000 1 $9,750,000 39 Ground Storage Tanks 14% 40 8 Furnish and Install 1.2 MG GST EA 2 $4,000,000 $8,000,000 41 Advanced Treatment System 28% 42 91 Furnish and Install Granular Activated Carbon System LS 1 $10,000,000 $10,000,000 8 Pressure Vessels 43 10 Furnish and Install Ozonation System LS 1 $6,500,000 $6,500,000 44 Disinfection System 2% 45 11 Furnish and Install Sodium Hypochlorite Storage Tank LS 1 $100,000 $100,000 461 12 Furnish and Install Chemical Feed Pumps Furnish and Install Disinfection Building LS 1 $350,000 $350,000 47 13 SF 1000 $500 $500,000 48 High Service Pumps 6% 49 14 151 unnstall High Service Pumps and Aboveground Piping Furnish and Install HSP and Controls Building LS 1 $1,750,000 $1,750,000 50 SF 3200 $500 $1,600,000 51 Electrical and Controls System 21% 52 161 17 Furnish and Install Electrical and Controls System Furnish and Install Diesel Generator and Generator Pad LS LS 1 $11,000,000 $11,000,000 53 1 $1,000,000 $1,000,000 54 • • • • 111 111 55 Alternative No.1 Project Cost Summary 56 Project No. 1- Decommission WTP No. 1 Construction Cost Project No. 2 - Decommission WTP No. 2 Construction Cost Project No. 3 - Construct WTP No. 3 - 7.88 MGD Construction Cost $1,440,000 57 $2,180,000 58 $58,000,000 59 Alternative No. 1 Subtotal $61,620,000 60 SRF Contingency 10% $6,162,000 61 Alternative No.1 Total Construction Cost 1 $67,782,000 62 SRF Administration 2% $1,356,000 1631 64 Design/Permitting and Bidding Engineering Services Post Design Technical Services (CEI and CA) 15% $10,168,000 10% $6,779,000 65 Alternative No. 1 Total• - • :. 1: 111 J:\2500699\Civil\Modeling-Calcs-Estimates\Capital & O&M Cost\Draft to City For Review\City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT - N/Pcggk(26f 11 Printed On: 5/1/2026 City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT - May 2026 - Alternative No. 2 Breakdown CPH Job No. 2500699 A B C D E F G H 1 • • • • • 2 Project No. 1 Rehabilitation of WTP No. 2 - 4.60 MGD 3 Item Description Unit Quantity Unit Cost Total Cost Comments 4 General Conditions 5 1 Mobilization/Demobilization, Bonds, Insurance % 5% $600,000 $600,000 5% 6 21 Record Drawings and Project Closeout LS 1 $120,000 $120,000 1% 7 Demolition 8 3 Erosion and Sedimentation Control LS 1 $100,000 $100,000 9 4 Demolish Existing Fluoride Building LS 1 $100,000 $100,000 10 5 Demolish Existing HSP Room and Electrical System LS 1 $300,000 $300,000 11 6 Demolish Existing Disinfection Building and Disinfection System LS 1 $100,000 $100,000 12 7 Salvage of Generator and Demolition of Generator Pad LS 1 $50,000 $50,000 13 8 Demolish On -Site Well Pump Buildings EA 3 $33,333 $100,000 14 15 91 Site Work 10 Demolish Existing Ground Storage Tank Furnish and Install Temporary Disinfection Facilities EA LS 1 1 $500,000 $300,000 $500,000 $300,000 16 17 11 Furnish and Install New Disinfection Building SF 600 $500 $300,000 18 12 Furnish and Install New High Service Pump Building SF 2400 $500 $1,200,000 19 20 13 Wells 14 Furnish and Install New Electrical and Controls Building SF 1000 Furnish and Install Well Head Piping and Pump Assemblies EA 2 $500 1 $350,000 $500,000 $700,000 21 22 15 Well Pump Test EA 2 $50,000 $100,000 23 Disinfection System 24 161 Furnish and Install New Disinfection Feed Pumps LS 1 $200,000 $200,000 25 171 Furnish and Install New Disinfection Storage LS 1 $80,000 $80,000 26 27 High Service Pumping 18 Furnish and Install New High Service Pumping System LS 1 $1,200,000 $1,200,000 28 Electrical and Controls System 29 191 Furnish and Install New Electrical and Controls System LS 1 $6,000,000 $6,000,000 30 201 Furnish and Install New Diesel Generator LS 1 $650,000 $650,000 31 32 Subtotal11 111 Project No. 2 -Construction of WTP No.3 - 3.28 MGD 33 General Conditions 6% 34 1 Mobilization/Demobilization, Bonds, Insurance % 5% Record Drawings and Project Closeout LS 1 $1,709,000 $1,709,000 35 2 $684,000 $684,000 36 Site Work 7% 37 3 Erosion and Sedimentation Control LS 1 $150,000 $150,000 38 4 Grading, Grassing, and Fencing LS 1 $1,500,000 $1,500,000 39 5 Furnish and Install Concrete Driveway and Parking Area LS 1 $50,000 $50,000 40 6 Furnish and Install Yard Piping LS 1 $800,000 $800,000 41 Equip and Connect LFA Wells 18% 42 71 Install and Equip LFA Wells EA 1 2 1 $3,250,000 $6,500,000 43 Ground Storage Tanks 15% 44 81 Furnish and Install 0.75 MG GST EA 1 2 1 $2,700,000 1 $5,400,000 45 Advanced Treatment System 27% 46 91 Furnish and Install Granular Activated Carbon System LS 1 1 $6,000,000 $6,000,000 5 Pressure Vessels 47 101 Furnish and Install Ozonation System LS 1 $4,000,000 $4,000,000 48 Disinfection System 2% 49 11 Furnish and Install Sodium Hypochlorite Storage Tank LS 1 $80,000 $80,000 50 12 Furnish and Install Chemical Feed Pumps LS 1 $200,000 $200,000 51 13 Furnish and Install Disinfection Building SF 600 $500 $300,000 52 High Service Pumps 6% 53 14 Furnish and Install High Service Pumps and Aboveground Piping LS 1 $800,000 $800,000 54 15 Furnish and Install HSP and Controls Building SF 3000 $500 $1,500,000 55 Electrical and Controls System 19% 56 161 Furnish and Install Electrical and Controls System LS 1 1 $6,250,000 1 $6,250,000 57 171 Furnish and Install Diesel Generator and Generator Pad LS 1 1 $650,000 1 $650,000 58�137,000,000 59 Alternative No.2 Project Cost Summary 60 Project No. 2 - Rehabilitate WTP No. 2 Construction Cost Project No. 3 - Construct WTP No. 3 - 3.28 MGD Construction Cost $13,200,000 $37,000,000 61 62 Alternative No. 2 Subtotal $50,200,000 63 SRF Contingency 10% $5,020,000 64 Alternative No. 2 Total Construction Cost $55,220,000 65 SRF Administration 2% 15% $1,105,000 $8,283,000 66 Design/Permitting and Bidding Engineering Services Post Design Technical Services (CEI and CA) 10% $5,522,000 E68 J:\2500699\Civil\Modeling-Calcs-Estimates\Capital & 0&M Cost\Draft to City For Review\City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT - May 2026 Page 3 of 11 Printed On: 5/1/2026 City of Longwood DWSRF Facilities Plan -Alternative Analysis OPC DRAFT- May 2026 -Alternative No. 3 Breakdown CPH Job No. 2500699 A B C D F G H 2 .0 Toro TJ=1JEL Project No. 1- Rehabilitation of WTP No. 1 - 2.44 MGD 3 Item Description Unit Quantity Unit Cost Total Cost Comments 4 General Conditions 5 1 Mobilization/Demobilization, Bonds, Insurance % 5% $610,000 $610,000 5% 6 21 Record Drawings and Project Closeout LS 1 $122,000 $122,000 1% 7 Demolition 3 Erosion and Sedimentation Control LS 1 $120,000 $120,000 8 9 4 Demolish Existing Fluoride Building LS 1 $150,000 $150,000 10 5 Demolish Existing HSP Room and Electrical System LS 1 $300,000 $300,000 11 6 Demolish Existing Disinfection Building and Disinfection System LS 1 $150,000 $150,000 12 13 7 Salvage of Generator and Demolition of Generator Pad Site Work 8 Furnish and Install New Concrete Driveway LS LS 1 1 $50,000 $70,000 $50,000 $70,000 14 15 9 Furnish and Install Temporary HSP and Electrical Controls Facilities LS 1 $1,300,000 $1,300,000 16 10 Furnish and Install Temporary Disinfection Facilities LS 1 $300,000 $300,000 17 11 Furnish and Install New Disinfection Building SF 600 $500 $300,000 18 12 Furnish and Install New High Service Pump Building SF 1300 $500 $650,000 19 13 Furnish and Install New Electrical and Controls Building SF 1300 $500 $650,000 20 141 Furnish and Install Yard Piping LS 1 1 $300,000 1 $300,000 21 Disinfection System 22 151 Furnish and Install New Disinfection Feed Pumps LS 1 1 $200,000 1 $200,000 23 161 Furnish and Install New Disinfection Storage LS 1 1 $80,000 1 $80,000 24 High Service Pumping 25 171 Furnish and Install New High Service Pumping System LS 1 1 $900,000 1 $900,000 26 Electrical and Controls System 27 181 Furnish and Install New Electrical and Controls System LS 1 1 $6,000,000 1 $6,000,000 28 191 Furnish and Install New Diesel Generator LS 1 $650,000 $650,000 29 Subtotal $13,000,000 III Project No. 2 -Rehabilitation IF WTP No. 2 III - 4.60 MGD 3o 31 General Conditions 32 1 Mobilization/Demobilization, Bonds, Insurance % 5% $600,000 $600,000 5% 331 1 2 Record Drawings and Project Closeout LS 1 $120,000 $120,000 1% 34 Demolition 1 3 Erosion and Sedimentation Control LS 1 $100,000 $100,000 351 361 1 4 Demolish Existing Fluoride Building LS 1 $100,000 $100,000 371 1 5 Demolish Existing HSP Room and Electrical System LS 1 $300,000 $300,000 381 1 6 Demolish Existing Disinfection Building and Disinfection System LS 1 $100,000 $100,000 391 1 7 Salvage of Generator and Demolition of Generator Pad LS 1 $50,000 $50,000 401 1 8 Demolish On -Site Well Pump Buildings EA 3 $33,333 $100,000 411 1 91 Demolish Existing Ground Storage Tank EA 1 $500,000 $500,000 42 Site Work 431 1 10 1 Furnish and Install Temporary Disinfection Facilities LS 1 $300,000 $300,000 441 Ill Furnish and Install New Disinfection Building SF 600 $500 $300,000 451 121 Furnish and Install New High Service Pump Building SF 2400 $500 $1,200,000 461 131 Furnish and Install New Electrical and Controls Building SF 1000 $500 $500,000 47 Wells 48 14 Furnish and Install Well Head Piping and Pump Assemblies EA 2 $350,000 $700,000 49 15 Well Pump Test EA 2 $50,000 $100,000 50 Disinfection System 51 161 Furnish and Install New Disinfection Feed Pumps LS 1 $200,000 $200,000 52 171 Furnish and Install New Disinfection Storage LS 1 $80,000 $80,000 53 High Service Pumping 54 181 Furnish and Install New High Service Pumping System LS 1 1 $1,200,000 $1,200,000 55 Electrical and Controls System 56 191 Furnish and Install New Electrical and Controls System Furnish and Install New Diesel Generator LS 1 $6,000,000 $6,000,000 57 201 LS 1 $650,000 $650,000 58 M • W. 11 111 591 Project No. 3 - Construction of WTP No. 3 - 0.84 MGD 60 General Conditions 6% 61 1 Mobilization/Demobilization, Bonds, Insurance % 5% $1,207,000 $1,207,000 62 21 Record Drawings and Project Closeout LS 1 $483,000.00 $483,000.00 63 Site Work 7% 64 3 Erosion and Sedimentation Control LS 1 $150,000 $150,000 651 41 Grading, Grassing, and Fencing LS 1 $1,250,000 $1,250,000 661 51 Furnish and Install Concrete Driveway and Parking Area LS 1 $60,000 $60,000 671 61 Furnish and Install Yard Piping LS 1 $750,000 $750,000 68 Equip and Connect LFA Wells 21% 691 71 Install and Equip LFA Wells EA 2 $3,150,000 $6,300,000 70 1 Ground Storage Tanks 11% 711 1 81 Furnish and Install 0.6 MG GST EA 1 $3,200,000 $3,200,000 72 1 Advanced Treatment System 24% 731 1 91 Furnish and Install Granular Activated Carbon System LS 1 $4,000,000 $4,000,000 3 Pressure Vessels 741 1 101 Furnish and Install Ozonation System LS 1 $3,200,000 $3,200,000 75 1 Disinfection System 2% 761 1 Ill Furnish and Install Sodium Hypochlorite Storage Tank LS 1 $75,000 $75,000 771 121 Furnish and Install Chemical Feed Pumps LS 1 $200,000 $200,000 781 131 Furnish and Install Disinfection Building SF 600 $500 $300,000 79 High Service Pumps 7% 80 14 Furnish and Install High Service Pumps and Aboveground Piping LS 1 $600,000 $600,000 81 151 Furnish and Install HSP and Controls Building SF 2800 $500 $1,400,000 82 Electrical and Controls System 20% 83 161 Furnish and Install Electrical and Controls System LS 1 $5,250,000 $5,250,000 84 17 Furnish and Install Diesel Generator and Generator Pad LS 1 $60 1,000 $600,000 85 Subtotal 1 111 111 Alternative No.3 Project Cost Summary 86 87 Project No. 1- Rehabilitate WTP No. 1 Construction Cost $13,000,000 gg Project No. 2 - Rehabilitate WTP No. 2 Construction Cost $13,200,000 89 Project No. 3 - Construct WTP No. 3 - 0.84 MGD Construction Cost $30,000,000 90 Alternative No. 3 Subtotal $56,200,000 91 SRF Contingency 10% $5,620,000 92 Alternative No. 3 Total Construction Cost 1 $61,820,000 93 SRF Administration 2% $1,237,000 94 Design/Permittign and Bidding Engineering Services 15% $9,273,000 95 Post Design Technical Services (CEI and CA) 10% $6,182,000 96 Alternative No. 3 Total Project Cost $78,512,000 J:\2500699\Civil\Modeling-Calcs-Estimates\Capital & O&M Cost\Draft to City For Review\City of Longwood DWSRF Facilities Plan - Alternative Analysis OPC DRAFT - May 2026 Page 4 of 11 City of Longwood FINAL Drinking Water Facilities Plan APPENDIX D: Preliminary Ecological Assessment City of Longwood Drinking Water Facilities Plan FINAL cph D-1 PRELIMINARY ECOLOGICAL ASSESSMENT REPORT CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN SEMINOLE COUNTY, FLORIDA JULY 2025 Engineers Architects Planners Surveyors Landscape Architects Traffi QTra n spo rta ii o n Environmental Scientists Construction Management Prepared by: CPH Consulting LLC 1117 E. Robinson Street Orlando, Florida 32801 Office: 407-425-0452 Engineer -COA3215 LandscapeArchitect -LCOM298 Architect - AAZ6000926 Surveyor -LM43 PRELIMINARY ECOLOGICAL ASSESSMENT REPORT CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN SEMINOLE COUNTY, FLORIDA JULY 2025 TABLE OF CONTENTS Page 1.0 INTRODUCTION...............................................................................................................................1 2.0 METHODOLOGY..............................................................................................................................2 3.0 EXISTING CONDITIONS..................................................................................................................2 3.1 Soils....................................................................................................................................2 3.2 Vegetation and Land Use Types.........................................................................................3 3.3 Prime Farmland..................................................................................................................5 3.4 Wetlands & Surface Waters................................................................................................5 4.0 REGULATORY CONSIDERATIONS.................................................................................................6 4.1 Florida Department of Environmental Protection.................................................................6 4.2 U.S. Army Corps of Engineers............................................................................................7 5.0 PROTECTED FAUNA AND FLORA..................................................................................................8 5.1 Records Search...................................................................................................................8 5.2 Field Investigation...............................................................................................................8 5.3 Protected Fauna and Flora Regulatory Considerations......................................................9 5.3.1 Migratory Bird Treaty Act..................................................................................10 5.3.2 Bald Eagle........................................................................................................10 5.3.3 Wood Stork Core Foraging Area......................................................................11 5.3.4 Gopher Tortoise...............................................................................................11 5.3.5 USFWS Florida Scrub -jay Consultation Area...................................................12 5.3.6 USFWS Everglades Snail Kite Consultation Area............................................12 6.0 SUMMARY..................................................................................................................................... 13 APPENDICES APPENDIX A — Figures Figure 1 Location Map Figure 2 Soils Map Figures 3A-3C Preliminary Vegetation and Land Use Map Figure 4 Species Map APPENDIX B — Photographs Exhibit B1 Study Area #1 Photograph Location Map Exhibit B2 Photographs Exhibit B3 Study Area #2 Photograph Location Map Exhibit B4 Photographs Exhibit B5 Study Area #3 Photograph Location Map Exhibit B6 Photographs Exhibit B7 Photographs 1.0 INTRODUCTION CPH Consulting, LLC (CPH), Environmental Services, conducted a preliminary ecological assessment of the City of Longwood Florida Department of Environmental Projection (FDEP) State Revolving Fund (SRF) Drinking Water Facility Plan study area on June 25, 2025. The purpose of the City of Longwood Drinking Water Facility Plan improvements is to refurbish the existing West Water Treatment Plant No.2, abandon and demolish the existing Water Treatment Plan No. 1, and construct a new East Water Treatment Plant. The goal of the project is to provide potable water treatment to the community in the City's service area. The project will not have an adverse human health or environmental effects on minority or low-income communities as the project will benefit all within the service area. The subject study areas total approximately 4.24-acres and are located in Sections 32 and 33, Township 20 South, Range 30 East, Seminole County, Florida (Figure 1, Appendix A). The first study area is approximately 0.92 acres at the existing West Water Treatment Plant No.2 located at 870 West Church Avenue Longwood, Florida. The second study area is approximately 0.60 acres at the existing Water Treatment Plant No.1 located at 108 Myrtle Street Longwood, Florida. The third study area is approximately 2.72 acres located northwest of the intersection of East State Road 434 and North U.S. Highway 17192 and south of the Longwood Public Utilities Department. The purpose of this preliminary assessment is to: 1) provide a general estimate of the type and extent of upland habitat types and confirm the approximate extent and configuration of areas expected to fall within the wetland regulatory jurisdiction of the Florida Department of Environmental Protection (FDEP) and U.S. Army Corps of Engineers (ACOE); 2) conduct a public database search for the known or probable geographic distribution of protected species within these habitat types; 3) conduct a preliminary review for protected wildlife and plant species occurrence based on direct observation during the field investigation; 4) assess on -site wetland habitats, if applicable; and 5) identify special environmental designations on, or within proximity to, the subject study area. Vegetation associations and landscape descriptions were identified from aerial photography and field observations, the Soil Conservation Service (SCS) Soil Survey of Seminole County, Florida and ground truthing. There are five (5) vegetation and land use classifications and three (3) soil types mapped within the subject study area. Vegetation and land uses are generally classified following the Florida Land Use, Cover and Forms Classification System (FLUCFCS) (FDOT 1999). 2.0 METHODOLOGY In June 2025, scientists performed pedestrian surveys of the study area for the presence of protected flora and fauna and wetlands and surface waters. Pedestrian transects were sufficient to cover the subject study area. Before the reconnaissance -level survey, a list of potentially occurring protected flora and fauna was compiled based upon on -site habitat types and known or probable geographic distribution of protected species within these habitat types. 3.0 EXISTING SITE CONDITIONS The 4.24-acre study area is divided into three (3) study areas. The study areas are surrounded by urban development consisting of commercial, retail and residential land uses. The subject study areas include existing water treatment plants and undeveloped land in an urban area. 3.1 Soils The Soil Survey of Seminole County, Florida identifies three (3) soil map units within the study area (Figure 2). A summary of the characteristics of these soil types, as described by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS), formerly Soil Conservation Service (SCS) Soil Survey Geographic (SSURGO) database, is as follows: Adamsville — Sparr fine sands The soils in this map unit are level to nearly level and somewhat poorly drained. They are on low ridges on the uplands and on low knolls on the flatwoods. The slopes are dominantly less than 2 percent. A seasonal high water table is within 12 to 36 inches of the surface of Adamsville and Sparr soils for up to 6 months. The permeability of Adamsville soil is rapid. The permeability of Sparr soil is rapid in the surface and subsurface layers and is slow or moderately slow in the subsoil. The available water capacity is low to very low in Adamsville soil, and it is low in the surface and subsurface layers and moderate in the subsoil of Sparr soil. Natural fertility is low in Adamsville and Sparr soils. 2 Tavares — Millhopper fine sands, 0 to 5 percent slopes The soils in this map unit are nearly level to gently sloping and moderately well drained. These soils are on low ridges and knolls on the uplands. The slopes are nearly smooth to slightly convex and range from 0 to 5 percent. The soils in this map unit have a seasonal high water table at a depth of 36 to 60 inches for 2 to 6 months. The permeability of Tavares soil is rapid or very rapid. The permeability of Millhopper soil is rapid in the surface and subsurface layers and moderately slow in the subsoil. The available water capacity is very low in Tavares soils. The available water capacity of Millhopper soil is low in the surface and subsurface layers and moderate in the subsoil. Natural fertility is very low in Tavares soil and low in Millhopper soil. The content of organic matter is very low in Tavares soil and low to moderately low in Millhopper soil. Urban land, 0 to 2 percent slopes This miscellaneous area is covered by urban facilities, such as shopping centers, parking lots, industrial buildings, houses, streets, sidewalks, airports, and related structures. The natural soil cannot be observed. Slopes generally range from 0 to 2 percent. Drainage systems have been established in most areas of Urban land. Depth to the seasonal high water table is dependent upon the functioning of the drainage system. 3.2 Vegetation and Land Use Types Five (5) vegetation and land use classifications are mapped within the subject study area boundaries. Vegetation and land use classifications are generally classified in accordance with the Florida Land Use, Cover and Forms Classification System (FLUCFCS) (FDOT 1999). The following descriptive titles and FLUCFCS numbers assess the study area's vegetation and land uses and are presented on Figures 3A, 3B, and 3C. Select photographs of the subject study area is provided in Appendix B. Commercial and Services (FLUCFCS No. 140) This land use classification describes areas associated with the distribution of products and services. The category includes all secondary structures associated with the enterprise 3 including parking lots, sheds, warehouses, office buildings, and driveways. This land use classification is located within the third study area and is part of the ingress and egress to the City's property. The ingress and egress area is part of the parking lot for the Addition Financial Credit Union and Acme Superstore commercial services located south of the third study area. Vegetation was not observed in these areas as they are existing parking lots. Undeveloped Land within urban areas (FLUCFCS No. 191) This land use classification includes undeveloped land within urban areas that may be in a transitional state and ultimately will be developed. This land use is located within the third study area. Vegetation observed included Bahia grass (Paspalum notatum), cabbage palm (Sabal palmetto), camphor tree (Cinnamomum camphora), beggar ticks (Bidens alba), earpod tree (Enterolobium cyclocarpum), Florida sand spurs (Cenchrus echinatus), Australian pine (Casuarina equisetifolia), Brazilian pepper (Schinus terebinthifolia), live oak (Quercus virginiana), crape myrtle (Lagerstroemia indica), St. Augustine grass (Stenotaphrum secundatum), blackberry (Rubus argutus), laurel oak (Quercus laurifolia), muscadine (Vitis rotundifolia), ragweed (Ambrosia artemisiifolia) and various grasses and weeds. Roads and Highways (FLUCFCS No. 814) This land use classification describes roads and highways used for the movement of people and goods by usage of motor vehicles. This land use classification includes clear zones, ingress and egress areas, landscaped right-of-ways and grassed mediums. The roads and highways are located within the third study area and includes the access road to the Longwood Public Utilities Department. Electrical Power Transmission Lines (FLUCFCS No. 832) This land use classification describes an electrical powerline easement that extends along the west side of the third study area boundary. Vegetation observed included Bahia grass, ragweed and various grasses and weeds. M Water Supply Plants (FLUCFCS No. 833) This land use classification describes the Water Treatment Plant No.1 and West Water Treatment Plant No.2. Vegetation observed included Bahia grass, St. Augustine grass, crape myrtle, queen palm (Syagrus romanzoffiana), bamboo (Bambusa vulgaris), live oak, Florida tasselflower (Emilia fosbergii), frogfruit (Phyla nodiflora), pennywort (Centella sp.), Virginia creeper (Parthenocissus quinquefolia), Mexican clover (Richardia brasiliensis), beggarticks, ragweed and various grasses and weeds. 3.3 Prime Farmland The Farmland Protection Policy Act was enacted in 1981 (P.L. 98-98) to minimize the unnecessary conversion of farmland to nonagricultural uses as a result of federal actions. In addition, the Act seeks to assure that federal programs are administered in a manner that will be compatible with state and local policies and programs that have been developed to protect farmland. The policy of the NRCS is to protect significant agricultural lands from conversions that are irreversible and result in the loss of essential food and environmental resources. The NRCS has developed criteria for assessing the effects of federal actions on converting farmland to other uses, including a Farmland Conversion Impact Rating form AD- 1066 that documents a site -scoring evaluation process to assess its potential agricultural value. The proposed City of Longwood Drinking Water Facility Plan improvements include refurbishing the existing West Water Treatment Plant No.2, abandoning and demolishing the existing Water Treatment Plan No.1, and construction of a new East Water Treatment Plant. The proposed improvements will not adversely affect agricultural lands as the study area is within existing water treatment facilities and urban land surrounded by transportation and commercial land uses. 3.4 Wetlands & Surface Waters According to wetland delineation methodologies outlined in the Corps of Engineers Wetland Delineation Manual (1987), the 2008 Corps Interim Regional Supplement to the Corps Wetland Delineation Manual: Atlantic & Gulf Coastal Plain Region and the State of Florida Unified Wetland Delineation Methodology (Section 62-340, F.A.C.), habitats classified as E wetlands and surface waters were not observed within the subject study area during the field investigation. 4.0 REGULATORY CONSIDERATIONS 4.1 Florida Department of Environmental Protection The FDEP regulates isolated wetlands and those considered within or connected to "Waters of the State" pursuant to Chapter 403 of the Florida Statues, Rules 62-302 and 62-330 of the Florida Administrative Code (F.A.C.). Development activities altering wetlands and/or drainage require a Statewide Environmental Resource Permit (SWERP) from the FDEP. Different SWERP Permits for various activities, General Permits, and exemptions can be found in the State of Florida Environmental Resource Permit Applicant's Handbook, Volume 1. Specific design standards, basin -specific criteria, and procedures can be found in the State of Florida Environmental Resource Permit Applicant's Handbook, Volume II. Habitats classified as wetlands and surface waters were not observed within the subject project area during the field investigation. The U.S. Environmental Protection Agency (EPA) requires coverage under the National Pollutant Discharge Elimination System (NPDES) generic permit for discharge from large and small construction activities for any project that results in the clearing of one or more acres, pursuant to 40 CFR parts 122 and 124 and the Florida Department of Environmental Protection (FDEP), pursuant to rule 62-621.300 (4), F.A.C. The EPA has delegated responsibility to the FDEP to administer the NPDES permits for the State of Florida. In association with this permit, a Stormwater Pollution Prevention Plan (SWPPP), which will be implemented during the project's construction, will also be required. The primary function of the NPDES requirements is to ensure that sediment and erosion are controlled during the project's construction. The NPDES permit typically requires Best Management Practices to ensure compliance with water quality standards. In addition, coverage under the generic permit for the discharge of produced groundwater from a non -contaminated site activity must I be secured for any construction -related dewatering activity pursuant to Rule 62-621.302. The SWPPP should be included in the project engineering design plans. 4.2 U.S. Army Corps of Engineers The ACOE regulates wetlands and other waters under Section 404 of the Clean Water Act (CWA), specifically those that qualify as "Waters of the United States" (WOTUS). Following the U.S. Supreme Court's decision in in Sackett v. EPA, 598 U.S. 651(2023), and as clarified in the March 2025 Memorandum to the Field, the Corps'jurisdiction over wetlands is limited to those that have a continuous surface connection to a relatively permanent body of water that is itself a water of the United States. The 2025 Memorandum clarifies that a "continuous surface connection" means a direct and unbroken surface linkage between a wetland and a relatively permanent waterbody, such that the wetland is indistinguishable from the adjacent water during ordinary conditions. Features such as man-made barriers, berms, or disconnected drainage swales do not meet this standard if they interrupt surface hydrology in a manner that severs the physical connection. As a result of the Sackett decision, wetlands that are adjacent but hydrologically separated from jurisdictional waters —such as those connected only through subsurface flow, intermittent or ephemeral features, or indirect hydrological connections —no longer fall under federal jurisdiction. This interpretation supersedes previous reliance on broader connectivity standards established in Rapanos v. United States, 547 U.S. 715 (2006), and Solid Waste Agency of Northern Cook CountV v. U.S. Army Corps of Engineers (SWANCC), 531 U.S. 159 2001 , which allowed for jurisdiction based on significant nexus or isolated interstate commerce connections. Accordingly, isolated wetlands or wetlands lacking a continuous surface connection to a relatively permanent waterbody are considered non -jurisdictional for purposes of Clean Water Act Section 404 permitting. After a preliminary review of the subject study areas, areas meeting the jurisdictional definition of "Waters of the United States" pursuant to Section 404 of the Clean Water Act were not observed within the subject study area. 7 5.0 PROTECTED FAUNA AND FLORA Preliminary ecological investigations included a review of published and unpublished literature concerning the subject study area and surrounding area, solicitation of databases on protected species, field investigation to generally delineate and characterize the habitats and a preliminary field survey for the occurrence of protected flora and fauna. 5.1 Records Search Prior to the initiation of fieldwork, a records review of documented wildlife observations (Wildlife Occurrence Database System) maintained by the Florida Fish and Wildlife Conservation Commission (FFWCC) was conducted. Other resources used as aids included the following: aerials, Soil Survey of Seminole County, Florida; U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) database, Florida Natural Areas Inventory (FNAI) Biodiversity Matrix database; and Official Lists of Endangered and Potentially Endangered Fauna and Flora in Florida (FFWCC). The records review did not indicate recorded observations or occurrences of protected species within the subject study area (Figure 4). 5.2 Field Investigation CPH biologists conducted field investigations of the subject study areas on June 25, 2025. General reconnaissance of the property was conducted, looking for the occurrence of federal or state -listed flora and fauna and general wildlife utilization. Regulatory oversight for protected fauna and flora is the responsibility of the USFWS, FFWCC, and the Florida Department of Agriculture and Consumer Services (FDACS). The USFWS is the federal agency responsible for protecting the nation's fish and wildlife resources through the implementation of the Endangered Species Act of 1973, as amended ("ESA," 16 U.S.C. 1513-1543). Species (or their signs) protected underthe ESA were not observed within the subject study area during the field investigation. 8 The FFWCC regulates the taking of species listed as endangered, threatened, or of special concern and their nests through Rules listed in 68A-27 Florida Administrative Code. The FFWCC also provides technical assistance to other agencies with regulatory authority over activities that may affect fish and wildlife and their habitat. State -protected species listed under the Rule 68A-27, Florida Administrative Code, were not observed within, or adjacent to, the subject study area during the field investigation. Section 581.185, Florida Statutes and Chapter 513-40, F.A.C., delegates authority to FDACS to designate and regulate plants listed as "endangered," "commercially exploited," and "threatened." It is unlawful for an individual to harvest endangered or commercially exploited plants from the private land of another or any public land without first obtaining written permission from the landowner and a permit from FDACS. It is unlawful for an individual to harvest a threatened plant from private or public land without first obtaining the written permission of the landowner. FDACS-listed endangered and threatened species were not observed within the subject study area during the field investigation. Wildlife utilization is a measure of direct observations or evidence of animals' presence (e.g. scat, tracks, dens, etc.). Potential wildlife utilization was evaluated on food sources, nesting areas, roosting areas, den areas and protective covering. The potential for wildlife utilization of the subject study area is considered low due to their location in an urban area adjacent to heavily trafficked roads and commercial development. During the field investigation, direct observations or signs of wildlife within the study area included eastern gray squirrels (Sciurus carolinensis), American crows (Corvus brachyrhynchos), cats (Felis catus), white ibis (Eudocimus albus) and a northern cardinal (Cardinalis cardinalis). 5.3 Protected Fauna and Flora Regulatory Considerations Below is a discussion of select species or groups of wildlife that frequently affect development sites or can affect a project even though these species are not physically located on the project. 9 5.3.1 Migratory Bird Treaty Act The USFWS also administers and enforces the Migratory Bird Treaty Act (MBTA) of 1918, as amended (16 USC 703-712), which makes it unlawful to pursue, hunt, take, capture, kill or sell birds listed therein ("migratory birds"). The statute does not discriminate between live or dead birds and grants full protection to any bird parts, including feathers, eggs, and nests. A migratory bird is any species or family of birds that live, reproduce, or migrate within or across international borders at some point during their annual life cycle. The current list of birds protected under the MBTA was published in the Federal Register on July 31, 2023, and became effective on August 30, 2023. In total, 1,106 bird species are protected by the MBTA. Several species protected under the MBTA were identified on, or within the vicinity of, the subject study areas during the field investigation. Provided the construction activities do not directly kill or harm birds, their nests or eggs, or cause nest failure due to disturbance, the proposed City of Longwood Water Treatment Plant Facilities Plan project has a low probability of violating the MBTA. 5.3.2 Bald Eagle The Bald and Golden Eagle Protection Act (16 U.S.C. 668-668d) and the regulations derived therefrom (50 CFR 22) state, in part, that no person shall take any bald eagle or any golden eagle, alive or dead, or any part, nest, or egg thereof (with "take" meaning to pursue, shoot, shoot at, poison, wound, kill, capture, trap, collect, molest or disturb). Federal and State laws and regulations make it unlawful to take any listed species (with "take" meaning to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect) or to attempt to engage in any such conduct. According to the Florida Audubon Society Eagle Watch Program database, active nests are not documented as occurring within the subject study area (Figure 4). The closest documented bald eagle nest (Nest SE107) is located approximately 0.45 miles north of the first study area. The presence of this nest will not adversely affect development of the subject study area due to the distance between the nest and the study area. 10 5.3.3 USFWS Wood Stork Core Foraging Area The wood stork (Mycteria americans) is listed as Threatened by the USFWS and the FFWCC. The wood stork is protected under the Endangered Species Act of 1973, as amended, 16 U.S.C. 1531 et seq. and Florida Chapter 68A, Florida Administrative Code. Inundated forested wetlands, cypress strands and domes, mixed hardwood swamps, and sloughs provide nesting habitat. Nest sites are generally in woody vegetation over standing water or on islands surrounded by broad expanses of open water. Shallow freshwater marshes, ponds, flooded pastures, and ditches provide suitable foraging habitat. Wood storks nest in colonies and will return to the same colony site for many years so long as the site and the surrounding foraging habitat continue to supply the needs of the birds. The USFWS has determined the extent of the Core Foraging Area (CFA) as approximately 15 miles, for central Florida counties, from the nesting colony. The subject study areas are located within the CFA of a wood stork colony (Figure 4). During the field investigation, wood stork foraging habitat was not observed within the subject study area. Based on current regulatory guidance, further action to address the wood stork is not a consideration of the three (3) study areas. 5.3.4 Gopher Tortoise The gopher tortoise (Gopherus polyphemus) is listed as a "Threatened" species by the FFWCC and is protected by state law under Chapter 68A-27, Florida Administrative Code. The gopher tortoise is found throughout Florida and is generally associated with longleaf pine and xeric oak sand hills but is also located in scrub, xeric hammock, pine flatwoods, dry prairie, coastal grasslands and dunes, mixed hardwood -pine, and a variety of disturbed habitats. If the gopher tortoise or signs of the tortoise, such as burrows, is observed, their presence must be addressed before on -site construction activities. The FFWCC is the state agency responsible for overseeing the management of this species, including permitting. During the field investigation gopher tortoises, and their signs, were not observed within the three (3) study areas. According to FFWCC regulations, gopher tortoise surveys are valid for 90 days. CPH recommends conducting another gopher tortoise survey at least 90 days before start of construction to determine if gopher tortoise permitting is required. 5.3.5 USFWS Florida Scrub -jay Consultation Area The Florida scrub -jay (Aphelocoma coerulescens coerulescens) is listed as a Threatened species by the USFWS through the Endangered Species Act of 1973, as amended, (16 U.S.C. 1531 et seq.) The USFWS issues a Biological Opinion (BO) for projects and their effects on the threatened Florida scrub -jay in accordance with Section 7 or Section 10 of the Endangered Species Act of 1973, as amended (ESA) (87 stat. 884;16 U.S.C. 1531 et seq.). The BO will spell out the negotiated mitigation measures taken by the property to ensure the listed species is not adversely affected. The study area is located in the USFWS Florida Scrub -jay Consultation Area (Figure 4). If scrub habitat is within '/4 mile of the site, regardless of the type of habitat on the subject project, the USFWS considers the on -site habitat Type III scrub -jay habitat. According to the USFWS database known scrub -jay territory is not in the vicinity of the three (3) study areas (Figure 4). The closest USFWS scrub -jay territory is mapped approximately 3.64 miles east of the third study area. Based upon field observations, scrub -jays and scrub -jay habitat were not observed within, or adjacent to, the subject study area. Based on current regulatory guidance further action to address the Florida scrub -jay is not a consideration for the three (3) study areas. 5.3.6 USFWS Everglade Snail Kite Consultation Area The Everglade snail kite (Rostrhamus sociabilis plumbeus) is listed as Endangered by the USFWS and the FFWCC. The Everglade snail kite is protected under the Endangered Species Act of 1973, as amended, 16 U.S.C. 1531 et seq. Typical Everglade snail kite habitat consists of freshwater marshes and the shallow vegetated edges of lakes (natural and man-made) where apple snails (Pomacea paludosa) can be found. Everglade snail kites require suitable foraging areas that 12 are relatively clear and open to visually search for their specialized diet (apple snails). If suitable habitat is present or snail kites are reported on -site, the survey procedures should be conducted from January to May during the breeding season. The study area is located within the USFWS Everglade Snail Kite Consultation Area (Figure 4). Based upon field observations, the snail kite and snail kite habitat were not observed within, or adjacent, to the subject study area. Based on current regulatory guidance, further action to address the Everglade snail kite is not a consideration of the three (3) study areas. 6.0 SUMMARY The 4.24-acre City of Longwood FDEP SRF Drinking Water Facility Plan study area is located in the City of Longwood, Florida and divided into three (3) study areas. The first study area is the existing West Water Treatment Plant No.2 located at 870 West Church Avenue Longwood, Florida. The second study area is the existing Water Treatment Plant No.1 located at 108 Myrtle Street Longwood, Florida. The third study area is located northwest of the intersection of East State Road 434 and North U.S. Highway 17/92 and south of the Longwood Public Utilities Department. The purpose of the City of Longwood FDEP SRF Drinking Water Facility Plan improvements is to refurbish the existing West Water Treatment Plant No.2, abandon and demolish the existing Water Treatment Plan No.1, and construct a new East Water Treatment Plant. The study area is surrounded by urban development consisting of commercial, retail, transportation and residential land uses. The three (3) study areas include existing water treatment plants and urban land. According to wetland delineation methodologies outlined in the Corps of Engineers Wetland Delineation Manual (1987), the 2008 Corps Interim Regional Supplement to the Corps Wetland Delineation Manual: Atlantic & Gulf Coastal Plain Region and the State of Florida Unified Wetland Delineation Methodology (Section 62-340, F.A.C.) habitats classified as wetlands and surface waters were not observed within the subject study area during the field investigation. Development activities altering wetlands (and surface waters) and/or drainage will require a Statewide Environmental Resource Permit (SWERP) from the FDEP. Different SWERP permits for 13 various actives, General Permits, and exemptions can be found in the State of Florida Environmental Resource Permit Applicant's Handbook, Volume I. Specific design standards, basin -specific criteria, and procedures can be found in the State of Florida Environmental Resource Permit Applicant's Handbook, Volume II. After a preliminary review of the subject study areas, areas meeting the jurisdictional definition of "Waters of the United States" pursuant to Section 404 of the Clean Water Act were not observed within the subject study area. Therefore, permitting with the ACOE is not required for the three (3) study areas. The gopher tortoise is listed as a "Threatened" species by the FFWCC and is protected by state law under Chapter 68A-27, Florida Administrative Code. Tortoises, and their signs, were not observed within, or adjacent to, the three (3) study areas during the June 25, 2025 field investigation. Tortoise surveys are valid for 90 days pursuant to FFWCC regulations. As a preliminary assessment, the findings of this report concerning native vegetation and land use may be subject to change upon more detailed analysis. Additionally, failure to detect a listed species does not necessarily infer species absence as wildlife are mobile, exhibit seasonality of occurrence, and generally have low population levels. Further, nothing in this report regarding environmental laws, rules, and regulations is intended to be a legal interpretation or opinion., Thus, readers of this report should contact an attorney concerning any matters of law. ME APPENDIX A Figures Preliminary Ecological Assessment Report City of Longwood FDEP SRF Drinking Water Facility Plan Seminole County, Florida hecyGluh.I! "el lg LA as s Approximate Project Location Study Area 1 - WTP #2 Parcel #: 31-20-30-300-018A-00 0.92 Acres +1- Exoll}amsan Rd C y� rr ,tateRaad 434 -� Isbnd take Lake n t W Lake Mary Blvd Lake Lon gW nn [! o""' o North Approximate Project Location Study Area 2 - WTP #1 Parcel #:31-20-30-5AU-0000-100A 0.60 Acres +1- Lan E StatwRpad U cc n U, I I Approx. Project Ile Location Irn Coast Fi nd.1 - T--triip Lalkellan"'\ P t penterJintira Inset Map of Project Location WW� A,. 434 Gee Greak "°" r"wy E0 m Casselberry �traI Pkwy Altamonte Springs Approximate Project Location Study Area 3 Parcel #'s:33-20-30-502-3800-0040 . 33-20-30-502-3800-004B a Q 2.72 Acres +1- Q G E �-, Fern Park o 3 � Qranole Rd - a c Lain- Ho--;-11 Mahican ~� A Scale: 1 inch = 1 mile N LOCATION MAP . Date: 12025 FIGURE Photo Date: NIA CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN 1 Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST biologist: CK GIS: ERR)ASEMINOLE COUNTY, FLORIDA Scale: 1 inch = 1,500 feet N I SOILS MAP I Date: 7/2/2025 FIGURE Photo Date: 2024 CITY OF LONGWOOD FDEP SRF ❑RINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR A SEMINOLE COUNTY, FLORIDA a 6f FLUCFCS Code FLUCFCS Classification Approx. Acreage Percent of Site 833 Water Supply Plants 0.92 100,00% Florida Land Use, Cover and Forms Classification System (FDOT,1999) s i� qk oo J 7 4 Y 0 w Approx. Project Boundary • Study Area #1 West WTP #2 Scale: 1 inch = 40 feet N STUDY AREA #1 PRELIMINARY VEGETATION AND LAND USE MAP Date: 7/2/2025 1 FIGURE Photo Date: 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN 3A Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR A SEMINOLE COUNTY, FLORIDA a t _ Approx. Project Boundary Study Area #2 WfP #1 +� TL FLUCFCS Cade FLUCFCS Classification Approx. Acreage Percent of Site 833 Water Supply Plants 0,60 100,00% Florida Land Use. Cover and Forms Classification System (FDOT,1999) Scale: 1 inch = 30 feet N STUDY AREA Q PRELIMINARY VEGETATION AND LAND USE MAP Date: 7/2/2025 FIGURE Photo Date: 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN 3B Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR A SEMINOLE COUNTY, FLORIDA FLUCFCS Code FLUCFCS Classification Approx. Acreage Percent of Site 140 Commercial and Services 0.25 9,19% 191 Undeveloped Land within urban areas 2.08 76.47% 814 Roads and Highways 0.30 11.03% 832 Electrical Power Transmission Lines 0.09 3,31 % ~ " Florida Land Use, Cover and Forms Classification System (FDOT.1999) r-. l C] r I r ' 140 ' � 4 I prp - Approx. Project 4 } Boundary r Study Area #3 } 11 - t• 1 "V"� Scale : 1 inch = 75 feet N STUDY AREA #3 PRELIMINARY VEGETATION AND LAND USE MAP Date: 7/2/2025 FIGURE Photo Date: 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN 3C Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR A SEMINOLE COUNTY, FLORIDA Approx. Project ille Location Paini Cc. a [orida \. W Lake Mary Blvd Q LAkeMary � r lar n; v law o PAAakelas LN 1 ■ 1 Inset Map of Wood StorkQ«i R Hagar` Core Foraging Area Approximate Project Location lam son Rd - _,"nnt! ° Study Area #3 1 'L Longwoo E StatrRaad .� � 43d Gee Grr&k Approximate z Project Location sba nd z 17 i Study Area #1 ake 0 m a Approximate v Project Location o Study Area #2 a �3 e � z � � r Wood Stork Colony (USFWS, 2019) m r Wood Stork Core Foraging Area (USFWS, 2019) M Caracara Nest Sites (USAGE, 2018) Wading Bird Rookeries (FFWCC, 1990) Eagle Nest Locations (Florida Audubon Society, 2024) 7 Least Tern Observation (FFWCC, 2014) Lake Wales Ridge Plants Consultation Area (USFWS, 2003) Crested Caracara Consultation Area (USFWS, 2020) Nate: Project located within the following areas: _ La kF Howell Everglade Snail Kite Consultation Area (USFWS, 2003) Florida Scrub -Jay Consultation Area (USFWS, 2003) r Scale: 1 inch= 1 mile N SPECIES MAP Po Date: FIGURE Photo Date: NIA CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST 4 Biologist: CK GIS: ERR k SEMINOLE COUNTY, FLORIDA APPENDIX B Photographs Preliminary Ecological Assessment Report City of Longwood FDEP SRF Drinking Water Facility Plan Seminole County, Florida FLUCFCS Code FLUCFCS Classification Approx. Acreage Percent of Site 833 Water Supply Plants 0.92 100,00% Florida Land Use, Cover and Forms Classification System (FDOT,1999) s i� q JJ oo 7 i Approximate Photograph Location and Directi❑n Refer to Exhibit B2 for Photographs 0 r Approx. Project Boundary Study Area #1 West WTP #2 Scale: 1 inch = 40 feet N STUDY AREA #1 PHOTO LOCATION MAP Date: 7/2/2025 EXHIBIT Photo Date: 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN B� Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR A SEMINOLE COUNTY, FLORIDA Photograph 91 A - Facing North Photograph #1 C - Facing South Photograph #1 B - Facing East Photograph #1 D - Facing West Refer to Exhibits B1 for photograph location. Scale: NIA PHOTOGRAPHS Date. Photo 1ate:Ju EXHIBIT Photo Date: June 2025 CITY OF LONGWOOD FDEP SRF ❑KINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST B2 Biologist: CK GIS: ERR SEMINOLE COUNTY, FLORIDA FLUCFCS Code FLUCFCS Classification Approx. Acreage Percent of Site 833 Water Supply Plants 0.60 100.00°/o Florida Land Use. Cover and Forms Classification System (FDOT,1999) r�+ Approx. Project Boundary Study Area #2 WfP #1 IIVR 7���Rpefper mate Photograph Location and Direction Exhibits B4 far Photographs66 Scale: 1 inch = 30 feet N STUDYAREA #2 PHOTO LOCATION MAP DatePhoto Date: 25 EXHIBIT Photo Date: 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST B3 Biologist: CK GIS: ERR A. SEMINOLE COUNTY, FLORIDA EMIL-- ..� °i t �� I Photograph #2A - Facing North r.A Photograph 92C - Facing South Photograph #2B - Facing East Photograph #2❑ - Facing West Refer to Exhibits B3 for photograph location. Scale: NIA PHOTOGRAPHS . pate: 2 EXHIBIT DateJune Photo pate: June 2025 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST 64 Biologist: CK GIS: ERR I SEMINOLE COUNTY, FLORIDA a • �s 0 FLUCFCS Code FLUCFCS Classification Approx. Acreage Percent of Site 140 Commercial and Services 0.25 9,19% 191 Undeveloped Land within urban areas 2.08 76.47% 814 Roads and Highways 0.30 11.03% 832 Electrical Power Transmission Lines 0.09 3,31 % Florida Land Use, Cover and Forms Classification System [FOOT-1999] WILI 3 y } fi 191 f 140 146 �t� 8144 i f I �x Approx. Project Boundary CtiuAw Aron fiI ^I P .r WW"o t Approximate Photograph Location and Direction Refer to Exhibits B6-B7 for Photographs 4 _ + Scale: 1 inch = 75 feet N STUDY AREA #3 PHOTO LOCATION MAP Date: 7/2/2025 EXHIBIT Photo Date: 2024 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST B5 Biologist: CK GIS: ERR SEMINOLE COUNTY, FLORIDA Photograph 93A - Facing North d: Photograph 93C - Facing South Photograph #3D - Facing West Photograph #3B - Facing Ea,—. Photograph #4A- Facing North Photograph #4B - Facing East Refer to Exhibits B5 for photograph location. Scale: NIA PHOTOGRAPHS Date. Photo 1ate:Ju EXHIBIT Photo Date: June 2025 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST BG Biologist: CK GIS: ERR SEMINOLE COUNTY, FLORIDA Photograph #4C - Facing South Photograph #4❑ - Facing West Refer to Exhibits B5 for photagraph location. Scale: NIA PHOTOGRAPHS Photo Date: June EXHIBIT Photo Date: June 2025 CITY OF LONGWOOD FDEP SRF DRINKING WATER FACILITY PLAN B7 Project No. 2500699 SECTIONS 32 & 33, TOWNSHIP 20 SOUTH, RANGE 30 EAST Biologist: CK GIS: ERR SEMINOLE COUNTY, FLORIDA City of Longwood FINAL Drinking Water Facilities Plan APPENDIX E: Public Participation a. Copy of Advertisement b. Affidavit of Publication c. Public Participation Presentation and Meeting Minutes City of Longwood Drinking Water Facilities Plan FINAL cph E-1 NOTICE OF PUBLIC MEETING City of Longwood Potable Water Treatment Plant Improvements The City of Longwood hereby gives notice of a public meeting to be held on Thursday, May 28, 2026, from 5:00 p.m. to 6:30 p.m., at the City of Longwood Commission Chambers at 175 West Warren Avenue, Longwood, FL 32750, to provide an oppor- tunity for public participation in the evaluation of the preliminary draft planning document for the design and construction of potable water treatment plant improvements prepared by CPH Consulting, LLC. The preliminary draft planning document outlines the alternatives considered, the antic- ipated financial impacts of the project, and the recommendation to proceed with project design and construction. The document is currently in draft form and remains subject to minor revisions based upon preliminary review comments. All interested parties are invited to attend the public meeting at the date and time identi- fied above. Following a brief presentation, all persons wishing to speak will be provided an opportunity to do so. Copies of the preliminary draft planning document will be available by making a public records request to the City Clerk's Office online at www.longwoodfl.org, calling (407) 260-3441, or emailing clerk@ longwoodfl.org. While available for inspection, the docu- ments should be considered preliminary and subject to change. For additional information or copies of meeting materials, please contact Sandy Schuk- Dukes, Project Manager, at sdukes@longwoodfl.org or (407) 263-2336. Any person requiring special accommodations due to a disability or physical impairment should contact the A.D.A Coordinator, at (407) 260-3466 at least five (5) days prior to the meeting. i islont LONGW 1' i U 1i <1 :l June 1, 2026 To whom it may concern, CITY OF LONGWOOD City Clerk's Department Fostering citizen trust and cultivating a prosperous community This letter serves as certification that the City of Longwood provided public notice for the Public Meeting regarding the Potable Water Treatment Plant Improvements project held on May 28, 2026, at the City of Longwood Commission Chambers, The City of Longwood published the public notice in the following manner: • The Public Notice was advertised on the City's Online Newspaper (Column) on May 141 2026. • The public notice was posted on the official City of Longwood website on May 18, 2026. • The public notice was posted on the City's public notice board located outside Longwood City Hall on May 18, 2026. • A reminder notice regarding the meeting was published through the City's official social media channels on May 27, 2026. These actions were taken to inform the public of the meeting and provide an opportunity for public participation regarding the evaluation of the preliminary draft planning document for the Potable Water Treatment Plant Improvements project. I hereby certify that the foregoing information is true and correct to the best of my knowledge and records maintained by the City of Longwood. Llane Cartagena City Clerk STATE OF FLORIDA COUNTY OF SEMINOLE The foregoing instrument was acknowledged before me by means of ❑physical presence or ❑online notarization, this day of U L , 20?�by �o.nL !'4g2�'►0� who personally known to me or ❑ produced his/her Driver's License as identification and who did/did not take an oath. ;ot+RY�oe�;: NERYS HERNANDEZ SEAL: :_ • � � Notary Public •State o1 Florida '� • �P` Commission ri HH 613551 S . My Comm. Expires Nov 17; 2028 Bonded through National Notary Assn, rotary Public C� My Commission Expires: (( I t ( [ c pZ$ 175 West Warren Avenue .Longwood, Florida 32750 . (407) 260-3440 Voice . (407) 260-3419 Fax www.longwoodfl.or$ Sf-:MINOLtCOUNTY RCI DA[ NrATU C401U AFFIDAVIT OF PUBLICATION Seminole County 1101 East First Street, Sanford, FL 32771 (407) 665-0311 State of Florida, County of Orange, ss: I, Anjana Bhadoriya, of lawful age, being duly sworn upon oath depose and say that I am an agent of Column Software, PBC, duly appointed and authorized agent of the Publisher of Seminole County; that the attached copy of advertisement, being a legal advertisement or public notice in the matter of Public Notice - Water Plant - CPH, was published on the publicly accessible website of Seminole County, hosted by Column Software, PBC on the below dates. Publication Dates: • May 14, 2026 Affiant further says that the website complies with all legal requirements for publication in chapter 50, Florida Statutes. Notice ID: GYzoYzXPNIgDzPnCOKcT Publication Fee: $150.00 Agent (As Authorized Signatory of Column Software, PBC) VERIFICATION State of Florida County of Orange Signed or attested before me on this: Notary Public See Proof on Next Page Public Notice - Water Plant - CPH I Page 1 of 2 NOTICE OF PUBLIC MEETING City of Longwood Potable Water Treatment Plant Improvements The City of Longwood hereby gives notice of a public meeting to be held on Thursday, May 28, 2026, from 5:00 p.m. to 6:30 p.m., at the City of Longwood Commission Chambers at 175 West Warren Avenue, Longwood, FL 32750, to provide an oppor- tunity for public participat icn in the evaluation of the preliminary draft planning document for the design and construction of potable water treatment plant improvements prepared by CPH Consulting, LLC. The preliminary draft gunning document outlines the alternatives considered, the antic- pated financial impacts of the project, and the recommendation to proceed with project design and con strvction.The document is currently in draft form and remains subject to minor revisions based upon preliminary review comments. All interested parties are invited to attend the public meeting at the date and time identi- fied above. Following a brief presentation, all persons wishing to speak will be provided an opportunity to do so. Copies of the preliminary draft planning document will be available by making a public records request to the City Clerk's Office online at www. I o ngwoodfl. o rg, calling (407) 260-3441, or emailing clerk@Eongwoodfl.org. While available for inspection, the docu- ments should be considered preliminary and subject to change. For additional information or copies of meeting materials, please contact Sandy Schuk- Dukes, Project Manager, at sdukes*longwoodfl.org or (407) 263-2336. Any person requiring special accommodations due to a disability or physical impairment should contact the ARA Coordinator, at (407) 260-3466 at least five (5) days prior to the meeting. Public Notice - Water Plant - CPH I Page 2 of 2 C^``\ `• G,� �; i ems,, ZINNIA 0 A� l�yyyy1IMML� Sr CIA f CD , It >r; r� O yr SIMMONS N i-, 0 v m ,v m IN Li III .�- 11111111. it IF _ ` C�,oc f � U, � CAO �i _ tip � =m Ark .—' dolloRtim ty -ems N y r v �0 MIA -h -• r O o �T O v c c� �• CD CD Q'.. MIA N O � N O \�! CD CD O rm#L O N Histo c LONGWOO F I o r 1 d a CITY OF LONGWOOD Fostering citizen trust and cultivating a prosperous community City of Longwood Water Plant Replacement Project — Facilities Plan Meeting 1. Meeting Context • Date: 28 - May - 2026 • Time: 5:00 PM • Format: In -person (City Chambers; with live recording and YouTube broadcast: • https://www.youtube.com/live/wu7MHM8dHSc?si=g84LtlhchOuuwOb6 • Participants: • William Watts; City Manager • Liane Cartagena; City Clerk • Matthew Hockenberry; Deputy Public Wors Director • Jammie Tackett; Utility Manager • Sandy Dukes; Project Manager • Roberto M. Gonzalez, P.E.; CPH Senior Project Manager • Amr Zakey, E.I.; CPH Senior Project Manager • Aiden Karn, E.I.; CPH Project Manager o Public attendees/speakers: Michael Phinning, Joanne Rebello, Melonie Galvon, Judy Putz, Dave Putz, Brian Roy, Lina Mejia, Ricardo Aakron, Lori Rice, Elsie and Johnnie Richardson, Billyand Jenn Barr, and John Hicks • Short Description: The City of Longwood hosted a public forum to present its drinking water facilities plan, a requirement for securing a State Revolving Fund (SRF) loan. Consultants from CPH detailed the need to modernize the city's aging water treatment plants, driven by infrastructure past its useful life, growing demand, and regulatory mandates like the Central Florida Water Initiative (CFWI). The selected strategy involves rehabilitating Plant 2 and constructing a new Plant 3 with wells into the Lower Floridan Aquifer. The meeting addressed the project's technical aspects, timeline, and cost, while also fielding extensive public questions. Residents raised significant concerns about the project's impact on utility rates, affordability for fixed -income households, the transparency of the planning and budgeting process, and the effectiveness of public communication. 2. Introductory Exchange The meeting began with the City Manager welcoming attendees and providing building orientation. An early exchange involved staff clarifying for a resident that the selected site for the new water treatment plant would not require costly retrofitting of main pipes, setting a practical and responsive tone. Another resident opened a line of inquiry regarding historical 907 E. State Road 434 • Longwood, Florida 32750 • (407) 263-2382 • www.longwoodfl.org changes in the city's Capital Infrastructure Plan (CIP) reporting, establishing an analytical and questioning atmosphere from the outset. 3. Meeting Purpose To conduct the SRF-required public presentation of the City's Drinking Water Facilities Plan, covering project needs, alternatives analysis, environmental review, and schedule. The forum also aimed to inform residents about the project's funding strategy (primarily SRF loans), associated utility rate adjustments, and to gather public feedback on affordability, transparency, and communication prior to subsequent City Commission decisions. 4. Main Topics Discussed Topic: Project Need and Regulatory Context o What was discussed: Existing water treatment plants are beyond their useful life (Plant 1 is 55+ years old; Plant 2 is 48+ years old). Projected demand is exceeding 75% of rated capacity, requiring upgrades for storage, pumping, and treatment. A key driver is the Central Florida Water Initiative (CFWI) rule, which limits withdrawals from the Upper Floridan Aquifer beyond 2025, necessitating a shift to the deeper, more costly Lower Floridan Aquifer. New EPA rules also require treatment for contaminants like PFAS and 1,4-dioxane, which has been factored into the design. Tools or approaches considered: Facilities plan analysis, lifecycle assessment, regulatory compliance thresholds (CFWI, EPA), energy efficiency considerations. Pros and concerns raised: Pros include improved reliability, regulatory compliance, and reduced long-term O&M costs. The primary concern is the significant capital investment required. o Consensus or divergence: General agreement on the need for the project; public concerns centered on cost and affordability. Topic: Alternatives Evaluation and Selection o What was discussed: Three alternatives were evaluated: ■ Alt 1: Decommission Plants 1 & 2, build one new large plant (—$90M). • Alt 2 (Selected): Rehabilitate Plant 2, construct a new Plant 3, and decommission Plant 1 separately (—$70M capital). ■ Alt 3: Keep and rehabilitate all three plants. o Tools or approaches considered: Capital cost comparisons, net present worth (NPW) analysis (integrating O&M), and redundancy/reliability analysis. o Pros and concerns raised: Alt 2 was selected for its lower capital cost, regulatory compliance, and ability to maintain system redundancy for fire flow and supply continuity during construction. A resident questioned a discrepancy between cost tables, which was clarified as the difference between capital cost and NPW. o Consensus or divergence: Alternative 2 was confirmed as the selected path. • Topic: Project Components, Timeline, and Costs o What was discussed: The project includes rehabilitating Plant 2 on a tight site, constructing Lower Floridan wells, and building a new Plant 3. The total timeline 907 E. State Road 434 • Longwood, Florida 32750 • (407) 263-2382 • www.longwoodfl.org is estimated at —5 years. Contingency for advanced treatment (e.g., ozone + GAC) is included in planning costs. Significant cost volatility (e.g., PVC prices up 40% since January) and supply chain risks for electrical gear and generators were noted. Tools or approaches considered: Phased project delivery, value engineering (e.g., deferring a storage tank), owner -direct purchasing (ODP) for tax savings, and a state -mandated 10% contingency budget. Pros and concerns raised: The phased approach and contingencies mitigate risk. Residents expressed concern about cost overruns and extended timelines impacting citizens. Consensus or divergence: Consensus on the need for risk management; public concern remains about who ultimately bears the financial risk. • Topic: Funding, Rates, and Affordability o What was discussed: Low -interest SRF loans (-2.74%) are the preferred financing mechanism over more expensive traditional bonds. The city will pursue limited grant opportunities and may use reserves and impact fees. Residents, particularly those on fixed incomes, expressed strong concerns about the affordability of the resulting rate increases. o Tools or approaches considered: SRF loan application, rate study by Raftelis, pursuit of grants. The city is exploring a hardship fund or program for vulnerable residents. o Pros and concerns raised: SRF offers the lowest -cost financing. The primary concern is the significant burden of rate increases on residents. o Consensus or divergence: Consensus on the need for modernization and funding. Divergence on the pace of the project and the adequacy of measures to protect financially vulnerable residents. Topic: Public Communication and Procedural Transparency o What was discussed: Residents reported being unaware of the meeting and criticized the city's reliance on its website, social media, and utility bill inserts, noting that many use auto -pay or lack internet access. Questions were raised about a recommended continuance of the commission vote on rates from June 1st to June 15th, with residents frustrated by the uncertainty. The absence of City Commissioners was also questioned. o Positions of key participants: The City Manager acknowledged communication gaps, committed to improvements, and explained the legal requirement to notice the rate ordinance for the June 1st meeting, meaning only the Commission itself could vote to postpone it. He and the consultant explained it is standard for commissioners not to attend such technical briefings. o Consensus or divergence: Consensus on the need for better, more accessible public outreach. Divergence on the adequacy of current procedures, with residents feeling the process lacks transparency and convenience. • Topic: Technical Planning and Environmental Review o What was discussed: Lower Floridan wells will require a consumptive use permit modification and modeling to assess risks like upcoming and saltwater intrusion; residents questioned reliance on district modeling versus independent analysis. A preliminary ecological assessment found no endangered species or floodplain issues at the proposed sites. 907 E. State Road 434 • Longwood, Florida 32750 • (407) 263-2382 • www.longwoodfl.org o Tools or approaches considered: Well drilling with water quality sampling every —20 ft, hydraulic stress tests (48-72 hours), back -plugging to seal off poor water quality zones, and coordination with the Water Management District. o Consensus or divergence: Agreement on the need for testing and permitting. Divergence on whether district -led modeling is sufficient, with calls for independent verification. Topic: Historical Budgeting and Project Contracting o What was discussed: A resident questioned why freshwater and wastewater capital budgets were combined in the CIP after 2017, suggesting it obscured rising costs. The consultant agreed to investigate. Another resident asked about the contracting method; it was clarified that CPH's current contract is for the study only, and the main project (over $7M) will be publicly bid per state law (C.C.N.A.), with the final contract type (e.g., GMP) to be determined later. o Consensus or divergence: The historical budget question was deferred. The procurement process was clarified. 5. Decisions Made • Alternative 2 (rehabilitate Plant 2; construct new Plant 3 with Lower Floridan wells; decommission Plant 1 separately) was confirmed as the selected facilities approach. • Staff will formally recommend that the City Commission continue the utility rate ordinance vote from June 1, 2026, to June 15, 2026, to allow for further due diligence. • The city intends to use owner -direct purchasing (ODP) for high -value project components to achieve tax savings. • The City Manager committed to improving public information and outreach methods. • Staff will explore the design and implementation of a hardship assistance fund for financially vulnerable residents. 6. Follow -Up Actions • Task: Update the Facilities Plan with public meeting minutes and comments. o Assigned to: CPH & Jammie Tackett; Utility Manager o Deadline: Prior to SRF submission (approx. before June 24, 2026) • Task: Prepare and submit the SRF Request for Inclusion for project design. o Assigned to: City Staff, CPH o Deadline: Before June 24, 2026 • Task: Review past CIP documents (c. 2016-2023) to determine why freshwater and wastewater budgets were combined and report back. o Assigned to: Roberto Gonzalez (CPH) o Deadline: TBD • Task: Develop and present an enhanced public outreach plan with multi -channel, accessible formats. o Assigned to: City Manager, Jammie Tackett and Communications Staff 907 E. State Road 434 • Longwood, Florida 32750 • (407) 263-2382 • www.longwoodfl.org o Deadline: TBD • Task: Design and propose a hardship assistance program for utility customers. o Assigned to: City Manager, Staff o Deadline: TBD • Task: Initiate the consumptive use permit modification process, including groundwater modeling. o Assigned to: CPH, City Staff o Deadline: Before well construction • Task: Prepare options for the disposition of the Water Plant 1 site, considering its historic water tower. o Assigned to: City Manager, Planning/Legal Staff o Deadline: TBD • Task: Clarify the separate funding pathway for the decommissioning of Plant 1. o Assigned to: City Manager/Finance, Public Works o Deadline: TBD 7. Open Questions or Deferred Topics • The specific reason for combining freshwater and wastewater line items in the Capital Infrastructure Plan (CIP) after 2017. • Final decision on the continuance of the commission vote, pending the June 1st meeting. • Whether advanced water treatment will be required, pending well water quality results. • Specific details of the hardship assistance program (eligibility, funding, administration). • The final plan for the disposition or reuse of the Water Plant 1 site. • The extent to which independent groundwater modeling will be used versus relying on Water Management District models. • Final, specific rate increase levels and phasing, pending the Commission's decision. • Detailed project timelines and milestone dates for all phases. 907 E. State Road 434 • Longwood, Florida 32750 • (407) 263-2382 • www.longwoodfl.org REQUEST TO SPEAK DURING PUBLIC PARTICIPATION (Please print) DATE: NAME: >(� / V lC� I el!?1711 ADDRESS: > U� / C'.'� C �% V �� t Cjkll q �.�('A) �);J ' )6 6 (City) (zip) (Phone) REPRESENTING: (Organization) SUBJECT MATTER: HAS THIS TOPIC BEEN DISCUSSED WITH CITY STAFF? YES NO Complete this form if you wish to speak to the City Commission during the Public Participation portion ofthe Meeting on a molter that is not a Public Hearing on the posted Agenda for tonight's meeting. Persons speaking under PUBLIC PARTICIPATION must limit their comments to THREE MINUTES OR LESS. PLEASE GIVE THIS FORM TO THE CITY CLERK BEFORE THE MEETING The Mayor will call you to the microphone at the appropriate time. Subjects shall be reviewed and questions that are not germane to areas of City business under the province of the City Commission will be referred to the City Manager for resolution. Subject matter shall be clear and address a specific issue. The City Attorney, as Parliamentarian, will determine if a subject is not germane. REQUEST TO SPEAK ON POSTED AGENDA ITEMS MAY BE DEFERRED BY THE COMMISSION UNTIL THE AGENDA IS CONSIDERED. All questions and remarks shall be addressed to the Chair and all responses will be from the Chair except when authorized by the Chair. The Chair will permit comments to be addressed to individual Commissioners and allow individual Commissioners to respond to those comments, if they so desire. The Chair may call to order any person granted permission to speak during the Public Participation period that is disorderly by failing to be germane or otherwise disrupting the proceedings. When the Chair has declared a speaker out of order, they shall be seated. If the Person refuses to be seated when declared out of order and/or if the person continues to be disorderly and disrupts the meeting, the Chair may order the person removed from the Commission Chambers for the remainder of the meeting. Actions of the Chair are considered actions of the Commission. Should any member disagree or disapprove of the actions of the Chair that Commissioner may call a point of order and the Commission shall rule on the point of order. THE CITY COMMISSION WILL NOT ATTEMPT TO RESOLVE PROBLEMS DURING A COMMISSION MEETING UNTIL THE MATTER HAS BEEN REFERRED TO THE CITY MANAGER FOR REVIEW AND RECOMMENDATION. [My Documents\FORMS\Request to Speak During PUBLIC PARTICIPATION] UPDATED: 07/01/2020 REQUEST TO SPEAK DURING P (Please print) NAME: ADDRESS: REPRESENTING: (Organization) SUBJECT MATTER: ICIPATION HAS THIS TOPIC BEEN DISCUSSED WITH CITY STAFF a YES NO v Complete this form if you wish to speak to the City Commission during the Public Participation poI•tion ofthe Meeting oar a matter t/int is not a Public Hearing on the posted Agenda for tonight's meeting. Persons speaking under PUBLIC PARTICIPATION must limit their comments to THREE MINUTES OR LESS. PLEASE GIVE THIS FORM TO THE CITY CLERK BEFORE THE MEETING The Mayor will call you to the microphone at the appropriate time. Subjects shall be reviewed and questions that are not germane to areas of City business under the province of the City Commission will be referred to the City Manager for resolution. Subject matter shall be clear and address a specific issue. The City Attorney, as Parliamentarian, will determine if a subject is not germane. REQUEST TO SPEAK ON POSTED AGENDA ITEMS MAY BE DEFERRED BY THE COMMISSION UNTIL THE AGENDA IS CONSIDERED. All questions and remarks shall be addressed to the Chair and all responses will be from the Chair except when authorized by the Chair. The Chair will permit comments to be addressed to individual Commissioners and allow individual Commissioners to respond to those comments, if they so desire. The Chair may call to order any person granted permission to speak during the Public Participation period that is disorderly by failing to be germane or otherwise disrupting the proceedings. When the Chair has declared a speaker out of order, they shall be seated. If the Person refuses to be seated when declared out of order and/or if the person continues to be disorderly and disrupts the meeting, the Chair may order the person removed from the Commission Chambers for the remainder of the meeting. Actions of the Chair are considered actions of the Commission. Should any member disagree or disapprove of the actions of the Chair that Commissioner may call a point of order and the Commission shall rule on the point of order. THE CITY COMMISSION WILL NOT ATTEMPT TO RESOLVE PROBLEMS DURING A COMMISSION MEETING UNTIL THE MATTER HAS BEEN REFERRED TO THE CITY MANAGER FOR REVIEW AND RECOMMENDATION. [M}Documents�F'ORMS\Request to Speak During PUBLIC PARTICIPATION] UPDATED: 07/O1/2020 -D n REQUEST TO SPEAK DURING PUBLIC P (Please print) NAME: ADDREss: (Street) REPRESENTING: SUBJECT MATTER: �VCAn > a 4 T lta p( Keaac (Organization) DATE: (Phone) � a61d6 HAS THIS TOPIC BEEN DISCUSSED WITH CITY STAFF? YES NO Complete this form if you wish to speak to the City Commission during the Public Participation portion of the Meeting on a »tatter t/tnt is not a Public Hearing on the posted Agenda for tonight's rneeting. Persons speaking under PUBLIC PARTICIPATION must limit their comments to THREE MINUTES OR LESS. PLEASE GIVE THIS FORM TO THE CITY CLERK BEFORE THE MEETING The Mayor will call you to the microphone at the appropriate time. Subjects shall be reviewed and questions that are not germane to areas of City business under the province of the City Commission will be referred to the City Manager for resolution. Subject matter shall be clear and address a specific issue. The City Attorney, as Parliamentarian, will determine if a subject is not germane. REQUEST TO SPEAK ON POSTED AGENDA ITEMS MAY BE DEFERRED BY THE COMMISSION UNTIL THE AGENDA IS CONSIDERED. All questions and remarks shall be addressed to the Chair and all responses will be from the Chair except when authorized by the Chair. The Chair will permit comments to be addressed to individual Commissioners and allow individual Commissioners to respond to those comments, if they so desire. The Chair may call to order any person granted permission to speak during the Public Participation period that is disorderly by failing to be germane or otherwise disrupting the proceedings. When the Chair has declared a speaker out of order, they shall be seated. If the Person refuses to be seated when declared out of order and/or if the person continues to be disorderly and disrupts the meeting, the Chair may order the person removed from the Commission Chambers for the remainder of the meeting. Actions of the Chair are considered actions of the Commission. Should any member disagree or disapprove of the actions of the Chair that Commissioner may call a point of order and the Commission shall rule on the point of order. THE CITY COMMISSION WILL NOT ATTEMPT TO RESOLVE PROBLEMS DURING A COMMISSION MEETING UNTIL THE MATTER HAS BEEN REFERRED TO THE CITY MANAGER FOR REVIEW AND RECOMMENDATION. [My Documents\FORMS\Request to Speak During PUBLIC PARTICIPATION] UPDATED: 07/O1/2020 City of Longwood Historic LONGwooD F I o r l d a Water Treatment Plant Improvements DWSRF Facility Plan Public Review Date: May 28th, 2026 Presented By: Roberto M. Gonzalez, P.E. Introductions William Watts Liane Cartaaena Matthew Hockenber Jammie Tackett Sandy Dukes Sean Callaahan ?rto M. Gonzalez, P.E. Amr Zaky, PhD Aidan Karn, E.I. City Manager City of Longwood City Clerk City of Longwood Public Works Deputy Director City of Longwood Utility Manager City of Longwood Project Manager City of Longwood Lead Water Plant Operator City of Longwood Senior Project Manager CPH Consulting Senior Project Manager CPH Consulting Project Engineer CPH Consulting mo 2 Purpose of Public Meeting I. Project Needs II. Review Alternatives (No. 1, No. 2, and No. 3) III. Environmental Impacts IV. Review Tentative Project Schedule • Existing infrastructure past useful life. • Water demand projections exceed 75% of WTP rated capacity. • Central Florida Water Initiative (CFWI) rule limits Upper Floridan Aquifer (UFA) groundwater withdrawals beyond 2025. • Improvements provide access to Lower Floridan Aquifer (LFA) as an Alternative Water Supply (AWS) source. q, 4 cph Typical WTP Life Cycle - Existing WTPs Are Beyond Useful Life • Warranty period 0-10 Years • Minimal failures • Routine PM focus Increased maintenance costs 10-20 Years • VFD/control upgrades • Pump rebuilds begin • Major rehabilitation period 20-30 Years • Motor replacements • Tank recoating • Generator evaluation • Significant capital planning 30-50 Years • Structural rehabilitation • Technology modernization • Full replacement planning 50-75+ Years • Well rehabilitation/re-drilling • Major treatment process upgrades WTP No. 1 age: +/- 55 Years WTP No. 2 age: +/- 48 Years cph 5 Three (3) Alternatives Evaluated - Alt. 2 selected Alternative No. 1 One (1) WTP • Decommission WTP No. 1 • Decommission WTP No. 2 • Construct New WTP No. 3 with 7.88 MGD Capacity ➢ Total Capital Cost: $869085,000 Alternative No. 2 Two (2) WTPs • Rehabilitate WTP No. 2 • Construct New WTP No. 3 with 3.28 MGD Capacity ➢ Total Capital Cost: $7091309000 Alternative No. 2 provides: • Redundancy • AW S Source • Lowest Cost Alternative No. 3 Three (3) WTPs • Rehabilitate WTP No. 1 • Rehabilitate WTP No. 2 • Construct New WTP No. 3 with 0.84 MGD Capacity ➢ Total Capital Cost: $789512,000 ' cph Project No,, 1 - Rehab of WTP No. 2 • Demolish existing buildings, ground storage tank 3, and generator pad. • Install new operations building. • Install new disinfection room. • Install new well head assemblies. • Install new disinfection system. • Construct new high service pumping system. • Construct new electrical controls system. M 7 Project No,, 2 - Permit and Construction of WTP No,, 3 • Site work including grading and stormwater systems • Permit and Construct two (2) new LFA wells • Construct two (2) ground storage tanks • Construct advanced treatment systems • Construct disinfection system • Construct high service pumping system with connection to PWS. • Construct electrical and controls system with backup generator. M 8 No Apparent Environmental Impacts' Preliminary Ecological Assessment - No Impacts • Field Investigation conducted on June 25, 2025. • No protected species observed within project areas at time of investigation. • No significant environmental impacts. • Project sites are located outside of 100-Year and 500-Year flood impact planes. Anticipated Schedule - 5 Years .. .. .. NO. 3 LFA WELLS Task Activity Date Prepare and Submit Facilities Plans to FDEP for 1 Design Loan (45 days prior to FDEP Priority June 28, 2026 Meeting) 2FDEP Priority Meeting to Receive Design Loan August 12, 2026 3Execute Design Loan October2026 4Solicit Engineers for Design Services per CNA 3 Months 5Begin Design/Permitting January2027 Submit Readiness to Proceed Documents to 6FDEP for Construction Loan (45 days prior to FDEP Priority Meeting) March 2028 7FDEP Priority Meeting to Receive Construction Loan Construction Loan 9WTP No. 2 Rehabilitation Start -Up May2028 Ma 2028 July 2028 August 2028 10Construction Period 12 months 11 Phase No. 1 Close-out August 2029 Completion 5Construction Loan (45 days prior to FDEP Priority Meeting) 6FDEP Priority Meeting to Receive Construction Loan 7Execution of Construction Loan 9Construction Period 10Estimated Proiect Closeout M 10 Thank you Questions/Comments Contact: Roberto Gonzalez, P.E. raonza lez(a)cphcorp.com 407-425-0452 City of Longwood FINAL Drinking Water Facilities Plan APPENDIX F: DRAFT Adoption Resolution City of Longwood Drinking Water Facilities Plan FINAL cph F-1 RESOLUTION NO.26-1722 A RESOLUTION OF CITY OF LONGWOOD, FLORIDA, AUTHORIZING THE CITY MANAGER TO APPLY FOR A LOAN UNDER THE STATE REVOLVING FUND LOAN PROGRAM TO PARTIAL FUND THE WATER TREATMENT PLANT PROJECT AND THE COST OF DEBT ISSUANCE AND IF SUCH LOAN APPLICATION IS APPROVED, REQUIRING CITY COMMISSION APPROVAL BY ORDINANCE PRIOR TO EXECUTION AND DELIVERY OF THE LOAN AGREEMENT, NOTE AND RELATED CLOSING DOCUMENTS; SUCH LOAN WOULD PLEDGE UTILITY SYSTEM REVENUES AND SHALL NOT PLEDGE AD VALOREM TAXES OR BE A GENERAL OBLIGATION DEBT; ADOPTING A DRINKING WATER FACILITIES PLAN; PROVIDING FOR CONFLICTS, SEVERABILITY, AND AN EFFECTIVE DATE. WHEREAS, Florida Statutes provide for loans to local government agencies to finance the construction of wastewater treatment facilities; and WHEREAS, Florida Administrative Code rules require authorization to apply for loans, to establish pledged revenues, to designate an authorized representative; to provide assurances of compliance with loan program requirements; and WHEREAS; the City of Longwood, Florida, desires for its City Manager to apply and seek approval for a loan agreement from the State of Florida Department of Environmental Protection under the State Revolving Fund Program for financing design, permitting and construction of Water Treatment Plant Project (the "WTP Project"); and WHEREAS, if the loan application is approved, final approval of the loan agreement, note and relating closing documents must come back to the City Commission for final approval via ordinance approved by at least four of the five City Commissioners. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LONGWOOD, FLORIDA, AS FOLLOWS: SECTION I. Recitals. The foregoing findings are incorporated herein by reference and made a part hereof. SECTION II. Loan Application Authorization. The City Commission of City of Longwood, Florida, hereby authorizes its City Manager to apply for and seek approval from the State of Florida Department of Environmental Protection under the State Revolving Fund Program to finance the design, permitting and construction of the WTP Project and for the cost of issuance of such debt. The City Manager is hereby designated as the authorized representative for the City of Longwood to provide the assurances and commitments required by the loan application, subject to final approval of the loan by the City Commission as set forth in this Resolution. Further, the City Manager is hereby given the authority to move forward with the preparation of Page 1 of 3 the preliminary planning documents and other documents needed to secure a loan under the State Revolving Fund Program to fund the WTP Project and to cover the cost of issuance of such debt. This Resolution does not authorize the approval of any loan agreement, note or any other closing document in the event the loan application is approved. Thus, if the loan application is approved, the loan must come back to the City Commission for final approval via ordinance before a loan agreement, note and relating closing documents can be approved, executed and delivered. SECTION III. Revenues Pledged/Not General Obligation. The revenues pledged for the repayment of the intended loan under the State Revolving Fund are the City's net water and sewer system revenues after payment of debt service. The loan agreement and note shall not be a general obligation debt of the City of Longwood. The loan agreement and note, when delivered by the City of Longwood pursuant to the terms of the loan agreement and authorizing ordinance, shall not be or constitute an indebtedness of the City of Longwood within the meaning of any constitutional or statutory limitation of indebtedness, but shall be payable solely from the pledged revenues as to be provided in the loan agreement and authorizing ordinance. The loan agreement and note shall not pledge ad valorem tax revenues or permit or constitute a mortgage or lien upon any assets owned by the City of Longwood, including, but not limited to, the WTP Project and the City's water and sewer system. The noteholder shall never have the right to compel the exercise of the ad valorem taxing power of the City or the State, or taxation in any form of any property to pay the note or the interest thereon. SECTION IV. Drinking Water Facilities Plan Adoption. The City hereby adopts the DRINKING WATER FACILITIES PLAN - City of Longwood WTP Improvements dated June 2026 prepared by CPH Consulting, LLC attached hereto. SECTION V. Authority. The legal authority for the City borrowing money to construct the WTP Project is pursuant to its home rule authority under Article VII, Section 2 of the Constitution of the State of Florida and Chapter 166, Part II, Florida Statutes and Chapter 180, Florida Statutes and pursuant to the City of Longwood Charter. However, this Resolution does not authorize the borrowing of money, just authorizing the filing of an application seeking loan approval. SECTION VI. Conflicts. All resolutions or part of resolutions in conflict with any of the provisions of this Resolution are hereby repealed. SECTION VII. Severability. If any section or portion of a section of this Resolution proves to be invalid, unlawful, or unconstitutional, it shall not be held to invalidate or impair the validity, force, or effect of any other section or part of this Resolution. SECTION VIII. Effective Date. This Resolution shall become effective immediately upon its passage and adoption. PASSED and ADOPTED this Day of , 2026. Page 2 of 3 ATTEST City Commission of the City of Longwood Liane Cartagena, City Clerk Tony Boni, Mayor Approved as to form and legality for the City of Longwood's reliance only. Daniel W. Langley, City Attorney sAdl\clients\longwood, city oflgeneral 1324-21313\drinking water facilities plan\resolution no. 26 wtp srf loan 64-2026.doc Page 3 of 3 City of Longwood FINAL Drinking Water Facilities Plan APPENDIX G: Request for Inclusion City of Longwood Drinking Water Facilities Plan FINAL cph G-1 Florida Department of Environmental Protection REQUEST FOR INCLUSION ON THE DRINKING WATER PRIORITY LIST Drinking Water State Revolving Fund Program Douglas Building, 3900 Commonwealth Blvd, Tallahassee, Florida 32399-3000 The information in this Request for Inclusion (RFI) application is used to determine project eligibility and priority scoring. The priority score is used to rank projects for placement on the State Revolving Fund (SRF) priority list. Only projects placed on the fundable portion of the priority list receive consideration for a loan. Please note that costs incurred before the adoption of the project on the fundable or waiting portion of the priority list are not eligible for reimbursement. 1. Applicant's Name and Address. Project Sponsor: City of Longwood Contact Person: Jammle Tackett Title: Utilities Manager 175 W Warren Avenue (street address) Longwood Seminole 32750 (city) (county) (zip code) 407-263-2384 jtackett@longwoodfl.org (telephone) (ext.) (e-mail) Contact Person Address (if different): (street address) (city) (state) (zip code) 2. Name and Address of Applicant's Consultant (if any). CPH Consulting, LLC Roberto M. Gonzalez, P.E. Senior Project Manager Firm: g, Contact Person: Title: 1117 E. Robinson Street (street address) Orlando 32801 (city) (zip code) 407-322-6841 rgonzalez@cphcorp.com (telephone) (ext.) (e-mail) 3. Type of Loan Requested in this Application. (select only one loan category and project type) Planning Loan ❑ Design Loan ❑ I Planning and Design Loan 0 Construction Loan ❑ Project Type: Design/Bid/Build ❑■ Design/Build (DB) ❑ Construction Manager at Risk (CMR) ❑ Note: Procurement of professional services must meet the requirements of the Consultants' Competitive Negotiation Act, Section 287.055, F.S. Elizibility for a Loan. In order to be considered for a priority listing, the following conditions must be met: • The respondent to this solicitation must qualify as a "project sponsor" as defined in subsection 62-552.200(27), F.A.C. • The minimum construction loan amount is $75,000. • The project sponsor must agree to submit biddable plans and specifications within 1-year after execution of the loan agreement to qualify for a combined planning and design loan. • The project is part of a public water system as defined in subsection 62-552.200(28), F.A.C., and may include drinking water supply, storage, transmission, treatment, disinfection, distribution, residuals management, and appurtenant facilities. Form RFI-DWI Incorporated in subsection 62-552.200 (29), F.A.C. Pagel of 4 Effective March 9, 2022 REQUEST FOR INCLUSION ON THE DRINKING WATER PRIORITY LIST 4. Median Household Income, Population and Principal Forgiveness Percentage (PF%). (complete a. through e. below) a. Median household income (MHI): $78,548 (current U.S. Census data or verifiable estimates) b. State median household income (SMHI): 74,568 (current U.S. Census data) c. Population (P) served 13,865 = number of service connections 5546 times 2.5 persons per connection to include proposed connections. d. Is the project sponsor applying for a planning and/or design loan with principal forgiveness? Yes ❑ No ❑■ . If yes, then PF is 50%. Only a sponsor that qualifies as a financially disadvantaged small community is eligible for a planning/design loan with PF. e. Is the project sponsor applying for a construction loan with principal forgiveness? Yes ❑ No ❑■ . If yes, then PF% is calculated using the formula: PF% = 176019 —160 x (MHI/SMHI) — 714500 x P. Calculate PF% for a construction loan using the above formula: (minimum 20% and maximum 90%). If the sponsor is connecting a financially disadvantaged small community as defined below, a maximum 50% PF is available. Please note that the calculated PF% is an estimate and the actual percentage will be determined by the Department. The amount of loan available with principal forgiveness for a project is dependent upon the amount of funds allocated for the fiscal year. Elikibility for a loan with principal forgiveness. In order to be considered for a loan with principal forgiveness, the following conditions must be met: • The project sponsor must qualify as a financially disadvantaged small community public water system as defined in Rule 62- 552.200, F.A.C., unless the sponsor is specifically exempted from this requirement. • The median household income (MHI) of the sponsor's service area must be less than the state median household income (SMHI) as reported from the current U.S. Census data or from verifiable estimates, unless the sponsor is specifically exempted from this requirement. • The population (P) of the sponsor's service area must be less than 10,000 (to include the population from the project's proposed future connections), unless the sponsor is specifically exempted from this requirement. • The project sponsor is allowed only one open loan with principal forgiveness. A loan is deemed open until the final disbursement of the project has been paid by the department. • A project sponsor is eligible for a construction loan with principal forgiveness (maximum 50%) if connecting a community with less than 250 residential wells; an existing public water system with less than 250 service connections; or a separate, non - interconnected public water system owned by the sponsor. The project area must qualify as a financially disadvantaged small community. • A financially disadvantaged community with a population of 10,000 or more is eligible for a construction loan with 20% principal forgiveness if dollars are available after funding all eligible financially disadvantaged small communities. • A project sponsor that is a for -profit entity is not eligible for principal forgiveness. • A construction project for a financially disadvantaged small community that uses a Construction Manager at Risk delivery method is ineligible for principal forgiveness. 5. Interest Rate Percentage. The interest rate for a loan with the Department is determined using the following formula: % of MR = 40 x (MHI/SMHI) + 15 Calculate and enter the % of MR below: % of MR for a loan: 57.13 % of MR — Percentage of Market Rate. (35% < % of MR < 75%) Please note that the calculated % of MR is an estimate and the actual interest rate will be determined by the Department. The interest rate for a loan shall not be less than 0.2 percent. 6. Base Priority Score. Each project shall receive a base priority score (BPS) dependent on the weighted average of its components. The BPS shall be determined using the below formula where CPS means the component priority score and CCC means component construction cost. BPS = [CPSI x CCCi + ... + CPS, x CCCVITotal Construction Cost Select each component and component score in Table 1 below that apply to the project, enter the estimated construction costs, and calculate the base priority score. • Component priority scores that are based on contaminant levels must be justified by sample analytical data (see exception in notes at bottom of Table 1). The date of sample collection must be less than 24-months from the submittal date of the Request for Inclusion. • The project sponsor must provide documentation demonstrating that contaminant levels (e.g. disinfection byproducts) cannot be reduced by adjusting system operations, if applicable. Form RFI-DWI Incorporated in subsection 62-552.200 (29), F.A.C. Page 2 of 4 Effective March 9, 2022 REQUEST FOR INCLUSION ON THE DRINKING WATER PRIORITY LIST • A compliance-1 category component score of 400 points, if selected in Table 1, must be supported by documentation demonstrating the need for the project; otherwise, a component score of 300 points shall be assigned. Table I Project Component (select all components that apply) Acute Public Health Risk ❑ la. E-Coli or Fecal Coliform Exceed MCL (62-550.310(5), F.A.C.) ❑ lb. Nitrate, Nitrite, or Total Nitrogen Exceed MCL (62-550.3100), F.A.C., Table 1) ❑ lc. Lead or Copper Exceed Action Level (62-550.800, F.A.C) ❑ ld. Surface Water Filtration/Disinfection Noncompliance (62-550.817(2), F.A.C.) Potential Acute Public Health Risk ❑ 2a. Nitrate, Nitrite, or Total Nitrogen 50% of MCL (62-550.3100), F.A.C., Table 1) ❑ 2b. Microbiologicals Exceed MCL (62-550.310(5), F.A.C.) ❑ 2c. Surface Water Enhanced Filtration/Disinfection Noncompliance (62-550.817(3), F.A.C.) ❑ 2d. State Health Certification of Acute Health Risk, Unregulated Microbiological Contaminant ❑ 2e. Violation of Disinfection Requirements (62-555.320(12), F.A.C.) Chronic Public Health Risk ❑ 3a. Inorganic/Organic Contaminant Exceed MCL (62-550.3100) & (4), F.A.C., Tables 1,4,5) ❑ 3b. Disinfection Byproducts Exceed MCL (62-550.310(3), F.A.C., Table 3) ❑ 3c. Radionuclides Exceed MCL (62-550.310(6), F.A.C) Potential Chronic Public Health Risk ❑ 4a. Inorganic/Organic Contaminant 50% of MCL (62-550.310(l) & (4), F.A.C., Tables 1,4,5) ❑ 4b. Disinfection Byproducts 80% of MCL (62-550.310(3), F.A.C., Table 3) ❑ 4c. State Health Certification of Chronic Health Risk, Unregulated Chemical Contaminant Compliance-1 Projects (documentation must be attached or default to Compliance-2 score) 0 5a. Infrastructure upgrades to facilities undersized, exceed useful life, or with equipment failures ❑ 5b. Insufficient water supply source, treatment capacity, or storage ❑ 5c. Water distribution system pressure less than 20 psi ❑ 5d. Eliminate dead ends and provide adequate looping in a distribution system ❑ 5e. Replace distribution mains to correct continual leaks, ppe breaks, and water outages ❑ 5f. New water system or extension of existing system to replace contaminated or low yield wells ❑ 52. Lack of significant safety measures (e.g. chemical containment) ❑ 5h. Secondary Contaminant MCL Exceedance (62-550.320, F.A.C.) ❑ 5i. Drinking water supply project as defined in 403.8532(9)(a), F.S. Compliance-2 Projects Component Component Priority Score Construction Cost 800 points ElN/A 700 points ElN/A I� 600 points ElN/A 500 points ElN/A 400 points 0 ❑ 6a. Treatment, Storage, Power, and Distribution Requirements (62-555.320, F.A.C) 300 points ❑ ❑ 6b. Minimum Required Number of Wells (62-555.315(2), F.A.C) ❑ 6c. Well Set -back and Construction Requirements (62-555.312 and 62-555.315, F.A.C) ❑ 6d. Cross -Connection Control Requirements (62-555.360, F.A.C) ❑ 6e. Physical Security Project Documented in a Vulnerability Analysis ❑ 6L Consolidation or regionalization of public water systems ❑ 62. Water or Energy Conservation Project Ni 0 7. All Other Projects (including land or public water system acquisition projects) 100 points ❑ 46,950,000 N /A Note: Item 2d. and 4c. of Table 1 requires a State Health Officer to complete the form "Certification of a Public Health Risk". If 50% or more of wells meet contaminant levels from Table 1 above, then select the appropriate health risk category in Table 1. Flooded wells and wells under the direct influence of surface water are considered an unregulated microbiological potential acute public health risk and require documentation of occurrence in lieu of sampling data. 7. Affordability Score. The extent of affordability existing in a small community to be served by the project shall be reflected in the priority score. Points shall be awarded based upon two affordability criteria: median household income (MHI) and population (P) served. These points are to be added to the base priority score. Calculate the affordability score using the following formulas: Affordability Score = (MHI Score + Population Score) MHI Score = 100 x (1. 00 - MHIISMHI), zero < MHI score < 75, rounded to nearest whole number Population Score = 50.0 - (P/200), population score > zero, rounded to nearest whole number Form RFI-DWI Incorporated in subsection 62-552.200 (29), F.A.C. Page 3 of 4 Effective March 9, 2022 REQUEST FOR INCLUSION ON THE DRINKING WATER PRIORITY LIST 8. Water Conservation Score. A project sponsor with a qualifying water conservation project is eligible to receive an additional 100 points added to their base priority score if the sponsor provides a water conservation plan in accordance with EPA's Water Conservation Plan Guidelines document number EPA-832-D-98-001, August 6, 1998. 9. Total Priority Score. Total priority score equals the base priority score plus the affordability score. (complete a. through d. below) a. Base priority score: 400 b. Affordability score: c. Water Conservation score d. Total priority score: pomts. N/A points > zero). N/A points. 400 points (sum of items a. and c.) 10. Estimated Project Cost. (complete a. through i. below) (enter $0 if activity is not applicable) Project Activity a. Planning. b. Design (not applicable if a D/B project). C. Eligible land (necessary land divided by total land times purchase price). d. Constr., equip., material, demo. & related procurement (include design if D/B project). e. Construction contingency (10% of `d', only applicable for Design/Bid/Build projects). £ Technical services during construction and after bid opening. g. Asset management plan per 62-552.700(7), F.A.C. h. Total proiect costs (sum of a. through g.). i. Loan amount requested by the sponsor in this RFI (assume no principal forgiveness). List all funding sources (including grants for this project): FDEP DWSRF 11. Project Schedule. (complete a. through d. below) Cost $3,575,000 $8,283,000 $0 $46,950,000 $4,695,000 $6,627,000 $0 70,130,000 70,130,000 Proiect Activity (M/D/YY) a. Submit planning documents. June 28, 2026 b. Submit designibid documents or RFQ/RFP for CMR & D/B projects. March 24, 2028 C. Start construction. August 24, 2028 d. Complete construction. August 24, 2029 12. Project Information. Provide the following information, if applicable. (select all items below that are attached to this RFI) ❑■ Project description, location with lat/long (degrees), water system PWS ID, and project need (this is a required attachment). ❑■ Map of city and county limits, existing and proposed service area, and project area (this is a required attachment). ❑ Lab data, lab data with operational records, or substantiated documentation in lieu of lab data for public health risk projects. ❑ Certification of a Public Health Risk form completed by a State Health Officer. ❑ Supporting documentation for projects identified under the Compliance-1 project categories from Table 1 above. ❑ Project schedule showing plans and specs completion within 1-year of the execution date of a planning/design loan. ❑ Supporting documentation if MHI not taken from current U.S. Census data. ❑ Water Conservation Plan in accordance with EPA guidelines. 13. Certification by an Authorized Representative. I certify that this form and attachments have been completed by me or at my direction and that the information presented herein is, to the best of my knowledge, accurate and true. (signature) (print name) (date) (e-mail) (print title) Email the completed RFI form with attachments to SRFRFI(a�FloridaDEP.gov or mail to the Florida Department of Environmental Protection, State Revolving Fund Program, 3900 Commonwealth Blvd, Tallahassee, Florida 32399-3000. Form RFI-DWI Incorporated in subsection 62-552.200 (29), F.A.C. Page 4 of 4 Effective March 9, 2022 City of Longwood FINAL Drinking Water Facilities Plan Appendix H: DRAFT Business Plan City of Longwood Drinking Water Facilities Plan FINAL cph H-1 DRINKING WATER STATE REVOLVING FUND BUSINESS PLAN Sponsor Name: DWSRF Project #: City of Longwood System Population: Contact Person and Title: Jammie Tackett — Utilities Manager Mailing Address: 175 W. Warren Avenue Contact for Finance Plan (if different): Mailing Address: PWS ID#: 3590202 Telephone: City: Longwood State: FL City: 16,974 407-263-2384 Zip: 32750 Telephone: State: Zip: e-mail: jtackettAlongwoodfl.org Fax: Source Type: ® Ground Water ❑ Purchase Water ❑ Surface Water ❑ Surface/Ground Combined The Drinking Water State Revolving Fund Program (DWSRF), authorized by the 1996 amendments to the Safe Drinking Water Act, provides financial assistance to public water systems (PWS). To obtain this assistance, project sponsors must demonstrate Capacity Development or demonstrate how the assistance will ensure these requirements are met. The term Capacity Development takes into consideration three vital areas of a public water system: Technical, Managerial, and Financial capabilities. FINANCIAL A financial capability demonstration (and certification) is required well before the evaluation of the actual loan or grant application. This demonstration is necessary to ensure that the system has the financial capability to repay the loan, if applicable, and to adequately operate and maintain the system. Financial capability also includes funding future capital improvements that may be required. Please see Rule 62-552.700(4) in Chapter 62-552, F.A.C. for further details. It is expected that the revenues to be dedicated to repaying a loan will be generated either from water and sewer utility operations or from water utility operations alone. If the source of revenues will not be from such enterprises, this set of worksheets alone will not satisfy the Department's needs. (Please contact the Department for further guidance if dedicated revenues will be generated externally to such utilities.) The following worksheets have been developed to identify the minimum information needed. The completed worksheets should be used in disclosing DWSRF project financing to the public during the required dedicated revenue hearing. The worksheets can serve to identify the impacts of the SRF project on residential users and how the project fits into the project sponsor's overall capital improvement program for the water and sewer utility (or water utility, as appropriate). Supplemental capital financing documentation may be submitted with these worksheets and may be presented at the required dedicated revenue hearing. The revenues being dedicated to repayment of the DWSRF loan are: Water and Sewer What is the frequency of waters stem billing? Monthly How often are system rates reviewed for adequacy? Annually When was the last time rates were reviewed? 2026 What resources and guidance does the water system use for setting water user rates, fees or charges? Consultants assist with a 5-year rate study, a 35% rate increase is projected for FY 26 What is your waters stem bond rating? N/A Is a rate increase necessary as a result of thisproject? Yes What is the Median Household Income (MHI) for the entire system? $78,548 Which, if any, of the following activities must be undertaken to implement the DWSRF project? Acquire privatel held land? Yes ❑ No Acquire land held by another public waters stem entity? Yes ❑ No ❑ Enter into inter -local or inter -project sponsoring agency's agreements? Yes ❑ No Does the system have an annual budget with a separate reserve account for equipment replacement and/or capital improvement? Yes ❑ No ❑ Does the system have a capital improvementplan? How many years does it cover? 10 rs Yes ® No ❑ Does the system have a governing board of directors? Yes ® No ❑ Does the waters stem employ the services of a professional engineer? Yes ® No ❑ Are there procedures for billing and collection? Yes ® No ❑ Does the system have audited financial statements? Yes ® No ❑ Are there standard purchasing procedures that provide controls over expenditures? Yes ® I No ❑ What year will construction be completed and repayments begin for the first project)? August 2032 What is the estimated cost of your SRF project? $70,130,000, split into 2 separate projects Please attach a copy of the user charge ordinance. Table 1 WATER RATE REVENUE SUMMARY LAST YR. YEAR 1 YEAR 2 YEAR 3 SRF Project 24/25 (Current Year) 25/26 26/27 27/28 31/32 1. Number of Residential Customers 5,286 5,546 6,000 6,500 7,316 2 Number of New Residential Service 500 260 454 500 213 Connections 3 Annual Residential Water Sales 379,615,000 398,291,000 431,430,000 467,382,500 526,043,121 (Gallons) gallons gallons gallons gallons gallons Avg Daily Residential Usage (Gal/day) 4. (Line 3 divided by line 1 divided by 197 gal/day 197 gal/day 197 gal/day 197 gal/day 197 gal/day 365 5. Annual Residential Water Sales ($) $2,624,254 $2,633,245 $3,554,881 $4,799,089 $6,452,542 6 Average Annual Residential Bill (line 5 $496 $475 $592 $738 $882 divided by line 1 7 Annual Residential Bill Amount $91,518 $127,205 $139,926 $153,918 $225,351 Uncollected 8 Total Residential Rates Collected (Line $2 532,736 $2,506,040 $3,414,955 $4,645,171 $6,227,191 5 minus line 7 9 Impact and Connection Fees per $15 $15 $15 $15 $15 Residential Service 10. Total Residential Impact and $7,500 $3,900 $6,810 $7,500 $3,196 Connection Fees Line 2 times line 9 11. Number of Commercial Customers 1055 1050 1053 1056 1069 12 Number of New Commercial Service 91 -5 3 3 3 Connections 13. Annual Commercial Water Sales 269,801,000 259,711,000 264,082,628 264,874,876 268,067,707 Gallons gallons gallons gallons gallons gallons 14. Annual Commercial Water Sales ($) $1,818,546 $1,819,098 $2,455,782 $3,315,306 $4,225,400 15. Annual Commercial Bill Amount $19,529 $28,240 $31,064 $34,170 $50,029 Uncollected 16. Total Commercial/Industrial Bills $1,799,017 $1,790,858 $2,424,718 $3,281,136 $4,175,371 Collected Line 14 minus line 15 17 Impact and Connection Fees for $15 $15 $15 $15 $15 Commercial Service 18. Total Commercial Impact and $1,365 $0 $45 $45 $45 Connection Fees Line 12 times line 17 19. Bulk Water Sales 0 0 0 0 0 20 Total Projected Water Revenue (Line $4,340,618 $4,300,798 $5,846,529 $7,933,852 $10,405,803 8+10+16+18+19 * Large meters should be checked annually for accuracy. Instructions for Completing Table 1 Identify the source of the above information and explain methods used to develop the projections (Attachment # 1). Include an explanation of any revenue and expense growth or other adjustments; for example, any rate increases, service growth, inflation adjustments, expense adjustments reflecting the cost of operating additional facilities, or other considerations. In completing this table assume through year 3 that no SRF project is constructed. In the " SRF Project" column enter the numbers that reflect the first year in which the SRF loan will begin repayments. When completing the numbers in this column assume that the SRF project will be financed using 100% loan funding. Line 1 Include the actual number of customers for last year and year 1 (current year). The numbers in years 2 and 3 should reflect an estimated number of residential customers, adjusted for growth. In the SRF column include the expected number of customers based on constructing your SRF project. Line 2 This line is a subset of line 1. It should reflect the number of new customers for that year. Line 3 This line is your total volume (gallons) of water used by your residential customers. Use actual gallons sold for Last Year and do an estimate for the current year based on total to -date. To determine Year 2 and 3 water sales, first calculate the average daily residential usage in gallons per day on line 4. The estimated water sales for Year 2 and 3 can now be determined by multiplying line 4 by line 1. Line 4 This is the average daily residential usage (gallons per day) by a single residential customer. To get this number divide line 3 by line 1. Use Last Year and Current Year to project usage for Year 2 and 3. Usage should be fairly constant. Line 5 This is your total residential water sales in dollars. Year 2 and 3 water sales should reflect any increases in rates (i.e. due to inflation). In the SRF column list what the sales would need to be if the SRF project was a 100% loan (to meet all expenses). Line 6 To obtain the average annual residential bill, divide line 5 by line 1. Line 7 This is the amount of the uncollected residential bills outstanding for the year. Line 8 Line 5 minus line 7. Line 9 This line is the impact and connection fee for new residential service. Line 10 Multiply line 2 by line 9. Line 11 Include the actual number of customers for last year and year 1 (current year). The numbers in years 2 and 3 should reflect an estimated number of commercial customers, adjusted for growth. In the SRF column include the expected number of customers based on constructing your SRF project. Line 12 This line is a subset of line 11. It should reflect the number of new customers that will be charged an impact or connection fee. Line 13 This line is your total volume (gallons) of water used by your commercial accounts. Line 14 This is your total commercial water sales in dollars. Year 2 and 3 water sales should reflect any increases in rates (i.e. due to inflation). In the SRF column list what the sales would need to be if the SRF project was a 100% loan (to meet all expenses). Line 15 This is the amount of the uncollected residential bills outstanding for the year. Line 16 Total revenue collected for commercial accounts (line 14 minus line 15). Line 17 This line is the impact and connection fee for new commercial/industrial accounts. Line 18 Multiply line 12 by line 17. Line 19 Total revenue for bulk water sales to consecutive systems. Line 20 Total of line 8+10+16+18+19. 4 TABLE 2 INCOME, EXPENSES, AND CASH FLOW STATEMENT Income, Expense, and Cash Flow Statement Last Yr. 24/25 Year 1 25/26 Year 2 26/27 Year 3 27/28 SRF Project 31/32 OPERATING REVENUES 1 Water Rates $4,340,618 $4,300,798 $5,846,529 $7,933,852 $10,405,803 2 Fire Protection $10,099 $10,402 $10,714 $11,035 $12,421 3 Fees and Services $242,307 $249,577 $257,064 $264,776 $298,008 4 Interest Income 0 0 0 0 0 5a Other - Miscellaneous Revenue $55 $918 $75 $75 $75 5b Other - Development Assistance Fee $104,568 $61,948 $63,806 $65,720 $73,969 6 Total (Lines 1 - 5) $4,697,647 $4,623,643 $6,178,188 $8,275,459 $10,790,276 NON -OPERATING REVENUES 7 Interest Income 0 0 0 0 0 8 Interf ind Transfer 0 0 0 0 0 9 Proceeds from the Sale of Assets $443 $456 $470 $484 S544 10 Leases and Extraction Fees 0 0 0 0 0 11 Construction Grants $141,668 $145,918 $150,296 $154,804 $174,234 12 Proceeds from Borrowing $5,265,000 $4,765,000 $3,250,000 $29,304,000 $0 13 Equity Contribution 0 0 0 0 0 14 Other - 0 0 0 0 0 15 Total (Lines 7 - 14) OPERATING EXPENSES $5,407,111 $4,911,374 $3,400,766 $29,459,288 $174,778 OPERATION AND MAINTENANCE 16 Salaries (Operators) $623,378 $648,313 $674,246 $701,215 $820,323 17 Benefits $536,840 $552,945 $569,533 $586,619 $660,245 18 Utilities $246,437 $253,830 $261,445 $269,288 $303,086 19 Chemicals & Treatment $52,000 $57,200 $62,920 $69,212 $101,333 20 Monitoring $10,000 $10,000 $10,000 $10,000 $10,000 21 Materials, Supplies & Parts $190,000 $195,700 $201,571 $207,618 $233,676 22 Transportation 0 0 0 0 0 23 Purchased Water Costs 0 0 0 0 0 24 Outside Services - 0 0 0 0 0 25 Other - 0 0 0 0 0 26 Total (Lines 16 - 25) $1,658,655 $1,717,988 $1,779,715 $1,843,953 $2,128,664 ADMINISTRATIVE 27 Salaries and Benefits $563,828 $580,742 $598,164 $616,109 $693,436 28 Building Overhead 0 0 0 0 0 29 Office Supplies & Postage $1,500 $2,100 $2,184 $2,271 $2,657 30 Insurance 0 0 0 0 0 31 Customer Billing & Collection $98,252 $101,200 $104,236 $107,363 $120,838 32 Accounting and Legal 0 0 0 0 0 33 A/E & Professional Services $79,000 $132,000 $138,600 $145,530 $176,893 34 Other - 0 0 0 0 0 35 TOTAL (Lines27 - 34) $742,580 $816,042 $843,184 $871,274 $993,824 36 Net Operating Income Line 6 minus 26 minus 35 NON -OPERATING EXPENSES $2,296,412 $2,089,613 $3,555,289 $5,560,232 $7,667,788 37 Debt -Repayment- Principal and Interest $919,000 $919,000 $919,000 $919,000 $5,477,499 38 Capital Improvements Acquisition of Plant Equipment $27,266 $28,629 $30,061 $31,564 $38,366 39 Interf ind Transfers 0 0 0 0 0 40 To General Fund $942,435 $977,708 $1,007,039 $1,037,250 $1,167,435 41 To Replacement Fund 161,989 161,989 161,989 161,989 161,989 42 To Emergency Fund 0 0 0 0 0 43 Depreciation Expenses (If money is set aside 0 0 0 0 0 44 Other - 0 0 0 0 0 45 TOTAL (Lines 37 + 44) $2,050,690 $2,087,326 $2,118,089 $2,149,803 $6,845,288 46 Net Non -Operating Income Line 15 minus Line 45 $3,356,421 $2,824,048 $1,282,677 $27,309,485 -$6,670,510 47 Net Income Before Taxes Lines 36 + 46 $5,652,833 $4,913,661 $4,837,966 $32,869,717 $997,278 TAXES (N/A for publicly owned systems) 48 Income Taxes 49 Other Taxes 50 TOTAL (Lines 48 + 49) 0 0 0 0 0 51 Net Income After Taxes (Line 47 minus 50) $5,652,833 $4,913,661 $4,837,966 $32,869,717 $997,278 Instructions for Completing Table 2 Identify the source of the above information and explain methods used to develop the projections (Attachment # 1). Include an explanation of any revenue and expense growth or other adjustments; for example, any rate increases, service growth, inflation adjustments, expense adjustments reflecting the cost of operating additional facilities, or other considerations. REVENUES- Revenues include all sources of income to the system. They are separated on this form as: "Operating", lines 1-6 and "Non -Operating", lines 7-15. When using the subcategory "other" under any item, please write a descriptive term. EXPENSES- Expenses include all those activities or purchases which incur cost for the system. Expenses can be estimated in various ways. One method bases the projections on historical expense. This can be accomplished by using historical costs and escalating them from known and projected changes. An example of a known change would be an increase in labor costs for the budget period due to known or anticipated salary increases. An example of a projected increase or escalation in costs would be a 5% annual inflation rate. Materials and Supplies expense, for instance, would be expected to increase with the projected inflation rate. Expenses are separated on this form in the same fashion as Revenues with further subtopics to more clearly define expenses. When using the subcategory "other" under any item please write a descriptive term and cross out the word "other". Expenses are separated on this form as "Operating", lines 16-26, "Administrative", lines 27-35, "Non -Operating", lines 37-45, and "Taxes" lines 48-50. Lines 1 This line includes all money received for supplying water service. Information should come from completed Attachment 1. Line 2 If a separate fee is charged for fire protection include on this line. Line 3 Include all miscellaneous fees and charges generated by providing water service other than for the actual water service (for example, connection fees, bad check fees, reconnect fees, meter testing fees, etc.). Line 4 Interest earned from cash on hand or on fees financed by the utility. Line 5 If used, please describe. Non -operating revenues are funds generated outside the water system and used by the water system to cover expenses. Lines 7-15 Items should be clear, modify topics if needed. Lines 16-17 Salaries and Benefits (Operators), include all compensation to employees of your system when the work is related to the system's O&M. This account should not include compensation of officers, directors, or general and administrative staff. Volunteer labor cannot be applied. Line 18 Utilities, includes the cost of all electric power, gas, telephone, water (at least account for what is being used at the plant), and any other system -related expenses incurred in producing and delivering water. Line 19 Chemicals and treatment is intended to cover the cost of all chemicals used in the treatment of your water. Line 20 Monitoring, includes all water monitoring costs incurred by the system. This should include both in-house monitoring and analysis costs as well as outside laboratory costs. Line 21 Materials, supplies, and parts means all materials and supplies used in the O&M of the water system and in providing and delivering the water to the customer. Include any repairs or parts needed in producing and delivering water. This would include grease, oil, and minor repairs to equipment. This should not include materials for administrative purposes such as postage, copying or copy machine supplies, billing forms, or letterhead. Line 22 Transportation is intended to include all expenses related to trucks, automobiles, construction equipment, and other vehicle expense used in producing and delivering water to the customer. Line 23 Include the cost of purchasing water. Use only if a consecutive system. Administration expenses are considered overhead but not those directly related to O&M of the daily production and delivery of water to the customer. This category includes billing and administrative costs incurred by the system. For example, all meter reading costs, secretarial costs, postage, publications, reference materials, uncollectible debts insurance accounting services, and all other overhead items belong in this subsection. Lines 27 Salaries and Benefits include all compensation to employees of your system in which the work is related to the administration of the system, such as officers, directors, secretarial, and meter reading salaries and benefits. This account should not include compensation of operators. If an employee performs both operation and meter reading a percentage of their salary should appear under the appropriate topic. For example, if an operator reads meters 25% of the time, 3/4 of their salary should be shown on line 16 and 1/4 of their salary on line 27. Line 28 Overhead associated with the building itself such as, mortgage payment, insurance, taxes, maintenance, etc. Line 29 Office supplies and postage includes all materials and supplies in administration of the water system. This includes office supplies, postage, copier charges, and paper. Line 30 Insurance (Vehicles, Liability, Workers' Compensation) includes all insurance costs associated with the coverage for the vehicles, general liability, workers' compensation insurance, and other insurance costs related to the operation and administration of the system. Line 31 Customer billing and collection should include all expenses specific to this function such as, special billing forms or software. Lines 32 Accounting and legal expenses includes all salaries and wages with legal and accounting functions for the system even if they are outside services. s Line 33 A/E and professional services means all engineering and other professional services expenses associated with water system planning and design requirements. Line 34 Other means expenses such as employee training and water certification requirements (classes, registration fees, travel, etc.), public relations campaigns and public notifications, etc. Also include any recurring expenses that did not fit into any of the above line items. Non -operating expenses are ones that are necessary and paid by the water system, but are not part of daily O&M or Administration of the system. Debt Repayment and Capital Improvements are typical items that may appear on this type of analysis. Lines 37-42 Expenses that are involved in operating or administering the water system that were not considered in the totals appearing on lines 26 and 35 should be shown in these items, modify if necessary. Line 38 Capital improvements include facility and non -facility costs related to: 1) Meeting growth requirements or improving your system's infrastructure to provide better service and reliability to existing customers, 2) replacing or renovating existing facilities, or 3) to ensure compliance with drinking water regulations. Line 39-42 Identify any transfer of funds used to offsets other non -water system related capital expenditures. These lines represent some possible categories, modify if needed. Line 43 Depreciation expense only applies to systems which are currently depreciating investments made in the past (recovery of previously invested funds). Include amounts on this line only if money is actually set aside. Line 44 Include any recurring non -operating expenses that did not fit into any of the above line items. Taxes can be incurred in a variety of ways such as a state utility tax, business and occupation tax, property tax or federal income tax. Each of these taxes can be accounted for separately within the operating budget, modify if necessary. Lines 48-49 Include any incurred taxes. 9 Table 3 SCHEDULE OF PRIOR, PARITY, AND PROJECTED LIENS List annual debt service beginning two years before the anticipated loan agreement date and continuing at least fifteen fiscal years. Include all existing and projected liens on the system. Use additional pages as necessary. Identify Each Obligation I Coverage I lInsured? #1 SRF 590500 #2 SRF 590510 #3 SRF 590520 #4 SRF 590530 #5 SRF 590540 #6 SRF 590550 Annual Debt Service (Principal Plus Interest) Fiscal Year # 1 #2 #3 #4 #5 #6 Total Debt Service Incl. Coverage 24/25 1 $228,248 $144,012 $109,924 $61,899 $105,694 $119,698 $769,475 25/26 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 26/27 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 27/28 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 28/29 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 29/30 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 30/31 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 31/32 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 32/33 $228,248 $144,012 $109,924 $61,899 $105,694 $239,396 $889,173 33/34 $228,2481 $144,0121 $109,9241 $61,8991 $105,6941 $239,3961 $889,173 34/35 -P$228,2481 $144,0121 $109,9241 $61,8991 $105,6941 $239,3961 $889,173 Double clicked on the table 3 to see the subsequent years. 10 SCHEDULE OF PRIOR, PARITY, OR PROJECTED REVENUES AND DEBT COVERAGE FOR RATE -BASED SYSTEM PLEDGED REVENUE (Provide information beginning with the two fiscal years preceding the anticipated date of the first SRF loan repayment.) FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 31 /32 Net Operating Revenues. (a) (Table 2 line 36) $2,296,412 $2,089,613 $3,555,289 $5,560,232 $7,667,788 (b) Debt Service (including required coverage) pledged to all prior, parity, or $769,475 $889,173 $889,173 $889,173 $5,477,499 projected projects (last column of Table 3). (c) Net Revenue (= a — b) $1,526,937 $1,200,440 $2,666,116 $4,671,059 $2,190,289 (d) Attach audited annual financial report(s), or pages thereof, and any other documentation necessary to support the above information. Include any notes or comments from the audit reports regarding compliance with covenants of debt obligations having a prior or parity lien on the revenues pledged for repayment of the SRF loan. (Attachment # ) (e) Attach worksheets reconciling this page with the appropriate financial statements (for example, backing out depreciation and interest payments from operating expenses). (Attachment # ) (f) If the net revenues were not sufficient to satisfy the debt service and coverage requirement, please explain what corrective action was taken. (Attachment # ) (k) Identify the source of the above information and explain methods used to develop the projections (Attachment # ). Include an explanation of any revenue and expense growth or other adjustments; for example, any rate increases, service growth, inflation adjustments, expense adjustments reflecting the cost of operating additional facilities, or other considerations. LIST OF ATTACHMENTS (use additional sheets if necessary) Attachment Table 1 Methods Used Table 2 Methods Used Number E 11 TECHNICAL: Accurate answers to the following questions will help identify the technical strengths as well as areas that may need improving within your system. If a question or section does not apply to your system, please write N/A for not applicable. For questions that ask you to rate your system from 1 to 5, answer 1 for worst case scenario and answer 5 for the best case scenario. • System has current and accurate data showing average and peak gpd used • System's capacity exceeds peak demand by more than 20% (Percentage - %) • System can meet peak demand without pumping at peak capacity for extended periods. • System has an emergency plan in place to meet system demand during a shortage (natural disaster or largest pump/well out, etc.) • System has accurate records indicating types and percentage of customers use: Residential % Commercial % Industrial % Dedicated Irrigation Meter • System has comprehensive water loss program that compares amount of water produced (plant meter) with total delivered through metered and unmetered service connections (system's unaccounted for water is %) Purchase Water Systems NA System has a written agreement with the supplier that: • ensures adequate supply of water during shortage conditions, • does not require the purchase of a minimum amount of water (water is supplied through a meter), • assures supplying water system will remain in compliance with the appropriate State or federal regulations, and • assures purchasing system will be notified of any water quality issues. Yes ® No ❑ Yes ❑ No Yes ® No ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Surface Water Systems and Systems Using Ground Water Under the Influence of Surface Water NA • System has redundancy for all critical treatment components • System monitors raw, settled, and individual filtered water turbidity • System consistently (95% of the time) has a filtered water turbidity of which is within the current standard of .3 NTU • System has the capability to add coagulant before the filter and disinfect at various points in the treatment process • System is evaluating (or has evaluated) changes necessary to meet the Enhanced Surface Water Treatment Rule Some needed changes are: • System is evaluating (or has evaluated) changes needed to meet requirements in the Disinfection By Products Rule Some planned modifications are: Ground Water System NA ❑ • A minimum of two sources of groundwater are provided • Source water protection area provides a minimum 500 foot radius around each drinking water well • Groundwater source capacity equals or exceeds the design maximum day demand and equals or exceeds the design average day demand with the largest producing well out of service • System monitors raw water quality to determine appropriate treatment 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Yes ® No ❑ Yes ❑ No Yes ® No ❑ 123405 12 • System's well(s) have; air/vacuum relief valve, check valve, blow -off, by-pass, meter, working sanitary seal, construction/maintenance records and are properly vented 1 2 3 40 • System routinely monitors drawdown 1 2 3 4 0 Disinfection • System has adequate contact time of 15 minutes following disinfection and before the first user in the distribution system Yes ® No ❑ • Disinfection equipment is regularly inspected and maintained Yes ® No ❑ • A chlorine residual is maintained throughout the distribution system 1 2 3 4 SO Distribution System • System has accurate information, including age, for pipe materials that currently make up the distribution system 1 02 3 4 5 • Water mains providing fire protection are a minimum of 6-inches in diameter Yes ® No ❑ • System is free of severe "water hammer" problems 1 2 3 40 • System tracks ranges of operating pressure, especially during peak demand 1 2 3 40 • System maintains a minimum operating pressure of 20 psi Yes ® No ❑ • Normal operating pressure is kept between 40 and 100 psi 1 2 3 40 • System has a routine leak detection program that uses (type of equipment) , repairs identified leaks quickly, and keeps water loss in the distribution system below %. Average number of leak repairs per year is 1 2 ( 4 5 • System has a cross connection control program in place that addresses: evaluation of each service connection, installation of specified backflow preventer, training, record keeping, annual testing, and education 1 2 3 4 �5 • System is working to eliminate dead ends in the mains 1 2 3 ® 5 • System has a flushing program that operates 365 times a year 1 2 3 ® 5 • System has a map showing the bacteriological, lead and copper, and TTHM (if applicable) sampling points 1 2 0 4 5 • System has accurate "as -built" maps of the distribution system posted that show: location of sources (or intakes), size of mains, dead end mains, valves, curb stops on service lines, and proximity of mains to other utilities (gas, electric, etc.) 1 204 5 • System has a routine valve exercise program 1 2 0 4 5 • All customers are metered and all meters are routinely calibrated 1 2 3 4 ( • Customer complaints are relatively infrequent 1 2 3 0 5 List number of complaints in the past year: Pumping • System has a pump maintenance program that includes annual inspection, scheduling of repair, and routine maintenance that is conducted by a qualified contractor 1 2 0 4 5 • System has standby or emergency power equipment that is routinely tested under load and can provide 100% of the average daily demand for oo days l 2 3 40 Storage • System is able to meet peak demand without the high service pumps running at peak capacity for extended period l 2 3 40 • System has adequate reserve capacity for fire protection. l 2 3 40 Total storage capacity of the system is 1.750m gals • System's G storage tanks receive routine inspection (every 3-5 years) to 13 O determine and schedule any needed maintenance All storage tanks are equipped with an altitude valve to prevent overflowing and are sized appropriately to ensure adequate turnover and no loss of water quality Storage tanks are covered and the surrounding areas are fenced Storage tanks have a drain valve and an entry hatch to allow access for cleaning and painting of the interior of the tank 1 2 3 4 5 1 2 3 40 1 2 3 4 0 1 2 3 40 14 MANAGERIAL: Answering the next set of question will help the system clearly define responsible parties, staffing needs, operational needs, policies, and internal standard that guide system performance. For questions that ask you to rate your system from 1 to 5, answer 1 for worst case scenario and answer 5 for the best case scenario. • System has a current organizational chart and accompanying position descriptions that clearly define responsibilities of staff members 1 2 3 40 • The plant is a category plant operating 24 hours per day. List names, class, and license numbers for all operators fulfilling staffing requirements: Tonv Hohmann C16805 Sean Callaghan C27529 • System is satisfied with service provided by contract operator(s) NA 1 2 3 4 50 • The operator's authority and responsibilities are clearly defined 1 2 3 40 Policies and Plans: Please indicate with a check mark the items for which the water system has written policies or plans. ❑ standard specifications ❑ connection policies ❑ main extension policies ® bacteriological sampling plan ❑ emergency operation plan ® Lead & Copper sample plan ❑ cross connection control plan ® record management plan ® TTHM ❑ general rules ❑ disconnection policy ❑ public education & outreach ❑ disaster response plan ❑ personnel policy ❑ Safety/Risk Management Policy • Based on the answers above the system has: clear organizational structure, defined staffing requirements, and appropriate rules/policies 1 2 3 4 05 Operations and Maintenance: The items that follow are elements that may be contained in a thorough Operations and Maintenance (O&M) manual. A complete O&M manual is useful as a quick reference for anything from trouble shooting to emergency procedures. Please indicate with a check mark those items contained in the system's O&M manual. Introduction and Overview ❑ System name ❑ System ID# ❑ location ❑ design flow capacity ❑ type of treatment ❑ water source ❑ available training ❑ publications available ❑ Statement of the purpose of the manual and relay to the operator how to best obtain pertinent information ❑ organizational chart (note which activities require qualified and licensed/certified personnel) General System Description ❑ a flow schematic (source to distribution) ® pumping capabilities (source, chemicals, and high service) ® storage (raw, finished water, and chemicals) ❑ system map showing location of all wells, intake structures, pumping stations, storage tanks, and the defined service area System Operation and Control ❑ identification of major system components including a description of the normal operation of each component ❑ possible alternative operation modes and circumstances under which they would be used ❑ schematic diagrams of each treatment process 15 ❑ preventative maintenance program (include inspections performed when the facility is off-line) ❑ common operating problems with methods of bypassing while being repaired ❑ importance of and how to use laboratory tests for process control ❑ routine system operation for each major system component this should include startup and shutdown procedures, safety procedures, and meter reading ❑ evaluation of overall system performance Laboratory Testing ® identification of samples and tests needed for compliance as well as for process control. ® sampling locations, time, and methods ® how to interpret laboratory results and the use of these results to improve the process ® what should be in laboratory supply and chemicals inventory ® list of laboratory references; ® instructions for filling out worksheets for a sample (include completed example) ® for tests to be performed by outside laboratories, the name of the laboratory, contact person, telephone number, and method of requesting sample pick-up or schedule for sample pick-up Records and Reports Section ❑ a general explanation of the purpose and importance of accurate records and reports ❑ a log of complaints and responses ® daily logs, maintenance records, laboratory records, monthly reports, monitoring reports, sanitary surveys, annual reports, operating cost reports, and accident reports. ® historical records (permits, standards, pumping capacity, consumption, and drawdown) ❑ list of equipment warranties and provisions ® specific area for filing records ® procedures for reporting to appropriate agencies (specify how long records should be kept) Maintenance ❑ general information including purpose and value of scheduled and preventative maintenance ❑ preventative maintenance schedule and sample worksheets with instructions ❑ specifications for fuels, lubricants, filters, etc. for equipment ❑ troubleshooting charts or guides which reference pages in manufacturers' O&M manual or system's O&M manual as appropriate ❑ a record of data plate information on each piece of equipment maintained, this should include manufacturers' maintenance schedule for routine adjustments ❑ a work order system for maintenance of equipment with sample forms to accurately track O&M costs for each piece of equipment ® brief operation instructions for each piece of equipment with reference to the manufacturers' technical specifications for major system components ❑ a mechanism for storage and check out of specialized equipment used infrequently ❑ list of outside contract maintenance tasks ® contact person and phone numbers for equipment manufacturers, major suppliers, and all utilities serving the system ❑ list of special tools used and how to replace ® stocks of spare parts, supplies, chemicals and other items vital to system operation ❑ a system of requisitions and/or work orders used to distribute parts, supplies, chemicals, etc. for reorder purposes Emergency Response Program ❑ pre -response activity such as; personnel assignments, emergency equipment inventory, filling a storage tank before a storm hits, copies of all emergency numbers. Laminated copy of phone numbers to keep readily accessible should include water system personnel responsible for making decisions in specific situations; including name, job title, home and work phone number (pager/cell phone number if available), police, fire departments, and for chemical spills or exposure CHEMTECH 800-424-9300. 16 ❑ safety procedures for all personnel involved in the response ❑ a contingency plan to ensure proper treatment of water even in adverse conditions which may include agreements with nearby water systems for equipment or personnel ❑ procedures for putting standby and emergency sources into active service ❑ procedures for notifying customers, the local health jurisdiction, and EPA of water quality problems ❑ systematic procedure for returning to normal operation Appendix The appendix can contain documents and other information that cannot be easily incorporated into the body of the manual. Large documents such as copies of plans and specifications may be stored separately from the main manual. The following list has examples of items that might be included in appendices. Please check all that apply to your O&M Manual. ❑ Detailed design criteria ❑ User Charge System ❑ Approved shop drawings ® Schematics ❑ Piping color codes ® Valve indices or schedule ® As -built drawings ❑ Drinking water rules/Ordinance ® Manufacturers' manuals • Based on the answers above please rate the system's current O&M Manual. 1 2 03 4 5 The last set of questions is designed to help you evaluate the systems' source(s). Please read the item then circle the number from 1 (needs improving) to 5 (top notch) that you feel best describes your systems' current status relative to that item or check boxes as appropriate. • System has an active Source Water Assessment Program For Ground Water Systems: • System has accurate historical information (like well driller's log and construction records) for each well • Well(s) have the "zone of contribution" identified on a map • No storage of potential contaminants in close proximity of well(s) • Well(s) are housed and fenced and have an appropriate concrete pad • Well casing(s) extend at least 12" above floor or ground Name of aquifer is known: ® Yes ❑ No Aquifer is: Floridian ® Confined ❑ Unconfined For Surface Water Systems: • Commercial, industrial, or agricultural operations up stream are identified • System has provided a contact to these facilities in case of an accidental release • System performs up stream monitoring • System has a raw water reservoir of gallons that acts as a buffer Overall: • System has adequate knowledge and program activity to protect and ensure an adequate supply of drinking water 10 years into the future 1 2 3 4 5 1 2 3 40 1 2 3 4 5 1 2 3 4 05 1 2 3 4 50 1 2 3 40 l 20 3 4 5 l 2 3 4 0 l 2 3 40 l 2 3 40 l 2 3 ®5 17 CERTIFICATION: I, the undersigned authorized representative of the applicant, hereby certify that all information contained in this form and attachments is true, correct, and complete to the best of my knowledge and belief. I also certify that I have been duly authorized to file the business plan and to provide these assurances. Signature Of Authorized Representative Name (Please Print) Title Address City Phone Fax State Zip 18 City of Longwood FINAL Drinking Water Facilities Plan Appendix I: Approved City Ordinance City of Longwood Drinking Water Facilities Plan FINAL cph ORDINANCE NO. 26-2282 AN ORDINANCE OF THE CITY OF LONGWOOD, FLORIDA, RELATING TO WATER AND WASTEWATER UTILITIES; AMENDING APPENDIX B — FEE SCHEDULE OF THE LONGWOOD DEVELOPMENT CODE RELATING TO FEES AND CHARGES REFERENCED IN CHAPTER 90, ARTICLE VI, SECTION 90-181 OF LONGWOOD CITY CODE TO ADOPT REVISED WATER AND WASTEWATER UTILITY RATES AND FEES; AMENDING CHAPTER 90, ARTICLE II, SECTIONS 90-40 AND 90-49 OF LONGWOOD CITY CODE TO ADDRESS CONNECTIONS, WATER METERS AND COLLECTION OF PAST DUE WATER AND WASTEWATER SERVICE CHARGES; PROVIDING FOR CONFLICTS, CODIFICATION, SEVERABILITY AND AN EFFECTIVE DATE. WHEREAS, the City of Longwood (the "City") owns and operates a water and wastewater utility systems within its water and wastewater services area; and WHEREAS, the City Commission of the City of Longwood (the "City Commission") deemed it desirable to have a Water and Wastewater Rate Study performed, and such study supports a modification in rates, fees and charges; and WHEREAS, the City Commission has determined that in order to generate funds for present and future needs, administration, operation and long-range projects, including a new water treatment plant, it is necessary to increase water and wastewater rates; and WHEREAS, the City desires to amend Appendix B — Fee Schedule concerning certain water and wastewater fees and charges charged under Chapter 90, Longwood City Code; and WHEREAS, the City has authority to adopt this Ordinance under its Florida Constitutional Home Rule authority, its Charter and under Sections 163, 166 and 180, Florida Statutes; and WHEREAS, the City has notified each customer of the utility system through the regular utility billing process of this ordinance in accordance with section 180.136, Florida Statutes, and the City has provided the additional notice contemplated pursuant to section 180.136, Florida Statutes, relating to the date, time, and place of the meeting of the City Commission at which the increases stated herein will be considered; and WHEREAS, the City Commission finds that the amendments to the Code adopted by this Ordinance are in the best interest of and for the health, safety and welfare of the citizens of the City and users of the City utility system. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF LONGWOOD, FLORIDA, AS FOLLOWS: Section 1. Recitals. The above recitals are true and correct and incorporated herein as legislative findings. Section 2. Adoption of revisions to water and wastewater rates, fees and charges. The portion of Appendix B — Fee Schedule as codified in the Longwood Development Code relating to and incorporated Ordinance No. 26-2282 Page 1 of 8 by reference in the provisions in Chapter 90, Article VI, Section 90-181 of the Longwood City Code is hereby amended and replaced to adopt the following rates, fees, charges and adjustments as set forth in Attachment "A" attached hereto and incorporated herein by this reference. Future adjustments to the rates, fees and charges will be as proscribed in Attachment "A" unless further amended by ordinance. The portions of Appendix B not included in Attachment "A" are not being amended. Section 3. Adoption of Code Amendment. Sections 90-40 and 90-49 of Article 11 of Chapter 90, Longwood City Code is hereby amended to read as follows (underlined language are additions, _+r*^ke_H thre, ^" language are deletions, and sections not included are not being amended): Sec. 90-40. - Connections and meters. (a) Except as provided in subsection (b), €each separate dwelling unit within each building designed or used for residential purposes shall be considered a separate unit for the payment of the water and/or wastewater fees herein established, and a separate connection shall be required for each such unit. Each connection shall be separately metered. (b) For apartment complexes having more than ten dwelling units, the city shall have the right to require a master meter to serve all the dwelling units, administrative buildings and amenities if the director determines such is in the best interest of the city. For existing customers within an apartment complex having more than ten dwelling units, the director may require the conversion to and use of a master meter if determined to be in the best interest of the city based on previous utility account collection issues or issues with the city obtaining access to and from individual water meters and/or utility connections. (bc) Each separate unit within a commercial or industrial use building shall be considered a separate unit for the payment of the water and/or wastewater fees herein established, and a separate connection shall be required for each such unit. Each connection shall be separately metered. (cd) Buildings which are combined residential/commercial shall be considered as one commercial connection if they are owner -occupied and no subunit is rented, leased or sold. (de) Subject to approval from the director, an €existing customers -who wishes to convert from a master meters to individual meters s4A may be permitted to do so at their own expense.. J MW ^,-^+< <";;" (ef) Residential customers who wish to have an irrigation meter installed or an existing irrigation meter replaced shall pay the connection fee as set forth in appendix B. The city may adopt policies to allow the payment of the connection fee by an existing residential customer over a 12 month period for the installation or replacement of an irrigation meter. Sec. 90-49. Late charges; discontinuance of service; collections*^F~ GRjtUFRGff GhaFges. (a) Late charge. The city reserves the right to levy a late charge of the greater of ten percent of the balance due or a charge as set out in appendix B for nonpayment of utility bills. This charge shall be Ordinance No. 26-2282 Page 2 of 8 automatically added to each bill in arrears without notice to the customer. As a courtesy and in the city's discretion, a late fee may be waived once in a 12-month period. Upon failure by the eustemer to pay such late charge with all charges On aFre-arS Seve-In Sh-Usiness days ef the date the .1-ate fee is assessed, the charge and -II hills have been paid in full (b) Discontinuance of service. Upon failure by the customer to pay any fees or charges in arrears more than fifteen days of the date the applicable fee or charge is due, the city may immediately discontinue furnishing public utilities service to the delinquent account until the late charges, reconnection charge and all amounts in arrears have been paid in full. The city reserves the right to levy a disconnection and reconnection service charge as set out in appendix B. In accordance with F.S. § 180.135, the city may not refuse or discontinue water or sewer services to the owner of any rental unit or to a tenant or prospective tenant of such rental unit for nonpayment of sewer service charges incurred by a former occupant of the rental unit who contracted directly with the city for such sewer services and Drovided such former occupant was not the Droaerty owner and Drovided the Drovisions of subsection (d) do not aaDly. (c) Access right. As a condition of accepting utility services from the city, the city shall have an irrevocable right of entry to and upon private property in order to access the water meter and utility connections to customer's dwelling or structure receiving utility services from the city in order to make connections and disconnections of utility services. A property manager and owner of a multi -family building shall permit the city access to and from the location of utility services connections for the purpose of making utility connections and disconnections. Such failure or refusal by a property manager and owner of a multi -family building shall be considered a violation of this section and constitute the aiding and abetting of the theft of utilities. Upon such failure or refusal by a property manager or owner of a multi -family building to cooperate in providing access to the city, the city shall have the right to disconnect all multi-familv buildines. dwellines units. administrative buildines and amenities on such property or any portion thereof from the city's utility lines and services. (d) Refusal of service. The city may refuse water and sewer service to any prospective customer that is "related entity" to current or former water or sewer service customer who has a delinquent water or sewer service account until such delinquent account is paid in full. For the purpose of this subsection, "related entity" means any entity for which: (i) has any one or more of the same members, officers or directors as a delinquent water or sewer service customer; (ii) any member, officer or director of such entity has a delinquent water or sewer service account; (iii) is a parent or subsidiary entity of a delinquent water or sewer service customer; or (iv) is the same entity as a delinquent water or sewer service customer but may operate under a different name whether by way of merger, name change or different fictitious name. The city may rely on a review of the State of Florida, Department of State, Division of Corporations records for making determinations of related entity status. The city shall have the right to require a prospective customer sign a sworn statement attesting that such prospective customer is not a related entity to any current or former water or sewer service customer who has a delinquent water or service account, and in the event the city later determines such sworn statement to be untrue. the citv shall have the right to immediatelv disconnect water and sewer services until the delinquent service account(s) is paid in full. e Liens. (1) The city shall have a lien on all lands or premises served by its water and sewer system for all late fees and penalties imposed under this article and service charges for water and sewer services Ordinance No. 26-2282 Page 3 of 8 provided until paid, which lien shall be superior in priority to all other liens on such lands or premises, except the lien of state, county and municipal taxes, and shall be on a parity with the lien of such state, county and municipal taxes and other municipal liens. Such lien shall arise at the time of connection of water or sewer service to such lands or premises and shall be due and payable at the time of delinquency of any unpaid water and sewer fees and service charges. The city will not record a lien for water and sewer service fees and charges that is not permitted by F.S. § 180.135. (2) The city shall serve, by certified mail -return receipt requested and regular U.S. Mail, a notice of non-payment to the customer at the service address and the current owner of the property based on the ownership information appearing on the Seminole County Property Appraiser website. Provided the city sends the notice of non-payment, the customer's and/or current owner's failure to receive delivery of such notice of non-payment shall not invalidate or otherwise impact the city's ability to place and foreclose a notice of lien against the applicable property. 3) The notice of non-pavment shall contain: (i) A description of the property; (ii) Advise the customer and the property owner of the amount due and the fee and/or charges that were not paid: and (iii) Advise that in the event the fees and/or charges are not paid within 30 calendar days from the date of the notice of non-payment, that a notice of lien may be recorded in the official records of the county and such notice of lien may be foreclosed upon by the city to collect the outstanding sums owed plus accrued interest and attorneys' fees and other collection expenses. (iv) If the amount set forth in the notice of non-payment is not paid within 30 days from the date of the notice of non-payment, then (1) The outstanding balance owed to the city shall accrue interest at the rate of 12 percent per annum until such amount is paid in full; (2) The city may proceed to record a notice of lien against the applicable Property in the official records of the county; and (3) A copy of the notice of lien shall be served by U.S. Mail to the customer and the property owner at the same addresses as set forth in subsection (b) above. (4) After the expiration of 30 days from the date of recording of the notice of lien, a suit may be filed to foreclose said lien. Such foreclosure proceedings shall be instituted and prosecuted in conformity with the procedures for the foreclosure of liens as set forth in the Florida Statutes. The city shall also have the right to bring an action for monetary judgment to collect past due amounts owed with or without having first recorded a notice of lien. (5) The owner shall be responsible for and the city shall be entitled to reimbursement for the payment of all collection expenses and costs, including attorneys' fees and litigation costs and Ordinance No. 26-2282 Page 4 of 8 recording and filing fees, incurred by the city in the collection of fees and charges, filing of liens and in actions to foreclose such liens or actions for a monetary iudgment. (6) The collection and enforcement procedures set forth in this section shall be cumulative with, supplemental to and in addition to, any applicable procedures provided in any other ordinance or administrative regulations of the city, any applicable law or administrative regulation of the state, or any agreement. Failure of the city to follow the procedure set forth in this section shall not constitute a waiver of its rights to proceed under any other ordinances or administrative regulations of the city, any applicable law or administrative regulation of the state, or any agreement. (f) Payment plans. The city manager, or his/her designee, is authorized to grant payment plans to customers with delinquent utility accounts who request a plan in writing. The total term of any payment plan shall not exceed twelve (12) months from the effective date of the plan; provided, however. that for a customer who is a tenant of leased premises, the term shall not exceed the earlier of twelve (12) months or the last day of the customer's current lease term as evidenced by a copy of said lease provided to the citv. Renewal or successor lease terms shall not extend the maximum term. Each t plan shall be in writing and shall reauire the customer to remain current on all charges for ongoing service during the plan's term. Default in any installment or in any current bill shall accelerate the entire balance and authorize discontinuance of service. (g) Bona fide disputes. A customer who in good faith disputes the amount of a utility bill may submit a written dispute to the city manager identifying the disputed charges and the basis for the dispute within ten (10) days of receipt of the bill containing the disputed charge(s). The city manager or his/her designee shall review the customer's dispute and issue a written determination. Discontinuance of service for the disputed charges shall be suspended during the city's review and for ten (10) calendar days following the issuance of the determination. The customer shall remain responsible for all undisputed charges, which shall be paid when due. If the city manager or its designee, while reviewing a customer's dispute finds that the customer was improperly charged. a corrected bill reflecting the uisite adiustment shall be provided to the customer. (h) Administrative policies. The city manager shall have the authority to create, implement and enforce administrative policies implementing with this section, provided such policies are not in conflict with this section. Section 4. Conflicts. If any Ordinances or parts thereof are in conflict herewith, this Ordinance shall control to the extent of the conflict Section 5. Severability. If any section, paragraph, sentence, clause, phrase or word of this Ordinance is determined to be invalid, unlawful or unconstitutional, said determination shall not be held to invalidate or impair the validity, force or effect of any other section, paragraph, sentence, clause, phrase or word of this Ordinance not otherwise determined to be invalid, unlawful or unconstitutional. Section 6. Codification. Sections 2 and 3 of this Ordinance shall be codified and made a part of the City Code of Ordinances; that the Sections and exhibits of this Ordinance may be renumbered or re -lettered to accomplish such intention. The word "Ordinance" may be change to "Section," "Article," or other appropriate word. The City Clerk is given liberal authority to ensure proper codification of this Ordinance, including the right to correct scrivener's error. Ordinance No. 26-2282 Page 5 of 8 Section 7. Effective Date. This Ordinance shall take effect upon final passage and adoption. FIRST READING this _ day of , A.D. 2026. SECOND READING AND ADOPTION this day of , A.D. 2026. Tony Boni, Mayor ATTEST: Liane Cartagena, City Clerk Approved as to form and legality for the use and reliance of the City of Longwood, Florida only. Daniel W. Langley, City Attorney Ordinance No. 26-2282 Page 6 of 8 Water System Rates - Inside City [1] ATTACHMENT "A" Chapter 90. Utilities Effective Through Effective Effective Effective Effective September 30, 2026 October 1, 2026 October 1, 2027 October 1, 2028 October 1, 2029 Monthly Base Rates: Residential All Meter Sizes $15.29 $20.64 $27.86 $34.27 $35.30 Commercial Meter Size 3/4 - Inch $15.29 $20.64 $27.86 $34.27 $35.30 1 - Inch 38.25 51.64 69.71 85.74 88.31 1 1/2 - Inch 76.50 103.28 139.43 171.50 176.65 2 - Inch 122.41 165.25 223.09 274.40 282.63 3 - Inch 229.50 309.83 418.27 514.47 529.90 4 - Inch 382.51 516.39 697.13 857.47 883.19 6 - Inch 765.03 1,032.79 1,394.27 1,714.95 1,766.40 8 - Inch 1,224.03 1,652.44 2,230.79 2,743.87 2,826.19 Volume Rates - per 1,000 gallons: Residential Block 1 (0 to 9,000 Gallons) $3.07 $4.14 $5.59 $6.88 $7.09 Block 2 (9,001 to 18,000 Gallons) 6.14 8.29 11.19 13.76 14.17 Block 3 (18,001 to 27,000 Gallons) 9.20 12.42 16.77 20.63 21.25 Block 4 (over 27,000 Gallons) 12.27 16.56 22.36 27.50 28.33 Commercial All Usage $4.32 $5.83 $7.87 $9.68 $9.97 Wastewater System Rates - Inside City [1] Effective Through Effective Effective Effective Effective September 30. 2026 October 1. 2026 October 1. 2027 October 1. 2028 October 1. 2029 Monthly Base Rates: Residential All Meter Sizes $9.76 $13.18 $15.16 $15.61 $16.08 Commercial Meter Size 314 - Inch $44.67 $60.30 $69.35 $71.43 $73.57 1 - Inch 111.68 150.77 173.39 178.59 183.95 1 1l2 - Inch 223.37 301.55 346.78 357.18 367.90 2 - Inch 357.87 483.12 555.59 572.26 589.43 3 - Inch 670.07 904.59 1,040.28 1,071.49 1,103.63 4 - Inch 1,116.78 1,507.65 1,733.80 1,785.81 1,839.38 6 - Inch 2,233.53 3,015.27 3,467.56 3,571.59 3,678.74 8 - Inch 3,578.74 4,831.30 5,556.00 5,722.68 5,894.36 Volume Rates - per 1,000 gallons: Residential All Flows - Per Account $8.33 $11.25 $12.94 $13.33 $13.73 Commercial All Flows - Per Account $9.98 $13.47 $15.49 $15.95 $16.43 1] A surcharge of 25% is applied to all customers located outside city limits as allowable by F.S. § 180.19l(1) Ordinance No. 26-2282 Page 7 of 8 Annual Price Index Rate Adjustment 1.0 The City shall automatically adjust and increase the Service Rates and Fees for the sections entitled Water System Rates -Inside City, Wastewater System Rates -Inside City, and Reclaimed Water System Rates -Inside City (includes residential and commercial service base rates and volume rates) (hereinafter referred to as the "Applicable Rates") annually by applying a price index factor established for that year as provided in this section. All Applicable Rates so adjusted (the "Indexed Rates") shall be implemented by the City. The purpose of the price index adjustment is to offset the estimated effects of inflation on the cost of operating and maintaining the utility system. 1.1 Adjustment Schedule. Each implementation of Indexed Rates ("Rate Indexing") shall occur without a public hearing. Rate Indexing shall not be employed more than once in any fiscal year and the Indexed Rates shall be implemented by the City on October 1st of the year in which the price index factor was determined. Nothing herein shall preclude the City from making additional changes to the Applicable Rates in any year by the City. 1.2 Price Index Factor. A price index adjustment factor expressed on a percentage basis as determined annually (hereinafter referred to as the "Price Index Factor") shall be applied to the Applicable Rates. The Price Index Factor to be applied by the City shall be equal to the percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index — All South Urban Consumers (Series ID: CUUR0300SA0) when comparing the index for the month of April reported for the current year to the index reported as of the month of April for the immediately preceding year. In no event shall the annual Price Index Factor be greater than five percent (5.0%) or less than zero percent (0.0%). 1.3 Determination of Indexed Rates. Beginning on October 1, 2030, and annually thereafter, the Applicable Rates shall be adjusted by an amount equal to the Price Index Factor as determined in the prior fiscal year. The Indexed Rates resulting from the application of the Price Index Factor shall be rounded to the nearest cent. Ordinance No. 26-2282 Page 8 of 8